Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - stormwater report

of 32

Page text read automatically using OCR, there may be inaccuracies

                            Catchment
                               A01




Figure 2-1: WSUD Catchment and Locality Plan

2.3.3 MUSIC Model Layout
As the management of urban stormwater needs to take a holistic approach, specific
management measures need to be implemented in series to form a treatment train. The
correct utilisation of various devices within the treatment train is imperative to target
the desired pollutants, from the gross solids to the fine colloidal partials. Figure 2-2
shows the MUSIC model layout for the development.




Figure 2-2: MUSIC Model Layout



                                                                                       8

Log in to download the original (RFI - stormwater report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.