Pedestrian and Bicycle Facilities
32. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 2 metre wide concrete footpath within the road verge for the entire length of the site’s
frontage to Hilton Terrace;
b. Floor finish for pedestrian pathways, to provide contrast in colour and texture to
driveway, generally in accordance with plan A1001, “Overall Plan – Ground Floor”,
prepared by Blight Rayner.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and generally in accordance with:
a. “Stormwater Management Report”, ref: S24-163, prepared by Westera Partners, dated
7 November 2024.
Services
34. Reticulated electricity and telecommunication services must be provided to each unit in
accordance with the standards and requirements of the relevant service provider.
35. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
36. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
37. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
38. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
39. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
40. All fill and associated batters must be undertaken in accordance with an Operational Works
approval and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
41. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Acid Sulphate Soils
42. Prior to the issuing an Operational Works approval, provide an Acid Sulphate Soil
Management Plan for the site (with recommendations), prepared by a qualified person*, in
case acid sulphate soils are encountered during construction.
* For the purpose of preparing an Acid Sulphate Soils, a qualified person is considered to be
either:
Page 14 of 17
Document Set ID: 23397734
Version: 12, Version Date: 14/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24 0112 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.