Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-05-08 Services & Organisation Committee Agenda

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                      RECENT ACHIEVEMENTS                        CURRENT PRIORITIES                           THE NEXT QUARTER
Infrastructure, Planning Design &         Reviewed the New Noosa Plan              Reviewing    corporate   signage           Ongoing implementation through
Delivery - Ensure Noosa's Design            including the planning scheme              guidelines and design criteria to            staff inductions, consultant briefings,
Principles and the Noosa Style are          policy, standard drawings and              create alignment with design                 design checklists.
considered in the planning of future        character    centres    to   create        principles.
projects                                    alignment with Noosa design
                                            principles.
Business as Usual activities              Awarded contract for Park Road           Commencing construction for Park           Tender Hilton Terrace corridor
                                            Boardwalk, Main Beach Boardwalk            Road Boardwalk and for Main                  upgrade Stage 1 works.
                                            and Noosaville Library upgrades.           Beach Boardwalk upgrades.                  Tender for Orealla Crescent Bridge.
                                          Completed public consultation for        Detailed design of Noosa Parade            Tender for Cooran Pioneer Park
                                            Noosa Parade corridor upgrade,             corridor, Donnelly’s Road and Black          upgrade.
                                            Pioneer     Park,    Cooran     and        Mountain Road upgrades.                    Delivery   of    Donnelly’s    Road
                                            Castaways Beach carpark.                 Design      of    Peregian     Beach         upgrade.
                                          Completed designs for Poinciana            Amenities and Castaways Beach              Finalise design for Black Mountain
                                            Avenue upgrade and Sunrise Road            carpark.                                     Road upgrades.
                                            Cycle lanes.                             Assessing tenders for Mary River           Design of Bicentennial car park,
                                          Construction complete for Cooroy           Road and Old Noosa Road Bridges.             Gympie Terrace Stage 2 and Pacific
                                            Noosa Road and Weyba Road                Redevelopment of North Shore                 Avenue upgrades.
                                            corridor and Kinmond Creek Road            camp ground.
                                            culverts upgrades.                       Noosa River Holiday Park Amenities
                                                                                       replacements and upgrades.
                                                                                     Grant for Botanic Gardens Shade
                                                                                       structure.
                                                                                     Delivery of DDA Bus stop upgrade
                                                                                       program.
                                                                                     Design support for Tewantin Bypass
                                                                                       - Beckmans Road and Cooroy
                                                                                       Connection Roads projects.
                                                                                     Design support for Transport
                                                                                       Strategy.
                                                                                     Delivery of Station Street, Poinciana
                                                                                       Avenue and Moorindil Street
                                                                                       roundabout upgrades.




                                                                                                                                                        Page 106 of 107
Log in to download the original file

2018-05-08 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.