Original source · versioned page text
Stormwater Management Report
Attached to the e-mail Response to Information Request - MCU18/0120, RAL18/0013, OPW18/0197.
Original PDF page 20, section 2. The text section number identifies this passage in the reader.
COOROY
REVISION
A PC 06/07/18 Issue for BA Job No.: 18-0165 1. Do not scale drawings.
2. Scale is correct at A1.
CLIENT: HASS HOLDINGS PTY LTD
Dwg No.: C03 3. Check and verify all dimensions
Designed By : B.J. WINNING BEngTech (Civil) Drawn By : PC Date : 29/05/18 prior to commencement of work.
Certified By : B.R. CROMAR BEng (Civil), MIEAust, CPEng, RPEQ, NPER Date : 11/09/18 Ph: (07) 5444 5578 Email: [email protected] STORMWATER DRAINAGE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.