Appendix E Civil Engineering Plans · RAL25/0004

of 46

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 36, section 1. The text section number identifies this passage in the reader.

                        BIORETENTION SYSTEM SPECIFICATIONS                                                                                                                                                                            9.     TRANSITION LAYER                                                                         14.4. PLANTS SUPPLIED TO SITE MUST:
                                                                                                                                                                                                                                      TRANSITION LAYERS PREVENT FILTER MEDIA MIGRATING INTO THE DRAINAGE LAYER.                             14.4.1. BE GROWN IN CLEAN, WEED- AND PEST-FREE CONDITIONS;
           1.          REFERENCED DOCUMENTS                                                                                                BIORETENTION SYSTEMS TOLERANCES                                                            9.1.   MATERIALS                                                                                      14.4.2. BE WELL DEVELOPED, SUN-HARDENED AND CONTAIN A FULLY ESTABLISHED ROOT
           THE FOLLOWING DOCUMENTS ARE INCORPORATED INTO THIS SPECIFICATION BY REFERENCE:                                   BIORETENTION ELEMENT                       TOLERANCE (UNLESS SPECIFIED OTHERWISE)                                                                                                                                       BALL THAT DOES NOT CRUMBLE WHEN REMOVED FROM ITS CONTAINER.
                                                                                                                                                                                                                                             9.1.1. TRANSITION LAYER SHALL BE MINIMUM THICKNESS OF 100 mm COARSE SAND
           1.1       STANDARDS                                                                                                                                                                                                               UNLESS OTHERWISE SPECIFIED (TYPICALLY 1 mm PARTICLE SIZE DIAMETER) WITH <2%                    14.4.3. BE AT LEAST 200 MM HIGH.
                                                                                                                                                                       + /- 25 mm (+/- 15 mm FOR STREETSCAPE
                     1.1.1.   AS 1289 - METHODS OF TESTING SOILS FOR ENGINEERING PURPOSES                                   HYDRAULIC STRUCTURES                                                                                             FINES.
                                                                                                                                                                       SYSTEMS)                                                                                                                                                             14.4.4. SHOW NO SIGN OF PEST AND DISEASE
                     1.1.2. AS 1289.5.4.1-2007- SOIL COMPACTION AND DENSITY TESTS--COMPACTION CONTROL                                                                                                                                        9.1.2. A PARTICLE SIZE DISTRIBUTION FOR THE SAND SHALL BE OBTAINED TO ENSURE                   14.4.5. SHOW NO SIGNS OF NUTRIENT DEFICIENCY
                                                                                                                            EARTHWORKS                                 + /-50 mm
                     TEST--DRY DENSITY RATIO, MOISTURE VARIATION AND MOISTURE RATIO                                                                                                                                                          THAT IT MEETS THE FOLLOWING CRITERIA (VICROADS).
                                                                                                                            UNDER-DRAINAGE                             +/- 25 mm                                                                                                                                                            14.4.6. BE FREE FROM WEEDS
                     1.1.3. AS 1289.5.7.1-2006 - SOIL COMPACTION AND DENSITY TESTS--COMPACTION CONTROL                                                                                                                                       9.1.3.   D15 (TRANSITION LAYER) ≤ 5 X D85 (FILTER MEDIA)
                                                                                                                                                                                                                                                                                                                                            14.4.7. BE CLEARLY LABELLED
                     TEST--HILF DENSITY RATIO AND HILF MOISTURE VARIATION (RAPID METHOD)                                    DRAINAGE AND TRANSITION LAYERS             + 25 mm                                                        9.2.   TESTING
                                                                                                                                                                                                                                                                                                                                            14.4.8. BE SUPPLIED IN A CONTAINER THAT IS AT LEAST: 90 MM HIGH X 50 MM WIDE
                     1.1.4.   AS 2758 - AGGREGATES AND ROCK FOR ENGINEERING PURPOSES                                                                                   +/- 25 mm+/-                                                          A SAMPLE OF THE PROPOSED TRANSITION LAYER IS TO BE PROVIDED TO THE
                                                                                                                                                                                                                                                                                                                                      14.5. PREPARING FILTER MEDIA: UNLESS SPECIFIED OTHERWISE, EACH PLANT MUST RECEIVE AT
                     1.1.5.   AS 4419 - SOILS FOR LANDSCAPING AND GARDEN USE                                                                                           40 mm FOR FILTER MEDIA >300 m² PROVIDED THE                           SUPERINTENDENT FOR APPROVAL PRIOR TO INSTALLATION. THE SUPERINTENDENT MAY
                                                                                                                            SURFACE LEVEL                                                                                                                                                                                                   LEAST 10 G OF SLOW-RELEASE NATIVE FERTILIZER IN GRANULAR OR TABLET FORM.
                     1.1.6.   AS 4454 - COMPOSTS, SOIL CONDITIONERS AND MULCHES                                                                                        AVERAGE EXTENDED DETENTION REQUIREMENT IS                             REQUIRE THE TRANSITION LAYER TO BE TESTED TO ENSURE ITS PARTICLE SIZE.
                                                                                                                                                                                                                                                                                                                                            PRE-HYDRATED WATER CRYSTALS MAY BE APPLIED AT 1-2%%% BY WEIGHT.
                                                                                                                                                                       WITHIN 25 mm OF THE DESIGN REQUIREMENT.
           1.2       OTHER PUBLICATIONS                                                                                                                                                                                                                                                                                               14.6. MULCH MUST BE APPLIED IN ACCORDANCE WITH THE DESIGN DRAWINGS, BE APPLIED PRIOR
                     1.2.1. GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (FAWB) - THE                           EMBANKMENTS AND BUNDS                      -25 mm, + 50 mm                                                10.    DRAINAGE LAYER                                                                                 TO PLANTING, PROVIDE COVERAGE OF THE SOIL AND NOT EXCEED 75 MM THICKNESS, AND
                     CURRENT VERSION OF THE GUIDELINE CAN BE FOUND AT http://www.monash.edu.au/fawb/                                                                                                                                  DRAINAGE LAYERS CONVEY INFILTRATED WATER INTO THE SLOTTED UNDER-DRAINAGE PIPES.                       BE KEPT 50 MM CLEAR OF PLANT STEMS. UNLESS OTHERWISE SPECIFIED, MULCH SHOULD
                     1.2.2. CONSTRUCTION AND ESTABLISHMENT GUIDELINES - SWALES, BIORETENTION                                                                                                                                                                                                                                                BE FINE SUGAR CANE MULCH SECURED IN PLACE BY A LOOSE WEAVE JUTE NET PINNED AT
                                                                                                                            7.     MAINTENANCE ACCESS                                                                                 10.1   MATERIALS                                                                                      500 MM CENTRES.
                     SYSTEMS AND WETLANDS (WATER BY DESIGN) http://waterbydesign.com.au/ceguide/
                                                                                                                            MAINTENANCE ACCESS IS PROVIDED IN ACCORDANCE WITH THE DESIGN DRAWINGS.                                           10.1.1. DRAINAGE LAYER SHALL BE COMPRISED OF FINE GRAVEL (NOMINAL 2-5 mm) WITH           14.7. FILTER MEDIA SURFACE AND PLANT STOCK ARE TO BE WATERED IMMEDIATELY PRIOR TO
                     1.2.3. TRANSFERRING OWNERSHIP OF VEGETATED STORMWATER ASSETS (WATER BY                                                                                                                                                  <2% FINES AND A MINIMUM SATURATED HYDRAULIC CONDUCTIVITY OF 400 mm/hr. THE
                     DESIGN) http://waterbydesign.com.au/transferguide/                                                                                                                                                                                                                                                                     PLANTING. UNLESS OTHERWISE SPECIFIED, PLANTS SHOULD BE PLANTED IN CLUMPS OF
                                                                                                                                                                                                                                             DEPTH OF THE DRAINAGE LAYER SHALL ENSURE AT LEAST 50 mm OF AGGREGATE COVER                     THE SAME SPECIES, AND LARGE MONOCULTURES AVOIDED.
                     1.2.4. TRANSFERRING OWNERSHIP OF VEGETATED STORMWATER ASSETS (WATER BY                                 8.     FILTER MEDIA                                                                                              OVER ALL PERFORATED UNDER-DRAINAGE PIPES.
                                                                                                                                                                                                                                                                                                                                      14.8. PLANT METHOD MUST MINIMISE SOIL COMPACTION AND ENSURE THAT ALL ROOTS ARE
                     DESIGN) http://waterbydesign.com.au/transferguide/                                                                                                                                                                      10.1.2. A PARTICLE SIZE DISTRIBUTION FOR THE GRAVEL SHALL BE OBTAINED TO ENSURE
                                                                                                                            8.1.   MATERIALS                                                                                                                                                                                                COVERED BY AT LEAST 10 - 20 MM OF SOIL, AVOID COVERING PLANT CROWNS.
                     1.2.5. BIORETENTION TECHNICAL DESIGN GUIDELINES (WATER BY DESIGN)                                                                                                                                                       THAT IT MEETS THE FOLLOWING BRIDGING CRITERIA (VICROADS): D15 (DRAINAGE LAYER) ≤ 5
                                                                                                                            A FUNDAMENTAL PART OF BIORETENTION SYSTEMS IS THE FILTER MEDIA. THE MAIN ROLE OF THE                                                                                                                      14.9. UNLESS SPECIFIED OTHERWISE, THE FOLLOWING IRRIGATION SCHEDULE APPLIES DURING
                     http://waterbydesign.com.au/techguide/                                                                                                                                                                                  X D85 (TRANSITION LAYER)
                                                                                                                            FILTER MEDIA IS TO SUPPORT VEGETATION AND REMOVE POLLUTANTS. FILTER MEDIA SHOULD BE                                                                                                                             PLANT ESTABLISHMENT (AT 2.5 - 5 L PER PLANT PER WEEK) - WEEK 1-5 FIVE WATERINGS PER
                     1.2.6.   WATER SENSITIVE URBAN DESIGN FIELD GUIDE (WATER BY DESIGN)                                    LOAMY SAND THAT HAS HIGH PERMEABILITY WHEN COMPACTED. IT SHOULD NOT CONTAIN ANY                           10.2. TESTING                                                                                         WEEK - WEEK 6-10 THREE WATERINGS PER WEEK - WEEK 11-15 TWO WATERINGS PER WEEK
                                                                                                                            RUBBISH OR DELETERIOUS MATERIAL. THE LOAMY SAND SHOULD CONTAIN SOME ORGANIC                                      A SAMPLE OF THE PROPOSED DRAINAGE LAYER IS TO BE PROVIDED TO THE                               - THEREAFTER AS REQUIRED TO SUSTAIN PLANTS UNTIL SUCCESSFUL ESTABLISHMENT
                                                                                                                            MATTER TO IMPROVE WATER-HOLDING CAPACITY AND PLANT HEALTH, BUT IT SHOULD BE LOW IN                               SUPERINTENDENT FOR APPROVAL PRIOR TO INSTALLATION. THE SUPERINTENDENT MAY
           2.          ABBREVIATIONS AND DEFINITIONS                                                                        NUTRIENT CONTENT. THE FILTER MEDIA MUST BE COMPLIANT WITH AS4419 - SOILS FOR
                                                                                                                                                                                                                                                                                                                                      14.10. REPLANTING MUST OCCUR DURING THE ESTABLISHMENT PERIOD IF LESS THAN 90% OF
                                                                                                                                                                                                                                             REQUIRE THE DRAINAGE LAYER TO BE TESTED TO ENSURE ITS PARTICLE SIZE.                            PLANTS SURVIVE.
           2.1.        THE BIORETENTION SYSTEM SPECIFICATION CONSISTS OF THE FOLLOWING ABBREVIATIONS                        LANDSCAPING AND GARDEN USE, AND MEET THE FOLLOWING REQUIREMENTS:
                       AND DEFINITIONS:                                                                                                                                                                                                                                                                                               14.11. SUCCESSFUL PLANT ESTABLISHMENT IN BIORETENTION SYSTEMS IS CONSIDERED WHEN
           2.2.      FILTER: SOIL LAYER WHICH ACTS AS A POLLUTANT FILTER AND SUPPORTS PLANT GROWTH.                                                                                                                                   11.    UNDER-DRAINAGE                                                                                  THE PLANTS ARE ROBUST AND SELF-SUSTAINING, AND MEET THE FOLLOWING CRITERIA. -
                                                                                                                                                                                                                                                                                                                                             VEGETATION MUST COVER AT LEAST 90% OF THE BIORETENTION SURFACE WITH MULCH
           2.3.      IMPERMEABLE LINERS: THE LINER THAT PREVENTS WATER MOVEMENT BETWEEN THE                                                                                                                                           11.1. MATERIALS
                     FILTER AND THE SURROUNDING SOILS AND DEFINES THE EDGE OF THE SYSTEM.
                                                                                                                                                  FILTER MEDIA REQUIREMENTS                                                                                                                                                                  COVERING THE REMAINDER (< 10% MULCH VISIBLE FROM ABOVE) - AVERAGE
                                                                                                                                                                                                                                             EITHER SLOTTED RIGID PIPE (HDPE OR SIMILAR) OR AG-PIPE CAN BE USED FOR                          GROUNDCOVER PLANT HEIGHT MUST BE GREATER THAN 500 MM. - PLANTS MUST BE
                                                                                                                                                           TEST METHOD IN                                                                    UNDER-DRAINAGE AS SPECIFIED IN THE CONSTRUCTION DRAWINGS. WHEN INSTALLING, THE                  HEALTHY AND FREE FROM DISEASE. - NO WEEDS OR LITTER TO BE PRESENT.
           2.4.        TRANSITION LAYER: LAYER TO SEPARATE FILTER LAYER FROM THE DRAINAGE LAYER TO                          PARAMETER                                                    REQUIREMENT
                                                                                                                                                           ACCORDANCE WITH                                                                   FOLLOWING SPECIFICATIONS SHALL BE CONSIDERED:
                       AVOID MIGRATION OF SOILS FROM THE FILTER TO THE DRAINAGE LAYER
                                                                                                                            SATURATED HYDRAULIC
           2.5.      DRAINAGE LAYER: RELATIVELY FREE DRAINING LAYER TO CONVEY INFILTRATED WATER TO                                                         ASTM f1815-11                 50 - 500 mm/hr (200 PREFERRED)                      11.1.1. TYPICALLY 100 MM-SLOTTED HDPE PIPE IS THE PREFERRED TYPE OF RIGID PIPE.
                                                                                                                            CONDUCTIVITY                                                                                                                                                                                              15.   CERTIFICATION AND CHAIN OF CUSTODY
                     THE UNDERDRAINAGE.                                                                                                                                                                                                      11.1.2. THE SLOTS IN THE PIPE SHALL NOT ALLOW THE DRAINAGE LAYER AGGREGATE TO
                                                                                                                            pH                             AS 4419                       5.5 - 7.5                                                                                                                                    15.1. THE FOLLOWING CERTIFICATION AND THE CHAIN OF CUSTODY APPLIES TO BIORETENTION
           2.6.      UNDER-DRAINS: SLOTTED DRAINS COLLECT TREATED STORMWATER FROM THE DRAINAGE                                                                                                                                               FREELY ENTER THE PIPE (UNDER-DRAINAGE WITH SLOT WIDTH OF 2 mm OR SMALLER IS
                                                                                                                            ELECTRICAL CONDUCTIVITY        AS 4419                       <1.2 dS/m                                                                                                                                          MEDIA:
                     LAYER AT THE BASE OF THE BIORETENTION SYSTEM.                                                                                                                                                                           PREFERRED).
                                                                                                                                                                                         <800 mg/kg                                                                                                                                         15.1.1. THE SUPPLIER AND CONTRACTOR ARE RESPONSIBLE FOR ENSURING THE
                                                                                                                            NITROGEN CONTENT               AS 4419                                                                           11.1.3 UNDER-DRAINAGE PIPES MUST NOT BE SURROUNDED BY ANY GEOFABRIC OR SOCK.
                                                                                                                                                                                                                                                                                                                                                    BIORETENTION MEDIA MEETS THE SPECIFICATIONS OUTLINED IN THESE GUIDELINES
           3.          TEST METHODS AND STANDARDS                                                                           PHOSPHORUS CONTENT             AS 4419                       <40 mg/kg                                    11.2. INSTALLATION                                                                                            AND THAT THE CORRECT MATERIAL IS DELIVERED TO SITE. THE SUPPLIER MUST
           3.1.        THE FOLLOWING TEST METHODS AND STANDARDS ARE TO BE USED AS SPECIFIED IN THE                                                                                       3% - 10%                                            11.2.1. THE MAXIMUM SPACING OF UNDER-DRAINS FOR BIO-RETENTION SYSTEMS <100 m2 IS                       ARRANGE FOR TESTING OF THE FILTER MEDIA BY A SOIL LABORATORY CERTIFIED
                       ABOVE GUIDELINES WHEN CONDUCTING TESTS ASSOCIATED WITH THIS SPECIFICATION:                                                                                        WHERE ORGANIC CONTENT IS                            1.5 m FROM CENTRE TO CENTRE. FOR BIORETENTION SYSTEMS >100 m2 THE MAXIMUM                              FOR THE METHODS IN ACCORDANCE WITH THE REQUIREMENTS LISTED ABOVE. ON
                                                                                                                                                                                         BELOW THIS THRESHOLD, THE                           SPACING CAN BE INCREASED TO 2.0 - 2.5 m IF SPECIFIED IN THE CONSTRUCTION DRAWINGS.                     THE BASIS OF THE TESTING, THE SOIL LABORATORY AND SUPPLIER MUST CERTIFY
           3.2.        THE HYDRAULIC CONDUCTIVITY OF POTENTIAL FILTER MEDIA SHALL BE MEASURED USING                                                                                                                                                                                                                                                 THE MATERIAL MEETS THESE SPECIFICATIONS. THE SUPPLIER MUST PROVIDE THE
                                                                                                                            ORGANIC CONTENT                AS 4419                       FILTER MEDIA MAY BE AMELIORATED                     11.2.2. THE UNDER-DRAINS SHALL BE SLOPED TOWARDS THE OUTLET PIT (MIN. 0.5%
                       THE ASTM F1815-11 METHOD                                                                                                                                                                                                                                                                                                     CERTIFICATION AND LABORATORY TEST RESULTS TO THE CONTRACTOR WITH THE
                                                                                                                                                                                         BY ADDING 50 mm OF COMPOST AND                      LONGITUDINAL GRADE) AND THE BASE OF FILTRATION TRENCH SHALL BE FREE FROM
           3.3.      PARTICLE SIZE DISTRIBUTION: AS1289.3.6.1 - 1995                                                                                                                     TINING IT INTO THE TOP 150 mm OF                    LOCALISED DEPRESSIONS. FOR BIORETENTION SYSTEMS WITH A SATURATED ZONE A 0%                             SUPPLY DOCKET.
           3.4.      3.4. SOILS FOR LANDSCAPING AND GARDEN USE: AS4419 - 2003.                                                                                                           FILTER MEDIA.                                       PIPE GRADE IS ACCEPTABLE.                                                                      15.1.2. THE CONTRACTOR PROVIDES A COPY OF THE SUPPLIER'S CERTIFICATION, TEST
                                                                                                                                                                                         CLAY & SILT 3 - 6% (<0.05 mm)                       11.2.3. ALL JUNCTIONS AND CONNECTIONS SHALL BE APPROPRIATELY SEALED.                                   RESULTS AND SUPPLY DOCKET TO THE SITE SUPERINTENDENT OR BIORETENTION
                                                                                                                                                                                         VERY FINE SAND 5 - 30%                                                                                                                                     DESIGNER FOR REVIEW.
           4.          MATERIALS                                                                                                                                                         (0.05 - 0.15 mm)                                    11.2.4.UNDER-DRAINAGE PIPES SHALL BE SEALED INTO THE OVERFLOW PIT.
                                                                                                                                                                                                                                                                                                                                            15.1.3. FOLLOWING REVIEW OF THE CERTIFICATION, TEST RESULTS AND THE SUPPLY
           4.1.      MATERIALS SHALL MEET THE REQUIRED SPECIFICATIONS DETAILED IN SECTION 8 FILTER                                                                                       FINE SAND 10- 30% (0.15 - 0.25 mm)                  11.2.5. ALL UNDER DRAINAGE PIPES TO HAVE RAISED CLEAN OUT POINTS CONSTRUCTED                           DOCKET, THE SITE SUPERINTENDENT OR BIORETENTION DESIGNER APPROVES
                                                                                                                            PARTICLE SIZE DISTRIBUTION     AS 1289.3.6.1 - 1995                                                              FROM NON-SLOTTED PIPES WHICH EXTEND TO 150 mm ABOVE FILTER MEDIA SURFACE
                     MEDIA, SECTION 9 TRANSITION LAYER, SECTION 10 DRAINAGE LAYER, SECTION 11 UNDER                                                                                      MEDIUM TO COARSE SAND 40- 60%                                                                                                                              INSTALLATION OF THE BIORETENTION MEDIA.
                     DRAINAGE, SECTION 12 PERMEABLE LINER, SECTION 13 IMPERMEABLE LINER AND SECTION                                                                                      (0.25 - 1.0 mm)
                                                                                                                                                                                                                                                                                                                                            15.1.4. THE RELEVANT SECTIONS OF THE BIORETENTION MEDIA SIGN-OFF FORM AS PER
                     14 LANDSCAPING OF THIS DOCUMENT. ALL MATERIALS MUST BE CERTIFIED BY THE                                                                                             COARSE SAND 7 - 10% (1.0 - 2.0 mm)
                     SUPPLIER WITH CERTIFICATION AND DELIVERY                                                                                                                            FINE GRAVEL <3% (2.0 - 3.4%)                 12.    PERMEABLE LINER (WHERE SPECIFIED)                                                                      THE CONSTRUCTION AND ESTABLISHMENT GUIDELINES (WATER BY DESIGN) SHOULD
                                                                                                                                                                                                                                                                                                                                                    BE COMPLETED AND SIGNED. THIS SIGN-OFF FORM IS PROVIDED AS PART OF THE
           4.2.      SUPPLY DOCKETS SHALL BE PROVIDED ON REQUEST TO CERTIFY THE MATERIAL DELIVERED                                                                                                                                    12.1. A PERMEABLE GEOTEXTILE LINER FABRIC MUST BE USED TO LINE THE OUTSIDE OF THE
                                                                                                                                                                                                                                                                                                                                                    CONSTRUCTION CERTIFICATION BY THE SITE SUPERINTENDENT OR BIORETENTION
                     IS THE MATERIAL TESTED.                                                                                                                                                                                                BIORETENTION SYSTEM.
                                                                                                                                                                                                                                                                                                                                                    DESIGNER.
                                                                                                                                                                                                                                      12.2. THE LINER MUST EXTEND AT LEAST 500 mm BEYOND THE TOP OF THE SIDES AND MUST BE
                                                                                                                            SOURCE: GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (FAWB) AND                                     KEYED INTO BATTER AND COVERED BY AT LEAST 200 mm OF TOPSOIL.
           5.          TIMING AND EROSION AND SEDIMENT CONTROL                                                              BIORETENTION TECHNICAL DESIGN GUIDELINES (WATER BY DESIGN)                                                                                                                                                16.   HOLD POINTS
                                                                                                                                                                                                                                      12.3. THE LINER MUST BE RESISTANT TO ALL SOIL ACIDS AND ALKALIS, RESISTANT TO
           5.1.      THE TIMING OF CIVIL AND LANDSCAPE WORKS FOR BIORETENTION SYSTEMS MUST BE                               FILTER MEDIA MUST BE FREE OF WEEDS AND PROPAGATES. OTHER CHARACTERISTICS OF THE                                 MICROORGANISMS AND COMPLY WITH THE REQUIREMENTS OF AS3706.12 AND AS3706.13.               16.1. THE FOLLOWING HOLD POINTS MUST BE OBSERVED IN ACCORDANCE WITH THE MOST
                     CAREFULLY PLANNED TO ENSURE THAT BOTH THE BIORETENTION SYSTEM AND THE                                  FILTER MEDIA REQUIRED FOR PLANT GROWTH SHOULD BE CONFIRMED WITH A SOIL ANALYSIS OR
                                                                                                                                                                                                                                                                                                                                            RECENT WATER BY DESIGN CONSTRUCTION CHECKLISTS AND SUPERINTENDENT APPROVAL
                     DOWNSTREAM WATERWAYS, ARE NOT IMPACTED BY STORMWATER AND SEDIMENT (E.G.                                CONFIRMED WITH A HORTICULTURIST/LANDSCAPE ARCHITECT.
                                                                                                                                                                                                                                                                                                                                            IS REQUIRED FOR WORKS TO PROCEED:
                     THROUGH BEST PRACTICE EROSION AND SEDIMENT CONTROL). IN PARTICULAR, THE                                                                                                                                          13.    IMPERMEABLE LINER (WHERE SPECIFIED)
                                                                                                                                                                                                                                                                                                                                            16.0.1. PRESTART MEETING
                     DRAINAGE LAYER, TRANSITION LAYER AND FILTER MEDIA MUST NOT BE PLACED UNTIL THE                         8.2.   TESTING FREQUENCY                                                                                  13.1. MATERIALS LINER OPTIONS INCLUDE CLAY, GEOSYNTHETIC BENTONITE CLAY LINERS OR
                     RISK OF HIGH SEDIMENT LOADING FROM UPSTREAM CONSTRUCTION ACTIVITIES HAS BEEN                                                                                                                                                                                                                                           16.0.2. COMPLETION OF HYDRAULIC STRUCTURES AND UNDER-DRAINAGE
                                                                                                                            SUITABLE FILTER MEDIA CAN BE DELIVERED TO SITE OR IMPORTED SAND CAN BE AMELIORATED                              HIGH-DENSITY POLY ETHYLENE (HDPE) LINERS. REFER TO THE PROJECT DRAWINGS FOR
                     MITIGATED. THE CONSTRUCTION SEQUENCE MUST BE APPROVED BY THE SUPERINTENDENT.                                                                                                                                           LINER DETAILS.                                                                                  16.0.3. PRIOR TO PLACING FILTER MEDIA
                                                                                                                            TO MEET THE ABOVE SPECIFICATION. IN EITHER CASE, THE MEDIA SHALL BE TESTED AGAINST THE
                     IF WITHIN MORETON BAY REGIONAL COUNCIL, THE BIORETENTION STRUCTURE SHOULD BE                                                                                                                                                                                                                                           16.1.4. AFTER PLACEMENT OF FILTER MEDIA (PRIOR TO APPLYING MULCH AND PLANTING).
                                                                                                                            ABOVE PARAMETERS AT ONE SAMPLE PER 500 m3 OF FILTER MEDIA. FOR SOIL SUPPLIED TO SITE,                     13.2. INSTALLATION INSTALLATION MUST BE IN ACCORDANCE WITH MANUFACTURERS
                     TURFED DURING THE ON MAINTENANCE PERIOD AND LANDSCAPED AT THE OFF
                                                                                                                            TESTING MUST BE UNDERTAKEN ON THE ACTUAL MATERIAL TO BE DELIVERED TO THE                                        SPECIFICATIONS AND DESIGN DRAWINGS AND ACHIEVE THE FOLLOWING:
                     MAINTENANCE STAGE.
                                                                                                                            BIORETENTION SYSTEM. THE SUPPLIER AND CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING                                13.2.1. THE LINERS SHALL BE KEYED INTO THE BATTERS AND TO THE EMBANKMENTS.
           5.2.      EROSION AND SEDIMENT CONTROL DURING CONSTRUCTION MUST BE DELIVERED IN                                  THE FILTER MEDIA MEETS THE SPECIFICATION AND THE CORRECT MATERIAL IS DELIVERED TO
                                                                                                                                                                                                                                                                                                                                      17.   COMPLIANCE TESTING (FOR ON OR OFF MAINTENANCE)
                     ACCORDANCE WITH ALL LEGISLATIVE REQUIREMENTS INCLUDING, WHERE REQUIRED, THE                                                                                                                                             13.2.2.LINERS MUST BE SEALED AROUND PROTRUSIONS SUCH AS OUTLET PIPES.                    17.1. COMPLIANCE TESTING MUST BE IN ACCORDANCE WITH CHAPTER 5 OF TRANSFERRING
                                                                                                                            SITE PRIOR TO INSTALLATION.
                     PREPARATION OF SITE-SPECIFIC ESC PLAN/S IN ACCORDANCE WITH CURRENT BEST                                                                                                                                                 13.2.3 MUST ACHIEVE A MAXIMUM PERMEABILITY OF 1X10-9M/S                                        OWNERSHIP OF VEGETATED STORMWATER ASSETS (WATER BY DESIGN). CHECKLISTS MUST
                     PRACTICE EROSION AND SEDIMENT CONTROL (E.G. IECA 2008, OR LATER VERSION).                                                                                                                                                                                                                                              BE COMPLETED AND SIGNED BY THE SUPERINTENDENT.
                                                                                                                            8.3.   INSTALLATION AND COMPACTION
                                                                                                                            WHEN INSTALLING, THE FOLLOWING SPECIFICATIONS SHALL BE APPLIED:                                           14.    LANDSCAPING
           6.          EARTHWORKS AND HYDRAULIC STRUCTURES                                                                                                                                                                            14.0. REFER TO LANDSCAPE DESIGN DRAWINGS.
                                                                                                                                                                                                                                                                                                                                      DISCLAIMER: IT IS THE RESPONSIBILITY OF THE CERTIFYING REGISTERED PROFESSIONAL
                                                                                                                            8.3.1. FILTER MEDIA SHALL BE INSTALLED AND COMPACTED IN TWO LIFTS FOR DEPTHS OF OVER                                                                                                                      ENGINEER TO ENSURE THESE STANDARD NOTES ARE ADAPTED TO THE SPECIFIC NEEDS OF THE
           6.1.      THE CONSTRUCTION OF HYDRAULIC STRUCTURES MUST ENSURE THE DESIGN LEVELS ARE                                    500 mm. COMPACTION SHALL BE LIGHT AND EVEN ACROSS THE SURFACE.                                     14.1. BATTER SLOPES MUST HAVE MIN 200 mm TOPSOIL WHICH MUST BE TESTED BY A
                     ACHIEVED. BUNDS/ EMBANKMENTS SURROUNDING THE SYSTEM SHALL BE AT CORRECT                                                                                                                                                                                                                                          PROJECT. IT IS EXPECTED THAT ADDITIONAL DRAWING NOTES WOULD BE REQUIRED TO COVER
                                                                                                                            8.3.2. THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION LAYER AND THE FILTER MEDIA                             NATA-ACCREDITED LABORATORY IN ACCORDANCE WITH AS 4419.                                    OTHER IMPORTANT PROJECT ISSUES (E.G. WORKPLACE HEALTH AND SAFETY, ENVIRONMENTAL
                     LEVELS. THE BELOW TABLE SUMMARISES THE CONSTRUCTION TOLERANCES FOR EACH
                     ELEMENT OF A TYPICAL BIORETENTION SYSTEM.                                                                     LAYER SHALL BE LEVEL AND FREE FROM LOCALISED DEPRESSIONS TO ENSURE EVEN                            14.2. SUBSOILS TO BE CULTIVATED TO 150 mm PRIOR TO PLACING TOPSOIL ON BATTER SLOPES.            PROTECTION, EROSION AND SEDIMENT CONTROL, ETC). HEALTHY WATERWAYS, IPWEA AND ALL
                                                                                                                                   DISTRIBUTION OF STORMWATER FLOWS ACROSS THE SURFACE AND PREVENT LOCALISED                          14.3. PLANTING DENSITIES AND SPECIES MUST BE CONSISTENT WITH THE LANDSCAPE DESIGN               CONTRIBUTORS TO THIS DOCUMENT ACCEPT NO LIABILITY FOR THE USE, MISUSE OR ANY
           6.2.      BIORETENTION SYSTEMS TOLERANCES (SEE CHART BELOW)                                                                                                                                                                                                                                                                OMISSION OR INACCURACY IN THIS DOCUMENT.
                                                                                                                                   PONDING.                                                                                                 DRAWINGS. NO SUBSTITUTIONS SHOULD BE MADE UNLESS APPROVED BY THE
                                                                                                                            8.3.3. FILTER FABRIC MUST NOT BE USED BETWEEN DRAINAGE LAYER, TRANSITION LAYER AND                              SUPERINTENDENT.
                                                                                                                                   THE FILTER MEDIA LAYERS OR WRAPPED AROUND THE UNDER-DRAINAGE                                                                                                                                                                                               Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                   IT IS THE RESPONSIBILITY OF THE            Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                               CONTRACTOR TO CONTACT THE RELEVANT             Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                              AUTHORITIES TO CONFIRM THE LOCATION OF          Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                 ALL EXISTING SERVICES PRIOR TO THE           the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                   COMMENCEMENT OF EXCAVATION                 services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                                                              contractor prior to commencement of works.
                                                                                                                                                           Approved
Checked -         CT
                                                                                                                                    Consulting Civil &                                                              Drawing title -                                              Project -   COMMUNITY AFFORDABLE                 Site -                                                     Project No.     233467 Sheet No.                    C362
Design -        SK            Drawn -   SK                                                                                          Structural Engineers                                                           BIORETENTION BASIN NOTES                                                  HOUSING DEVELOPMENT                  62 LAKE MACDONALD DRIVE,                                   Digital Ref :
                                                                                                                                                                                                                                                                                                                                                                                                             C362 BIORETENTION BASIN
                                                                                                                                                                                                                                                                                                                                                                                                             NOTES                     Issue :      A
Scales -     AS SHOWN                                                                                                               Project Management     124 DUPORTH AVENUE             Ph (07) 5443 7777                                                                      Client -
                                                                                                                                                                                                                                                                                             NOOSA COUNCIL                        COOROY                                                      This Document is copyright and shall not be copied
                                                                                                              ASSOCIATES PTY LTD                           PO BOX 16                      Fax (07) 5443 7577                                                                                                                                                                                  without written approval, nor shall it be used except
  Document Stage -                APPROVAL
                                                   A   10/01/24   ISSUE FOR CLIENT REVIEW                SK
                                                                                                                                    & Planning             MAROOCHYDORE QLD 4558
                                                                                                                                                                                                                                                                                                                                                                                                  for the Development and the Site Specified.
                                                  Issue Date                    Description          By                                                    E-MAIL: [email protected]
       c:\12dS\data\12DSERVER\233467_2957\DWG Covey\OPW\Uncontrolled\C362 BIORETENTION BASIN NOTES.dwg                                                                                                                                                                                                                                                                                      Plot 7 June 2024 - 11:06 AM

Used in these records

About this file

File size
9.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E Civil Engineering Plans.pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.