Delegated Report - Code - Planning MCU24 0112 [As Published] · MCU24/0112
53. Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
protected from damage and made safe to the standard required by the regulatory authority.
54. Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
pre-existing conditions.
Plumbing and Drainage
55. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
S24-163 A Stormwater Management Plan prepared by 07/11/2024
Westera Partners
S24-163-PO1 - Site Plan prepared by Westera Partners October 2024
Sheet 01 of 03
S24-163-PO2 - Preliminary Stormwater Management Plan October 2024
prepared by Westera Partners
Sheet 02 of 03
S24-163-PO3 - Preliminary Stormwater Concept Plan and Section October 2024
prepared by Westera Partners
Sheet 03 of 03
S24-163-PE1 - Earthworks Site Plan prepared by Westera October 2024
Partners
Sheet 01 of 02
S24-163-PE1 - Preliminary Earthworks Plan prepared by Westera October 2024
Partners
Sheet 02 of 02
P0056312 SK02 C B50 Small Car Swept Path prepared by Urbis 24/01/2025
P0056312 SK02 B Visitor Parking Bay prepared by Urbis 24/01/2025
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Page 16 of 17
Document Set ID: 23397734
Version: 12, Version Date: 14/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24 0112 [As Published]Related documentApplication case desk ↗