Attachment D - Stormwater and Water Quality report

of 37

Page text read automatically using OCR, there may be inaccuracies

            LOWER MILL SITE
          CARPARK EXTENSIONS

STORMWATER TREATMENT AND WATER QUALITY
          MANAGEMENT PLAN


                 FOR

             NOOSA COUNCIL

             FEBRUARY 2020




                                   Callaghan & Toth
                                     Civil, Environmental &
                                     Hydraulic Engineers

Log in to download the original (Attachment D - Stormwater and Water Quality report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 36 pages

Page 2

                                                                                                              Callaghan & Toth

                                                   DOCUMENT HISTORY

Document Reference:                                  No: 2001_SWQMP_LowerMillSite.doc

Project Manager:                                     Mitch Turner

Author:                                              Jane Davissen BE (ENV)

Reviewer:                                            Lex Toth NPER3 (ENV) (CIVIL) RPEQ 6069 CPESC

Client:                                              Noosa Council

Contact Person:                                      Mitch Turner


DISTRIBUTION LIST

                                                         POSITION ON
              NAME            ORGANIZATION             MANAGEMENT TEAM               REVISION    REVISION        REVISION
                                                                                         0          1               2
            Mitch Turner         Noosa Council              Project Manager               1

                                                          Environmental / Civil
              Lex Toth          Callaghan & Toth                                          1
                                                               Engineers

            Mark Lewis           Noosa Council            Assessment Officer              1




REVISION LIST

          REVISION                    DATE DISTRIBUTED                            ISSUED BY                   CHECKED BY

               0                      6th February 2020                              LT                                JD


             The information contained in this report is confidential and proprietary to Callaghan and Toth. It may
             only be used by the person to whom it is provided, for the stated purpose for which it is provided, and
              must not be imparted to any third person without the prior written approval of Callaghan and Toth.
               Callaghan and Toth reserve all legal rights and remedies in relation to infringement of its rights in
                                              respect of its confidential information.
                                                   ©Callaghan & Toth
                                                         2020




                                                                                                                            2
2001 Lower Mill Carpark Extension SWMP                                                                     February 2020

Page 3

                                                                                                                  Callaghan & Toth

CONTENTS
1.0 SUMMARY ......................................................................................................................... 5
2.0 INTRODUCTION ............................................................................................................... 5
3.0 DESCRIPTION.................................................................................................................... 7
   3.1 Contaminated Land: ......................................................................................................... 7
   3.2 Proposed Works ............................................................................................................... 8
4.0 WATER QUALITY MANAGEMENT PLAN ................................................................. 10
   4.1 Background Lower Mill Site Stormwater Management ................................................ 10
   4.2 Proposed On-Site Stormwater Treatment Process ......................................................... 10
   4.3 MUSIC Model ................................................................................................................ 11
      4.3.1 Source Nodes .......................................................................................................... 11
      4.3.2 Treatment Nodes ..................................................................................................... 12
      4.3.3 Rainfall Data ........................................................................................................... 13
   4.4 MUSIC Modelling Results ............................................................................................. 15
      4.4.1 Water Quality Objectives ........................................................................................ 15
      4.4.2 Assessment of Results............................................................................................. 16
5.0 FLOODING ASSESSMENT SUMMARY ....................................................................... 17
   5.1 Existing Conditions ........................................................................................................ 17
   5.2 Proposed Drainage System............................................................................................. 17
6.0 PROPOSED REMEDIATION OF STORMWATER DEVICES ..................................... 18
   6.1 Biobasins ........................................................................................................................ 18
7     CONCLUSIONS & RECOMMENDATIONS ..................................................................... 19
APPENDIX A       - MUSIC Results ............................................................................................ A
APPENDIX B       - Site Management Plan – Contaminated Land .............................................. B
APPENDIX C       - IPWEAQ Standard Drawings....................................................................... C




                                                                                                                                          3
2001 Lower Mill Carpark Extension SWMP                                                                        February 2020

Page 4

                                                                                      Callaghan & Toth

LIST OF REFERENCES

1.       EN HEALTH (2004) Guidance on the Use of Rainwater Tanks.
2.       Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
         Guidelines.
3.       Healthy Waterways (2006) Water Sensitive Urban Design Technical Design Guidelines
         for South East Queensland
4.       Queensland Development Code Part 4.3 (Oct 2008) Alternative Water Sources.
5.       Water by Design, MUSIC Modelling Guidelines for South East Queensland – Version 1
         (December 2010)
6.       Water by Design, Deemed to Comply Solutions – Stormwater Quality Management
         (South East Queensland), May 2010
7.       Wong, T., Breen, P. & Lloyd, S. (2000) Water Sensitive Road Design – Design Options
         for Improving Stormwater Quality of Road Runoff. CRC for Catchment Hydrology
         Technical Report No 00/1.
8.       Hydrology & Water Management Consulting(Oct 2019), Cooroy Hinterland Park Flood
         Assessment (Ref:J00318R1V1)


LIST OF FIGURES

Figure 1.1                  Site Location Plan……………………………………………………… 6
Plan No. 2001-01            Proposed Development Catchment Plan………...............................9
Figure 4.1                  MUSIC Model for the Proposed Development……………………… 14



LIST OF TABLES

Table 4.1                   MUSIC Catchment Areas……………………………………………….13
Table 4.2                   Comparison of Load Reductions……………………………………….17




                                                                                                     4
2001 Lower Mill Carpark Extension SWMP                                             February 2020

Page 5

                                                                                   Callaghan & Toth


1.0 SUMMARY
The key points of this investigation are as follows:

    1. Runoff from new access roads, car parks and landscaped areas around the existing
       Lower Mill site buildings is to be cleaned of nutrients and gross pollutants via the
       existing refurbished biobasins and existing and new grass swales. Treated runoff is then
       released to existing outlets into the adjacent Cooroy Creek.
    2. Pollutant loads from the development are to be attenuated.
    3. The flood study detailed that filling for the new carpark areas will not affect flood levels in
       the Cooroy Flood Study.
    4. The previous MUSIC model for the Lower Mill development, did incorporate a similar
       sized carpark on Lot 5, compared to the proposed new carpark on Lot 7.


2.0 INTRODUCTION
This Stormwater Quality Management Plan (SQMP) has been prepared as part of a Material
Change of Use application to Noosa Council. This SQMP is in accordance with:
   1. Water Sensitive Design Code in the Noosa Plan, and
   2. The latest Water Sensitive Urban Design Technical Design Guidelines for South East
       Queensland, published by Health Waterways.

The proposed carparking and new access road works are located on Lot 5 SP213104 and Lot 7
SP173771 and the site is shown in Site Location Plan, Fig 1.1. The site is located at 4-8 Lower
Mill Road, Cooroy and the Cooroy Creek Bushland Reserve (Environmental Reserve 16 Lower
Mill Road, Cooroy).

This SQMP considers the new hardstand areas, including new access road, carparks, and
footpaths, for the existing community uses at the Lower Mill site. The proposed new carparks
will also service the existing Library and the proposed new Hinterland Playground.

There is a total of 52 new carparks proposed in two locations at the Lower Mill site:
    22 carparks adjacent the existing buildings on Lot 5 require formalisation with some
       extension to existing asphalt or concrete; and
    30 new carparks on Lot 7.

In order to receive planning approval from Noosa Council, this site must demonstrate that it
complies with Council’s Water Sensitive Design Code and that the storm water runoff will not
change the surrounding hydrology. There is an existing biobasin located on Lot 7 SP173771
which can accept the flows from the new hardstand areas for treatment. Two existing grass
swales will also treat runoff and two new grass swales will treat and convey flows to the existing
biobasin. These devices will enable the water quality objectives to be achieved.

The Model for Urban Stormwater Improvement Conceptualization (MUSIC) has been used to
assess the suitability of various treatment devices and to model existing and predicted pollution
export loads and concentrations.




                                                                                                    5
2001 Lower Mill Carpark Extension SWMP                                          February 2020

Page 6

Callaghan & Toth
    Civil, Environmental &
    Hydraulic Engineers


[OCR of page images]
 

©
gua

 

 

 

  

«
%
3,
% See
2 re Ss Kauri st
© 2
s 8
> = s
a A 3
§ : 3 = a
2 2 -
% -) . ; :
5 & g &
i By
vO
Je
= ie lohnson Ct
ed ~
5 z o
s £ 5
a g
s
2 ~
G
5
a
x >
oe
ow
=> >
x @
RS os®
River S \?
Mary Rd ie
a Ss
~ }
Mary Rix © §
Rd Ma or e 3 o
M) a 2, & 2
f, 'y River R oe RX 2 KS
S$ i x S
a 2 &
zg Pearl St Pearl St_§ Ss
‘5 Q <y
2 ® &S SS
| aoe Rog
Wi
8! © a x \a Pearl La ow”
a é 3 s
So 2 i ~
Village Shopping Centre
erald La {
Coon uJ” { f
Y Wanderer = Diamond St
* m
Vanderer Emerald’ sp Ly 3
a 8
Cooroy W. 2 Diamond La & =
Gam anderer 5 Cc a 5
et St & ooroy £ 5 .
5 Cooroy 5
Samet St = A Opal St Opal St g
400m
Garnet St
i 4563

 

 

Map data © OpenStreetMap contributors

 

SITE LOCATION PLAN

project
Callaghan & Toth | LOWER MILL SITE,
CARPARK EXTENSIONS

Civil, Environmental &
Hydraulic Engineers location

1.16/90 Goodchap St 4—8 AND 16 LOWER

MILL ROAD, COOROY ;

Figure 1.1

P.O. Box 2305

\ NOOSAville 4566
| Ph: 54749081
Scale:NTS

oS]
www.callaghanandtoth.com.au
Source: http://whereis.com.au/

 

 

 

 

 

Page 7

                                                                                Callaghan & Toth


3.0 DESCRIPTION
The site currently consists of two lots, with Lot 5 SP213104 containing the Cooroora
Woodworkers Club building, the Lower Mill site building and the Cooroy Camphor Laurel Club
building. There are hardstand areas associated with these buildings including pathways, formal
and informal carparking areas, access driveways and garden areas.

Lot 7 SP173771 is the Cooroy Creek bushland Reserve and is mostly vegetated with riparian
vegetation along Cooroy Creek. Lot 7 also contains a gravel access driveway and turnaround
area which is an informal carparking area during events. The existing biobasin is located within
Lot 7 and is contained within a drainage easement. This biobasin was constructed when the
Lot Reconfiguration of the Lower Mill site occurred. It is in need of refurbishment as its design
is no longer to current best practice design standards.

The sites are bounded by Cooroy Creek to the south, east and north-east and Lower Mill Road
to the west and Lot 4 SP173771 to the north – an industrial site.


3.1      Contaminated Land:

During previous development of the site, contaminated land issues have been addressed by
Council and managed in accordance with Site Management Plans (SMP).

It is our understanding that the current approved Site Management Plan dated 28 April 2008
(EPA File: 902326) for Lot 5 SP173771, Lot 7 SP173771, Lot 2 RP47020 and Lot 1 RP87371
(See Appendix B) is still current for management of the site.

These lots were part of the Boral Cooroy timber mill which operated from 1959 to 2001.
Previous contaminated land investigation identified a number of areas of contamination which
were treated and/or capped. Residual soil impact in locations F2 and F3 exceeded QLD EPA
EILS for arsenic, copper and chromium (III). Soil remediation works undertaken on Lot 7 in the
year 2000 included capping the area with 500mm clay layer. This clay capping layer had a
confirmed density ratio of 95.5%. This capping layer was covered by 100m of clean soil. One
of the capped areas on Lot 7 is under part of the proposed new carpark.

The SMP states:

The existing capping is to remain in place, undisturbed, other than for the construction of
service trenches. In the event that the existing capping layers are disturbed or removed, a new
capping layer, or equal of better standard and designed to achieve the objectives of this SMP, is
to be installed.

Depending on the detailed design levels of the new carpark there is potential requirements for
excavation works to construct this carpark. The new swales may also require excavation which
needs to be managed in relation to the capped contaminated material areas on Lot 7. As such
the SMP states:

Any soil excavated on the site must be assessed for contaminants of concern to determine if
material is contaminated and to identify appropriate management and disposal/re-use options.




                                                                                                7
2001 Lower Mill Carpark Extension SWMP                                       February 2020

Page 8

                                                                               Callaghan & Toth

3.2      Proposed Works

The overall proposal is to improve the public carparking on the site and to provide for future
parking for other adjacent community uses to the south of Cooroy Creek i.e. the library and the
proposed new Cooroy Hinterland Playground. The works involve:
        Constructing 30 new carparks and access road in an area of informal carparking
            (gravel and grassed area) during events in the area (on Lot 7),
        Formalising existing sealed/gravelled areas into 22 new carparks (on Lot 5),
        Retaining and shaping of existing turfed swale drain (on Lot 5),
        Construction of two new grass swales to divert new carpark flows to the existing
            biobasin (on Lot 7),
        Sealing existing gravel driveway areas to a concrete driveway standard,
        New sections of concrete pathway adjacent to the new carparks and connecting to
            existing pathways;
        Associated landscaping.

As a result of these works, new stormwater drainage and surface drainage treatment devices
are required. These new drainage systems are required to conform to Council’s Water Sensitive
Design Code and meet the Stormwater Management Design Objectives for stormwater quality
of the State Planning Policy. The existing biobasins will be refurbished and two new grass
swales will be constructed.

Refer to Plan 2001-01 which shows the stormwater quality management layout proposed for the
site.




                                                                                                  8
2001 Lower Mill Carpark Extension SWMP                                      February 2020

Page 9

Callaghan & Toth
   Civil, Environmental &
   Hydraulic Engineers


[OCR of page images]
 

 

 

703

Xe
\
|
|
|
|
|
|
|
|

RPII9674

» / f

 

LEGEND
EDGE OF BITUMEN
—— -—— __ KERB & CHANNEL
——————= PIPE CULVERT
—--2-->— GRASS SWALE WITH SUBSOIL DRAINS

BIORETENTION ZONE

POSSIBLE TANK SITE

ORIGINAL CATCHMENT BOUNDARIES

ALTERED CATCHMENT BOUNDARIES

fu —
f CMT 1C (0.39ha)

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
      
  
  

he
¥

a

 

EGEND:

 

  
 
 

 

 

 

 

 

 

     

 

SWALE 4
GRASSED AREA (0.24ha) CMT BDY

SWALE 1

RP47020

REVEGETATED WOODED AREA
ALONG CREEK BANK

REVEGETATED STEEP PARTIALLY CLEARED BANKS

REVEGETATED FLOOD PLAIN

REVEGETATED CLAY CAPPED CONTAMINATED LAND
LISTED ON THE ENVIRONMENTAL MANAGEMENT
REGISTER

CLAY CAPPED CONTAMINATED LAND LISTED ON

4 THE ENVIRONMENTAL MANAGEMENT REGISTER

OUTSIDE REVEGATION AREA. SOIL IS NOT TO
BE REMOVED FROM THE DEFINED SITE
WITHOUT APPROVAL

( Callaghan & Toth )

Civil, Environmental &
Hydraulic Engineers

2/11 Sunshine Beach Road
{ NOOSA JUNCTION 4566
Ph: 54749081 Fax: 54749041

=I ‘www.callaghanandtoth.com.au

 

 

 

 

 

designed [ADT | datum AHD

drawn BM PSM #
checked | AH Origin (B.M.) RL *
approved

SURVEYED BY

 

 

MAX WATTERSON & ASSOCIATES
PHONE 54426121

_——————
project

COOROY LOWER MILL SITE
CARPARKING AND ACCESS
EXTENSION

——$ rd

_——————————————————
Client

NOOSA COUNCIL

|

SS
title

SWQMP CATCHMENT & DRAINAGE}
LAYOUT PLAN

$$$ um
$n
LOT 3 ON RP110206

LOT 1 ON RP88582

LOT 2 ON RP110206 &

LOT 2 ON RP87371

Parish of TEWANTIN

County of MARCH

NOOSA SHIRE COUNCIL

Locality of COOROY

a.
SCALE

 

0.5 10 15 20 25 Meters 50)
SSS

scale
1:1000(A3) SCALE SHOWN IS ORIGINAL DRAWING SCALE
. DO NOT SCALE FROM THIS DRAWING

 

 

USE ONLY DIMENSIONS PROVIDED

REVISIONS

revision details
|

 

FILES

 

COMPUTER DIRECTORY

 

c\JOBS\2001\...

 

 

FOR APPROVAL

 

Sheet * of * sheets

 

drawing number

 

 

2001-01

 

 

\ date 06/02/2020 yy

 

 

 

 

Page 10

                                                                                Callaghan & Toth


4.0 WATER QUALITY MANAGEMENT PLAN
4.1      Background Lower Mill Site Stormwater Management

The Lower Mill site was developed by Council in 2005 and resulted in the creation of industrial
lots and community use lots.

The lot reconfiguration involved a stormwater management plan and MUSIC model which
included the new industrial lots i.e. Lots 3, 4 & 6 SP173771, Lot 15 SP301607, new part
industrial/part community use Lot 5 SP213104, community use Lot 7 SP173771 and Lot 2
RP47020.

MUSIC version 2.01 was used to determine suitable treatment nodes for the development and
the model determined the following treatment system:
      1. GPTs in each gully pit.
      2. Grass Swales will treat stormwater runoff from roads, carparks and footpaths.
      3. Bio-Retention Systems – one adjacent the bridge on Mary River Road and one in an
          easement in Lot 7.
           The Isolated Bio-Retention Basin designed to have an extended detention depth
              of 0.4m and consist of a 0.8m deep sandy loam layer underlaid with a 0.2m deep
              coarse sand layer.
           The Bio-Retention Pods adjacent roads and carparks designed to have a
              maximum extended detention depth of 0.3m and consist of a 0.3m deep sandy
              loam layer underlaid with a 0.25m deep coarse sand layer.

In addition to this original development, Lot 5 SP213104 was developed in 2006 with the
addition of the Cooroy Camphor Laurel Club shed and associated carparking. A MUSIC model
was prepared for this proposed development and it was determined that the roofwater would be
treated by a rainwater tank which would flow to a bioretention basin (S.A. = 12m2) which would
also treat the carpark areas. It has been noted during site inspections that this rainwater tank
and bioretention basin have not been installed.

4.2      Proposed On-Site Stormwater Treatment Process

The site i.e. Lot 5 and Lot 7 showing the new works was divided into MUSIC model sub-
catchments as shown on Plan No. 2001-01. The previously developed site i.e. the lot
reconfiguration that developed the industrial lots, have also been included in the MUSIC model.
These catchments have been modelled as per the original MUSIC model and the proposed
treatment train for those catchments have not been altered, as it is considered that these works
were completed as per that design and approval conditions.

The new hardstand areas will be mostly diverted to existing treatment systems, particularly the
biobasin (Biobasin 1 – BB1) located on Lot 7 SP173771.

The proposed treatment train for the new hardstand areas for the site is also illustrated on Plan
No. 2001-01 and Fig 4.1 (MUSIC model layout) and listed below:

    1. Existing Grass Swales (Swale 1 and 4) – Swale 1 to treat overland flow from the carpark
       adjacent the buildings (on Lot 5) prior to flowing into one of the new grass swales which
       directs the flow to the biobasin. The existing swales will be reinstated during works and



                                                                                               10
2001 Lower Mill Carpark Extension SWMP                                       February 2020

Page 11

                                                                                   Callaghan & Toth

         is 50m long and 4.2m wide, with 1 in 4 batters. Swale 4 to treat flows from the grassed
         area in the north of Lot 5

    2. New Grass Swales (Swales 2 & 3) – two new grass swales will collect stormwater flows
       from the new access road and new carpark area and divert the flows to the existing
       biobasin. The new swales are 40m and 45m long and 2.6m wide, with 1 in 3 batters.

    3. Existing Biobasin – the existing biobasin in Lot 7 is 12m x 12m giving a total filter area of
       144m2. It is proposed to treat the runoff from the new 30 space carpark, the turnaround
       and new access road, new pathways and the extra concrete/asphalt required to
       formalise the carpark areas adjacent the existing buildings. As this biobasin was
       constructed in 2006, it is proposed to refurbish the biobasin by replacing the filter media,
       installing an outlet pit and lining the basin. The treated runoff will then be directed to the
       existing stormwater outlet which discharges to Cooroy Creek. The bio-retention
       component will remove the nutrients and retard flow.


4.3      MUSIC Model
4.3.1 Source Nodes

The existing source nodes within the existing development have been maintained as per the
original MUSIC model as industrial nodes for Lots 6 SP161035, Lot 15 SP301607 and Lot 3 & 4
SP173771 (Lot area = 1.5144 ha) with the road reserve of Lower Mill Road (area = 0.346 ha).
The source nodes have been updated to reflect any changes in the MUSIC modelling guideline.

Whilst the current proposed changes to Lot 5 and Lot 7 are defined using split catchment
technique and source nodes as per the 2010 guidelines.

This approach is considered acceptable as the existing industrial lots have already been
approved with the treatment system in place. The proposed changes to the car parking at the
Lower Mill sites do not change the existing industrial uses adjacent.

MUSIC allows for the characteristics of these source nodes to be amended to ensure that
accurate pollution generation and hydraulic characteristics are used to generate stormwater
runoff within the model. Table 4.1 below details the sub-catchments used in the MUSIC model,
land use, percent imperviousness and area of each sub-catchment. The MUSIC Modelling
Guidelines for South-East Queensland – Version 1 December 2010 have been used to set
levels of imperviousness. The site has been related to a “Industrial” land use and pollutant
export parameters detailed in the Guidelines for this land use have been used for each node.




                                                                                                  11
2001 Lower Mill Carpark Extension SWMP                                          February 2020

Page 12

                                                                                  Callaghan & Toth

TABLE 4.1          MUSIC CATCHMENT AREAS (DEVELOPED)

                      Catchment                         Land Use           Music           Area (ha)
                                                                         Impervious

                    Adjacent Industrial Catchment – former Lot Reconfiguration Model
Catchment 1a – Lots Future, 1, 2, 3 East & 4             Industrial           65%               0.68
Catchment 1b – Lots Future, 1, 2, 3 East & 4 Roof          Roof              100%               0.25
Areas
Catchment 1c – Road Reserve North                       Commercial            35%               0.28
Catchment 2a – Road Reserve South West                  Commercial            35%               0.08
Catchment 2b – Road Reserve South East                  Commercial            35%               0.10
Catchment 5a – Lot 3 West                                Industrial           65%               0.44
Catchment 5b – Lot 3 West Roof Area                        Roof              100%               0.05
TOTAL                                                                                           1.88
                           EXISTING & PROPOSED AREAS ON LOT 5 AND LOT 7

Catchment 6 – Camphor Shed and carpark                   Industrial          90%                0.06

Catchment 7 - Existing carpark + driveways –                                 100%              0.197
                                                         Industrial
formalising area

Catchment 8 – new pathway                                Industrial          90%               0.014

Catchment 9 – new access road                                                90%                0.06

Catchment 10 – new carpark area                                              90%                0.12

Existing grassed area used for informal carparking                           20%                0.24

TOTAL                                                                                          0.69ha


4.3.2 Treatment Nodes

The “MUSIC Modelling Guidelines for South East Queensland” Version 1.0 prepared by Water
by Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.

The land use type used for this model was “Industrial” and the values in the guideline shown in
Table 3.7 and Table 3.8 of the guidelines have been used in this model. Figure 4.1 shows the
MUSIC Model layout for the site. Refer to IPWEAQ standard drawings WSUD 001 & WSUD
003 ( See Appendix C)
Bioretention Basins the existing biobasin in Lot 7 constructed in 2005 will continue to treat flows
from the existing carpark and hardstand areas and from the new proposed carpark, landscaped
areas, and pathways. The existing Biobasin in Lot 7 is 12m x 12m with a total filter area of
144m2. The existing biobasin adjacent Mary River Road is 3m x 8.65m with a total filter area of
26m2. This treatment node has been updated to Version 6.2.1 MUSIC model node and has
been amended to reflect the proposed design changes to the biobasin detailed in Section 6.0.




                                                                                                       12
2001 Lower Mill Carpark Extension SWMP                                         February 2020

Page 13

                                                                               Callaghan & Toth

Biobasin 1 will be:
           a. Located in Lot 7 SP173177 in the same footprint of the existing biobasin
                adjacent to Cooroy Creek.
           b. Designed with a filter area of 144m2.
           c. Filter layer depth of 0.5m, transition layer of 0.1m and drainage layer of 0.2m and
                an extended detention depth of 0.3m.
           d. The size and depth of the systems have been designed in accordance with
                Water by Design Guidelines and IPWEAQ standard drawings in Appendix C.

Biobasin 2 will be:
           a. Located in Mary River Road road reserve in the same footprint of the existing
                biobasin adjacent to Cooroy Creek.
           b. Designed with a filter area of 26m2 (3m wide x 8.65m long)
           c. Filter layer depth of 0.4m, transition layer of 0.1m and drainage layer of 0.2m and
                an extended detention depth of 0.3m.
           d. The size and depth of the systems have been designed in accordance with
                Water by Design Guidelines and IPWEAQ standard drawings in Appendix C.

Grass Swales will form part of the treatment train, with one existing grass swale accepting flows
form carpark areas adjacent the buildings and the new carpark flowing to two new swales and
flowing to the biobasin BB1.

Swale 1
       Existing swale located in Lot 5 formalised,
       Length of 50m, top width of 4.2m, base width of 0.2m with 1 in 4 batters,
        approximate grade of 1.0%.
       The size and depth of the systems have been designed in accordance with Water by
        Design Guidelines.

Swales 2 and 3
       Located in Lot 7 two new swales adjacent the new carpark,
       Length of 40m and 45m respectively, and top width of 2.6m, base width of 0.2m with
          1 in 3 batters, approximate grade of 1.0%.
       The size and depth of the systems have been designed in accordance with Water by
          Design Guidelines.

Swale 4
       Existing swale located in drainage easement between Lot 4 and Lot 5.
       Length of 40m, top width of 4.2m, base width of 0.2m with 1 in 4 batters,
        approximate grade of 1.0%.
       The size and depth of the systems have been designed in accordance with Water by
        Design Guidelines.

4.3.3 Rainfall Data

The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/73 –
31/12/83.

The mean Annual Rainfall for Cooroy                 1973 – 1983 = 1600mm

The MUSIC Modelling Guidelines for South East Queensland – Version 1 December 2010
details that Cooroy data for 1973 to 1983 should be used.



                                                                                              13
2001 Lower Mill Carpark Extension SWMP                                      February 2020

Page 14

Callaghan & Toth
    Civil, Environmental &
    Hydraulic Engineers


[OCR of page images]
 

 

‘OOROY CREEK

Bio-Retention Swale

G

Rainwater Tan

GB

Rainwater Tank x2
Gross Pollutant Trap

BlOpod CMT6

BIOBASIN 2
rban - Roof CMT 6

[- |: 1.

ment 6 - Carpark for Camphor [!
Catchment 5b - Roof Ar

Catchment 5a - Private Lot 3 West

ross Pollutant T!

(Gross Pollutant Ti

Gross Pollutant Trap

er Tank x 1

Catchment 2b - Road Reserve South East

‘Catchment 2a - Road Reserve South West

Catchment ic - Road Reserve North

ment 1b - Roof Are
Catchment 1a - Private Lots 1, 2,3 East & 4

Buffer - adjacent

SS

ment 8 -new

ment 9 - new access road/pathway [Sealedroad]

Catchment 7 - formalise carpark [Sealedr:

Catchment 10 - new carpark, pathway, s [Sealedr

Grass Area north of carparks [Mixed]

 

 

 

 

0c 4
eo +
=>
IQ. o
O 3
OW SD
25 ar
one) fy
Na ”
=> v
oO 5
Oo. wn
O
~~
an
Y
Z ne
So =z
LIM OS
HA +10
Ne 1 O
7S << -
= Z
S OQ
=x ZO
“<x ce
Lo a
0 _
gS 2412
e470 B8v2
& a
=n 3
Ss £5 28_§
S Be B8tes
of 2H 8c60.5
ZY Casas
—=—4 Oo 2
Bugs 3
osg 5 z
Oo 4
o US
—
—
oO
UO

 

 

 

Page 15

                                                                                Callaghan & Toth



4.4      MUSIC Modelling Results

The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 6.2.1 is the current version and capable
of incorporating rainwater re-use in the model. These features have been used in making
comparisons between different stormwater management systems for this report.


4.4.1 Water Quality Objectives

This model meets the pollution load reduction target as detailed in the State Planning Policy
2017 (Appendix 2: Table B). The following have been included in Appendix A.

                The treatment train effectiveness for the system.
                The MUSIC Version 6.2.1 Summary Report.

The information above indicates that the new carpark, carpark roof, footpaths, and associated
landscaping with the proposed stormwater treatment train will achieve reductions in pollutant
loads as detailed in Table 4.2 below.

         TABLE 4.2:         COMPARISON OF LOAD REDUCTIONS

             Parameter                       MUSIC            POLLUTANT LOAD
                                           REDUCTION             REDUCTION
                                            RESULT                TARGETS
                                                              (Source: SPP 2017)
             Flow                              1.4%
             Total Suspended Solids            84%                   80%
             Total Phosphorous                 60%                   60%
             Total Nitrogen                    45%                   45%
             Gross Pollutants >5mm             99%                   90%




                                                                                                15
2001 Lower Mill Carpark Extension SWMP                                       February 2020

Page 16

                                                                               Callaghan & Toth


4.4.2 Assessment of Results

The developed site has been modelled as a series of Industrial sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Plan No 2001-01 shows
the existing treatment systems Biobasin 1 and 2, with the two existing grass swales and two
new swales locations.

This treatment train (once the existing Biobasin systems are refurbished) is able to achieve
reductions as per the pollutant load reduction targets (See Table 4.2) which complies with
Council’s requirements.




                                                                                               16
2001 Lower Mill Carpark Extension SWMP                                      February 2020

Page 17

                                                                                Callaghan & Toth


5.0 FLOODING ASSESSMENT SUMMARY
The flood study for the site was undertaken by Hydrology & Water Management Consulting.
The results of the flood study and assessment are summarised below.

5.1      Existing Conditions

The site is bounded to the south and east by Cooroy Creek.

The site is subject to ponding of floodwaters from the adjacent watercourses and the Q100 year
ARI flood levels (i.e. 1% AEP event) (see Appendix A in Flood Study). The Lower Mill site is
affected by flood levels across a range of events. The proposed carparks and access roads
and pathways are below the Q100 year inundation line.

The flood assessment from Hydrology and Water (See Appendix 4) reports on the hydrologic
and hydraulic performance of the site including upstream and downstream catchments.

5.2      Proposed Drainage System

The flood study determined that the proposed level changes for the carpark (HWMC used
Council’s design levels) together with the proposed changes to the south of Cooroy Creek for
the new hinterland playground, that the flood depths over the modelled events were comparable
to the existing case; provided structures nominated in the flood study are removed from the
playground design. As stated in the report:

         Modelling has demonstrated that care is required to ensure that the design of the park
         will not increase flood risk on surrounding properties. Iterative modelling of various
         mitigation scenarios has been used to develop several mitigation measures that have
         successful reduced offsite flood impacts to an acceptable level.

Following discussions with Council staff, it is understood that mitigation scenarios include
lowering some levels of proposed mounds and to removing proposed viewing platforms into the
creek, to ensure that the flood levels of the proposed case were equivalent to the existing case.

As such the playground design is being amended to ensure that flood levels and velocities are
consistent with the modelling scenarios proposed by HWMC.

It should also be noted that management requirements for the contaminated land area on Lot 7
need to be considered when undertaking detailed design of the carpark levels in association
with flood modelling. Carpark levels may need to be amended i.e. raised to ensure that capping
is not damaged. However, this may affect the flood model, resulting in carpark levels needing
to encroach into the capping of contaminated material. The SMP in Appendix B details the
management requirements of this area.




                                                                                                  17
2001 Lower Mill Carpark Extension SWMP                                       February 2020

Page 18

                                                                               Callaghan & Toth


6.0 PROPOSED REMEDIATION OF STORMWATER DEVICES

6.1      Biobasins

The two existing biobasins will be accepting the existing stormwater flows from the area as well
as the new hardstand areas. These biobasins and are in need of refurbishment, having been in
use for approximately 14 years. It is also noted that design guidelines have changed since
these biobasins were installed, and they are currently not to best practice standards. It is
proposed to undertake the following maintenance:

Biobasin 1 – in Lot 7 (following completion of the new carpark landscaping):
    Remove debris and litter
    Remove weeds and vegetation around biobasins and on the surface
    Fix erosion of the inlet swale to Biobasin
    Check the pipe inlet
    Check the outlet weir and pipe, fix erosion and clean pipes as required
    Remove filter media
    Remove underdrainage pipes
    Remove drainage layer material
    Line Biobasin with welded poly-liner
    Install drainage layer with replacement pipes
    Install an outlet pit connected to the new underdrainage pipework
    Install transition layer
    Install filter media to design depth
    Landscape planting in filter media

Biobasin 2 – adjacent Mary River Road
    Remove debris and litter
    Remove weeds and vegetation around biobasins and on the surface
    Check the pipe inlet
    Check the outlet weir and pipe, fix erosion and clean pipes as required
    Remove filter media
    Remove underdrainage pipes
    Remove drainage layer material
    Line biobasin with welded poly-liner
    Install drainage layer with replacement pipes
    Install an outlet pit connected to the new underdrainage pipework
    Install transition layer
    Install filter media to design depth
    Landscape planting in filter media




                                                                                             18
2001 Lower Mill Carpark Extension SWMP                                      February 2020

Page 19

                                                                               Callaghan & Toth


7        CONCLUSIONS & RECOMMENDATIONS
The proposed development area i.e. extensions to the carpark areas on site, can be treated by
a treatment train consisting of the refurbished biobasins, grass swales and a grass buffer which
are capable of removing the gross pollutants, sediment, nutrients and heavy metals.

The new car parking on Lot 7 requires assessment in relation to managing the capped
contaminated material on site against the impacts to flood levels from the proposed filling on
site. Generally, the proposed carpark and access road can be designed to ensure the carpark
levels do not impact flood levels in Cooroy in accordance with Council’s requirements.




                                                                                              19
2001 Lower Mill Carpark Extension SWMP                                      February 2020

Page 20

                                                             Callaghan & Toth


APPENDIX A                               -   MUSIC Results




                                                                             A
2001 Lower Mill Carpark Extension SWMP                       February 2020

Page 21

Source nodes


                                                                                                                                                                                                            Catchment 10 -
                                                                                        Catchment 2a - Catchment 1c - Catchment 2b - Catchment 5a -                        Catchment 7 -    Catchment 6 -    new carpark_ Catchment 9 -                                  Grass Area
                                                                 Catchment 1a - Private Road Reserve Road Reserve Road Reserve Private Lot 3 Catchment 1b - Catchment 5b -   formalise       Carpark for       pathway_     new access    Catchment 8 -   Urban - Roof    north of
Location                                                          Lots 1_ 2_ 3 East & 4  South West        North       South East        West       Roof Areas Roof Areas     carpark         Camphor            grass     road/pathway   new pathway        CMT 6        carparks
ID                                                                        2                 4             5              7            12             13            14             19             21              23            24              25             28             30
                                                                 UserDefinedSourceNod UserDefinedSou UserDefinedSou UserDefinedSou UserDefinedSou UserDefinedSou UserDefinedSou UrbanSourceNo UrbanSourceNo UrbanSourceNo UrbanSourceNo UrbanSourceNo UrbanSourceNo UrbanSourceNo
Node Type                                                                  e             rceNode        rceNode        rceNode        rceNode        rceNode        rceNode          de            de            de            de            de            de            de
Zoning Surface Type                                                                                                                                                           Sealedroad     Sealedroad      Sealedroad     Sealedroad     Sealedroad        Roof           Mixed
Total Area (ha)                                                          0.68             0.08           0.28           0.1           0.89          0.25           0.05          0.197          0.023           0.12           0.06           0.014          0.038          0.24
Area Impervious (ha)                                                 0.442417544      0.027950877    0.09782807    0.034938596    0.579046491       0.25           0.05          0.197          0.023        0.108241791   0.053894776    0.012575448        0.038       0.047346269
Area Pervious (ha)                                                   0.237582456      0.052049123    0.18217193    0.065061404    0.310953509         0             0              0             0           0.011758209   0.006105224    0.001424552          0         0.192653731
Field Capacity (mm)                                                      80                80            80             80            80             80            80             80             80              80            80              80             80             80
Pervious Area Infiltration Capacity coefficient - a                      243               243           243            243           243            243           243            243           243              243           243            243             243            243
Pervious Area Infiltration Capacity exponent - b                         0.6               0.6           0.6            0.6           0.6            0.6           0.6            0.6            0.6             0.6           0.6             0.6            0.6            0.6
Impervious Area Rainfall Threshold (mm/day)                               1                 1             1              1             1              1             1              1             1                1             1              1               1              1
Pervious Area Soil Storage Capacity (mm)                                 18                18            18             18            18             18            18             18             18              18            18              18             18             18
Pervious Area Soil Initial Storage (% of Capacity)                       10                10            10             10            10             10            10             10             10              10            10              10             10             10
Groundwater Initial Depth (mm)                                           50                50            50             50            50             50            50             50             50              50            50              50             50             50
Groundwater Daily Recharge Rate (%)                                       0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Groundwater Daily Baseflow Rate (%)                                      31                31            31             31            31             31            31             31             31              31            31              31             31             31
Groundwater Daily Deep Seepage Rate (%)                                   0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Stormflow Total Suspended Solids Mean (log mg/L)                         1.92             1.92           2.43          1.92           1.92           1.3           1.3           2.43           2.43            2.43           2.43           2.43            1.3           1.92
Stormflow Total Suspended Solids Standard Deviation (log mg/L)           0.44             0.44           0.44          0.44           0.44          0.44           0.44          0.44           0.44            0.44           0.44           0.44            0.44          0.44
Stormflow Total Suspended Solids Estimation Method                    Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Stormflow Total Suspended Solids Serial Correlation                       0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Stormflow Total Phosphorus Mean (log mg/L)                              -0.59             -0.59         -0.59          -0.59         -0.59          -0.89         -0.89           -0.3          -0.3             -0.3          -0.3           -0.3           -0.89          -0.59
Stormflow Total Phosphorus Standard Deviation (log mg/L)                 0.36             0.36           0.36          0.36           0.36          0.36           0.36          0.36           0.36            0.36           0.36           0.36            0.36          0.36
Stormflow Total Phosphorus Estimation Method                          Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Stormflow Total Phosphorus Serial Correlation                             0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Stormflow Total Nitrogen Mean (log mg/L)                                 0.25             0.25           0.25          0.25           0.25          0.25           0.25          0.25           0.25            0.25           0.25           0.25            0.25          0.25
Stormflow Total Nitrogen Standard Deviation (log mg/L)                   0.32             0.32           0.32          0.32           0.32          0.32           0.32          0.32           0.32            0.32           0.32           0.32            0.32          0.32
Stormflow Total Nitrogen Estimation Method                            Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Stormflow Total Nitrogen Serial Correlation                               0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Baseflow Total Suspended Solids Mean (log mg/L)                          0.78             0.78           0.78          0.78           0.78            0             0            0.78           0.78            0.78           0.78           0.78             0            0.78
Baseflow Total Suspended Solids Standard Deviation (log mg/L)            0.45             0.45           0.45          0.45           0.45            0             0            0.45           0.45            0.45           0.45           0.45             0            0.45
Baseflow Total Suspended Solids Estimation Method                     Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Baseflow Total Suspended Solids Serial Correlation                        0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Baseflow Total Phosphorus Mean (log mg/L)                               -1.11             -0.47         -1.11          -0.47         -1.11            0             0            -1.11          -1.11           -1.11         -1.11           -1.11            0            -1.11
Baseflow Total Phosphorus Standard Deviation (log mg/L)                  0.48             0.31           0.48          0.31           0.48            0             0            0.48           0.48            0.48           0.48           0.48             0            0.48
Baseflow Total Phosphorus Estimation Method                           Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Baseflow Total Phosphorus Serial Correlation                              0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Baseflow Total Nitrogen Mean (log mg/L)                                  0.14             0.26           0.26          0.26           0.14            0             0            0.14           0.14            0.14           0.14           0.14             0            0.14
Baseflow Total Nitrogen Standard Deviation (log mg/L)                    0.2              0.23           0.23          0.23           0.2             0             0             0.2            0.2             0.2           0.2             0.2             0             0.2
Baseflow Total Nitrogen Estimation Method                             Stochastic        Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic     Stochastic    Stochastic       Stochastic    Stochastic     Stochastic      Stochastic     Stochastic
Baseflow Total Nitrogen Serial Correlation                                0                 0             0              0             0              0             0              0             0                0             0              0               0              0
OUT - Mean Annual Flow (ML/yr)                                           8.56             0.866          3.03          1.08           11.2          3.66          0.733          2.89           0.337           1.69          0.844           0.197          0.557          2.38
OUT - TSS Mean Annual Load (kg/yr)                                    1.19E+03             116        1.37E+03          154        1.57E+03          123           24.2        1.28E+03         152              728           376             86             18.8           332
OUT - TP Mean Annual Load (kg/yr)                                        3.1              0.316          1.11          0.389          4.05          0.661         0.133          2.06           0.238           1.19          0.595           0.139          0.101          0.86
OUT - TN Mean Annual Load (kg/yr)                                        20.2               2            7.03          2.48           26.2          8.49           1.72          6.65           0.782           3.97           1.95           0.457           1.29          5.65
OUT - Gross Pollutant Mean Annual Load (kg/yr)                           189              15.8           55.4          19.8           248           84.7           16.9          66.8            7.8            38.9           19.4           4.53            12.9          32.3
Rain In (ML/yr)                                                         10.82            1.27295       4.45531        1.59118       14.1615        3.97796       0.79559        3.13463       0.365972         1.90942       0.954708       0.222765        0.60465        3.81883
ET Loss (ML/yr)                                                        2.26819          0.409235       1.43233       0.511546       2.96868        0.31477      0.0629535      0.248039      0.0289587        0.222283       0.111141       0.025933       0.0478445       1.44129
Deep Seepage Loss (ML/yr)                                                 0                 0             0              0             0              0             0              0             0                0             0              0               0              0
Baseflow Out (ML/yr)                                                  0.0108182        0.00236364    0.00827273     0.00295455     0.0141591          0             0              0             0           0.000545455   0.000272727      6.36E-05           0         0.00872727
Imp. Stormflow Out (ML/yr)                                             6.47653          0.410277       1.43597       0.512847       8.47662        3.66319       0.732638       2.8866        0.337014         1.5825        0.791249       0.184625       0.556805       0.703333
Perv. Stormflow Out (ML/yr)                                            2.07318          0.452963       1.58537       0.566204       2.71342           0             0              0             0             0.10453      0.0522649      0.0121952           0           1.67248
Total Stormflow Out (ML/yr)                                            8.5497            0.86324       3.02134        1.07905        11.19         3.66319       0.732638       2.8866        0.337014         1.68703       0.843514       0.19682        0.556805        2.37581

Page 22

Total Outflow (ML/yr)                             8.56052           0.865604        3.02961       1.08201        11.2042        3.66319       0.732638     2.8866       0.337014        1.68757       0.843787       0.196884     0.556805    2.38454
Change in Soil Storage (ML/yr)                    -0.008674        -0.00189518    -0.00663309   -0.00236891     -0.0113527         0              0           0            0         -0.000437364   -0.000218636     -5.10E-05       0       -0.00699755
TSS Baseflow Out (kg/yr)                          0.109683         0.0267249       0.0835705     0.0287621       0.152585          0              0           0            0          0.00564527     0.00285345     0.000654273      0       0.0867187
TSS Total Stormflow Out (kg/yr)                    1194.1            116.37         1371.67       153.968        1565.14        122.838        24.2083     1276.79       152.496        728.354        375.575        86.0053     18.8185     332.021
TSS Total Outflow (kg/yr)                         1194.21           116.397         1371.75       153.997        1565.29        122.838        24.2083     1276.79       152.496        728.359        375.578        86.0059     18.8185     332.108
TP Baseflow Out (kg/yr)                          0.00150182        0.00104164     0.00117955     0.00127236    0.00197427          0              0           0            0           7.85E-05       3.99E-05       9.18E-06        0       0.00125173
TP Total Stormflow Out (kg/yr)                    3.09826           0.315241        1.1091        0.387741       4.04614        0.661491      0.132837     2.06362      0.237684        1.18537       0.594779       0.139333     0.101321    0.858645
TP Total Outflow (kg/yr)                          3.09976           0.316283        1.11028       0.389014       4.04811        0.661491      0.132837     2.06362      0.237684        1.18545       0.594819       0.139342     0.101321    0.859896
TN Baseflow Out (kg/yr)                          0.0165275          0.004772       0.0173032     0.00650264     0.0218808          0              0           0            0          0.000858364   0.000418545      9.85E-05        0       0.0131715
TN Total Stormflow Out (kg/yr)                    20.1474           1.99888         7.00898       2.47167        26.2076         8.4863        1.72145     6.64522      0.781926        3.96677        1.95217       0.456891     1.29309     5.63634
TN Total Outflow (kg/yr)                           20.164           2.00365         7.02628       2.47817        26.2295         8.4863        1.72145     6.64522      0.781926        3.96763        1.95259        0.45699     1.29309     5.64951
GP Total Outflow (kg/yr)                          189.143           15.8241         55.3844       19.7801        247.555        84.7437        16.9487     66.778        7.79642        38.8509        19.4254        4.53261      12.881     32.3481


No Imported Data Source nodes


USTM treatment nodes


                                                                                                              Rainwater Tank Rainwater Tank                               Buffer -
Location                                     Bio-Retention Swale    Swale 3       BIOBASIN 2    BIOBASIN 1         x 10           x2           Swale 2     Swale 1    adjacent grass BIOpod CMT6 Rainwater Tank       Swale 4
ID                                                   9                 10             15             16            17             18             20          22            26             27             29             31
                                                                                 BioRetentionNo BioRetentionNo RainWaterTank RainWaterTank                                           BioRetentionNo RainWaterTank
Node Type                                    MediaFiltrationNode   SwaleNode         deV4           deV4           Node          Node         SwaleNode   SwaleNode    BufferNode        deV4           Node        SwaleNode
Lo-flow bypass rate (cum/sec)                        0                 0              0              0              0              0              0           0                            0             0              0
Hi-flow bypass rate (cum/sec)                       100                              100            100            100            100                                                     100           100
Inlet pond volume                                                                                                   0              0                                                                     0
Area (sqm)                                           48                               34            144            22             4.4                                  62.87723881        12             2.2
Initial Volume (m^3)                                                                                               44.9           8.98                                                                  4.49
Extended detention depth (m)                         0.5               0.3            0.3           0.4            0.1            0.1            0.3         0.4                          0.2            0.1            0.3
Number of Rainwater tanks                                                                                          10              2                                                                     1
Permanent Pool Volume (cubic metres)                                                                               44.9           8.98                                                                  4.49
Proportion vegetated                                                                                                0              0                                                                     0
Equivalent Pipe Diameter (mm)                                                                                      158            71                                                                     50
Overflow weir width (m)                              2                                2              2             10             10                                                       2             10
Notional Detention Time (hrs)                                                                                    3.32E-02       3.29E-02                                                              3.32E-02
Orifice Discharge Coefficient                                                                                      0.6            0.6                                                                    0.6
Weir Coefficient                                     1.7                              1.7           1.7            1.7            1.7                                                     1.7            1.7
Number of CSTR Cells                                 3                 10             3              3              2              2             10          10                            3             2              10
Total Suspended Solids - k (m/yr)                  15000             15000           8000           8000           400            400           8000        15000                        8000           400           15000
Total Suspended Solids - C* (mg/L)                   30                30             20             20            12             12             20          30                           20             12             30
Total Suspended Solids - C** (mg/L)                                   13.6                                         12             12             14         13.6                                         12            13.6
Total Phosphorus - k (m/yr)                        12000             12000           6000           6000           300            300           6000        12000                        6000           300           12000
Total Phosphorus - C* (mg/L)                        0.18              0.18           0.13           0.13           0.13           0.13          0.13        0.18                         0.13           0.13           0.18
Total Phosphorus - C** (mg/L)                                         0.143                                        0.13           0.13          0.13        0.143                                       0.13           0.143
Total Nitrogen - k (m/yr)                           1000              1000           500            500            40             40             500        1000                          500            40            1000
Total Nitrogen - C* (mg/L)                           1.7               1.7            1.4           1.4            1.4            1.4            1.4         1.7                          1.4            1.4            1.7
Total Nitrogen - C** (mg/L)                                           1.68                                         1.4            1.4            1.4        1.68                                         1.4           1.68
Threshold Hydraulic Loading for C** (m/yr)                            3500                                        3500           3500           3500        3500                                        3500           3500
Horizontal Flow Coefficient                                                           3              3                                                                                     3
Reuse Enabled                                        Off               Off            Off           Off            Off            Off            Off         Off           Off            Off            Off            Off
Max drawdown height (m)
Annual Demand Enabled                                Off               Off            Off           Off            Off            Off            Off         Off           Off            Off            Off            Off
Daily Demand Enabled                                 Off               Off            Off           Off            Off            Off            Off         Off           Off            Off            Off            Off
Daily Demand Value (ML/day)
Custom Demand Enabled                                Off               Off            Off           Off            Off            Off            Off         Off           Off            Off            Off            Off
Custom Demand Time Series File
Custom Demand Time Series Units
Filter area (sqm)                                    25                               30            144                                                                                   12
Filter perimeter (m)                                                                  14             14                                                                                   14
Filter depth (m)                                     0.5                              0.4           0.5                                                                                   0.4

Page 23

Filter Median Particle Diameter (mm)                0.45
Saturated Hydraulic Conductivity (mm/hr)           316.8                        316            222                                                                            316
Infiltration Media Porosity                         0.3                        0.35            0.35                                                                           0.35
Length (m)                                                       45                                                                      40           50                                                  40
Bed slope                                                        0.01                                                                   0.01         0.01                                                0.01
Base Width (m)                                                   0.2                                                                     0.2          0.2                                                 0.2
Top width (m)                                                    2.6                                                                     2.6          4.2                                                 4
Vegetation height (m)                                            0.25                                                                   0.25         0.25                                                0.25


                                                                           Vegetated with Vegetated with                                                                 Vegetated with
                                                                             Effective      Effective                                                                      Effective
                                                                              Nutrient       Nutrient                                                                       Nutrient
Vegetation Type                                                            Removal Plants Removal Plants                                                                 Removal Plants
Total Nitrogen Content in Filter (mg/kg)                                        800            800                                                                            800
Orthophosphate Content in Filter (mg/kg)                                        55              55                                                                            55
Is Base Lined?                                                                  No             No                                                                             No
Is Underdrain Present?                                                          Yes            Yes                                                                            Yes
Is Submerged Zone Present?                                                      No             No                                                                             No
Submerged Zone Depth (m)
B for Media Soil Texture                           -9999        -9999           13              13           -9999        -9999         -9999        -9999      -9999         13            -9999        -9999
Proportion of upstream impervious area treated                                                                                                                   0.5
Exfiltration Rate (mm/hr)                            0            0              0              0              0            0            0            0          0             0              0           0
Evaporative Loss as % of PET                                                    100            100             0            0                                                 100             0
Depth in metres below the drain pipe                 0
TSS A Coefficient                                   0.52
TSS B Coefficient                                  -0.39
TP A Coefficient                                    1.28
TP B Coefficient                                   -0.19
TN A Coefficient                                    1.67
TN B Coefficient                                   -0.09
Sfc                                                                            0.61            0.61                                                                           0.61
S*                                                                             0.37            0.37                                                                           0.37
Sw                                                                             0.11            0.11                                                                           0.11
Sh                                                                             0.05            0.05                                                                           0.05
Emax (m/day)                                                                   0.008          0.008                                                                          0.008
Ew (m/day)                                                                     0.001          0.001                                                                          0.001
IN - Mean Annual Flow (ML/yr)                       11.9         4.07          1.95            23.1           3.66        0.733         3.73         2.89       0.197        0.894          0.557        2.38
IN - TSS Mean Annual Load (kg/yr)                1.58E+03        777            270         2.85E+03          123          24.2         434        1.28E+03      86           167            18.8        332
IN - TP Mean Annual Load (kg/yr)                    4.17         1.56          0.705           6.05          0.661        0.133         1.05         2.06       0.139         0.33          0.101        0.86
IN - TN Mean Annual Load (kg/yr)                    27.8         8.74          4.48            49.9           8.49         1.72         7.51         6.65       0.457         2.02           1.29        5.65
IN - Gross Pollutant Mean Annual Load (kg/yr)       12.4         38.9          1.78            12.2           84.7         16.9         19.4         66.8       4.53          7.8            12.9        32.3
OUT - Mean Annual Flow (ML/yr)                      11.9         4.07          1.87            22.6           3.66        0.733         3.73         2.89       0.197        0.863          0.557        2.38
OUT - TSS Mean Annual Load (kg/yr)                  456          110           26.3            637            90.2         17.7          88          58.3       54.7          13.5           14.8        48.3
OUT - TP Mean Annual Load (kg/yr)                   1.9         0.687          0.272           3.52           0.59        0.118         0.56         0.458      0.107        0.127         9.26E-02      0.376
OUT - TN Mean Annual Load (kg/yr)                   20.9         7.93          1.71            25.1           7.97         1.61         6.82         5.56       0.404        0.783           1.24        4.77
OUT - Gross Pollutant Mean Annual Load (kg/yr)       0            0              0              0              0            0            0            0         4.53           0              0           0
Flow In (ML/yr)                                   11.9361      4.07151        1.94784        23.0503        3.66341     0.732482      3.72973       2.88676    0.19688     0.893747        0.556879     2.38499
ET Loss (ML/yr)                                      0            0          0.0757309       0.406856          0            0            0            0          0         0.0311576          0           0
Infiltration Loss (ML/yr)                            0            0              0              0              0            0            0            0          0             0              0           0
Low Flow Bypass Out (ML/yr)                          0            0              0              0              0            0            0            0          0             0              0           0
High Flow Bypass Out (ML/yr)                         0            0              0              0              0            0            0            0        0.09844         0              0           0
Orifice / Filter Out (ML/yr)                      6.69345      3.89344        1.60587        16.1424        3.40559     0.679705      3.66446       2.88629    0.09844     0.741726        0.485167     2.35726
Weir Out (ML/yr)                                  5.2438      0.178564       0.264274         6.4889        0.257604    0.0528521    0.0654196        0          0          0.12019       0.0716623    0.0269575
Transfer Function Out (ML/yr)                        0            0              0              0              0            0            0            0          0             0              0           0
Reuse Supplied (ML/yr)                               0            0              0              0              0            0            0            0          0             0              0           0
Reuse Requested (ML/yr)                              0            0              0              0              0            0            0            0          0             0              0           0
% Reuse Demand Met                                   0            0              0              0              0            0            0            0          0             0              0           0
% Load Reduction                                 -0.0097329   -0.0120572      3.9886         1.81782       0.00585644   -0.0102143   -0.00418261   0.0163757     0          3.56158       0.00889699   0.0322738
TSS Flow In (kg/yr)                               1583.02      776.695        270.394         2853.5        122.838      24.2084      433.859       1276.78    86.0059       167.3         18.8185      332.107


[OCR of page images]
Filter Median Particle Diameter (mm)
Saturated Hydraulic Conductivity (mm/hr)
Infiltration Media Porosity

Length (m)

Bed slope

Base Width (m)

Top width (m)

Vegetation height (m)

Vegetation Type

Total Nitrogen Content in Filter (mg/kg)
Orthophosphate Content in Filter (mg/kg)
Is Base Lined?

Is Underdrain Present?

Is Submerged Zone Present?
Submerged Zone Depth (m)

B for Media Soil Texture

Proportion of upstream impervious area treated
Exfiltration Rate (mm/hr)

Evaporative Loss as % of PET

Depth in metres below the drain pipe
TSS A Coefficient

TSS B Coefficient

TP A Coefficient

TP B Coefficient

TN A Coefficient

TN B Coefficient

Sfc

st

Sw

Sh

Emax (m/day)

Ew (m/day)

IN - Mean Annual Flow (ML/yr)

IN - TSS Mean Annual Load (kg/yr)

IN - TP Mean Annual Load (kg/yr)

IN - TN Mean Annual Load (kg/yr)

IN - Gross Pollutant Mean Annual Load (kg/yr)
OUT - Mean Annual Flow (ML/yr)

OUT - TSS Mean Annual Load (kg/yr)
OUT - TP Mean Annual Load (kg/yr)
OUT - TN Mean Annual Load (kg/yr)
OUT - Gross Pollutant Mean Annual Load (kg/yr)
Flow In (ML/yr)

ET Loss (ML/yr)

Infiltration Loss (ML/yr)

Low Flow Bypass Out (ML/yr)

High Flow Bypass Out (ML/yr)

Orifice / Filter Out (ML/yr)

Weir Out (ML/yr)

Transfer Function Out (ML/yr)

Reuse Supplied (ML/yr)

Reuse Requested (ML/yr)

% Reuse Demand Met

% Load Reduction

TSS Flow In (kg/yr)

0.45
316.8
0.3

-9999

0.52
-0.39
1.28
-0.19
1.67
-0.09

11.9
1.58E+03
417
278
12.4
11.9
456
1.9
20.9
0
11.9361
0
0
0
0
6.69345
5.2438
0
0
0
0
-0.0097329
1583.02

45
0.01
0.2

26
0.25

-9999

4.07
7717
1.56
8.74
38.9
4.07
110
0.687
7.93
0
4.07151
0
0
0
0
3.89344
0.178564
0
0
0
0
-0.0120572
776.695

316
0.35

Vegetated with Vegetated with

Effective Effective
Nutrient Nutrient
Removal Plants Removal Plants
800 800
55 55
No No
Yes Yes
No No
13 13
0 0
100 100
0.61 0.61
0.37 0.37
0.11 0.11
0.05 0.05
0.008 0.008
0.001 0.001
1.95 23.1

270 2.85E+03
0.705 6.05
448 49.9
1.78 12.2
1.87 22.6
26.3 637
0.272 3.52
1.71 25.1
0 0
1.94784 23.0503
0.0757309 0.406856
0 0
0 0
0 0
1.60587 16.1424
0.264274 6.4889
0 0
0 0
0 0
0 0
3.9886 1.81782
270.394 2853.5,

222
0.35

-9999

3.66
123
0.661
8.49
84.7
3.66
90.2
0.59
7.97
0
3.66341
0
0
0
0
3.40559
0.257604
0
0
0
0
0.00585644
122.838

-9999

0.733
24.2
0.133
1.72
16.9
0.733
17.7
0.118
1.61
0
0.732482
0
0
0
0
0.679705
0.0528521
0
0
0
0
-0.0102143
24.2084

40
0.01
0.2

26
0.25

-9999

3.73
434
1.05
751
19.4
3.73

88
0.56
6.82

0
3.72973

0

0

0

0
3.66446

0.0654196

0

0

0

0

-0.00418261

433.859

50
0.01
0.2

4.2
0.25

-9999

2.89
1.28E+03
2.06
6.65
66.8
2.89
58.3
0.458
5.56
0
2.88676
0
0
0
0
2.88629

0.0163757
1276.78

-9999
05

0.197
86
0.139
0.457
4.53
0.197
54.7
0.107
0.404
4.53
0.19688
0
0
0
0.09844
0.09844
0

ocoono

0
86.0059

316
0.35

Vegetated with
Effective
Nutrient

Removal Plants

800
55
No

Yes
No

13

100

0.61
0.37
0.11
0.05
0.008
0.001
0.894
167
0.33
2.02
78
0.863
13.5
0.127
0.783
0
0.893747
0.0311576
0
0
0
0.741726
0.12019
0
0
0
0
3.56158
167.3

-9999

0.557
18.8
0.101
1.29
12.9
0.557
14.8
9.26E-02
1.24
0
0.556879
0
0
0
0
0.485167
0.0716623
0
0
0
0
0.00889699
18.8185

40
0.01
0.2

0.25

-9999

2.38
332
0.86
5.65
32.3
2.38
48.3
0.376
477
0
2.38499
0
0
0
0
2.35726
0.0269575
0
0
0
0
0.0322738
332.107

Page 24

TSS ET Loss (kg/yr)                          0                   0               0                0             0            0           0           0          0           0           0            0
TSS Infiltration Loss (kg/yr)                0                   0               0                0             0            0           0           0          0           0           0            0
TSS Low Flow Bypass Out (kg/yr)              0                   0               0                0             0            0           0           0          0           0           0            0
TSS High Flow Bypass Out (kg/yr)             0                   0               0                0             0            0           0           0        43.0029       0           0            0
TSS Orifice / Filter Out (kg/yr)          43.1385             81.3007         4.28689          39.9851        82.8893     16.2788      79.8312    58.2806     11.7417     2.01705     12.6084     44.4313
TSS Weir Out (kg/yr)                      412.771             28.7607         21.9999          597.266        7.30014     1.46668      8.20995       0          0         11.4605     2.19548     3.90595
TSS Transfer Function Out (kg/yr)            0                   0               0                0             0            0           0           0          0           0           0            0
TSS Reuse Supplied (kg/yr)                   0                   0               0                0             0            0           0           0          0           0           0            0
TSS Reuse Requested (kg/yr)                  0                   0               0                0             0            0           0           0          0           0           0            0
TSS % Reuse Demand Met                       0                   0               0                0             0            0           0           0          0           0           0            0
TSS % Load Reduction                       71.2               85.8295         90.2784          77.6678        26.5787     26.6968      79.7074    95.4353     36.3478     91.9441     21.3334     85.4453
TP Flow In (kg/yr)                        4.16619             1.56127         0.705296         6.0455         0.66149     0.132837     1.05277    2.06362    0.139342    0.330332    0.101321     0.859895
TP ET Loss (kg/yr)                           0                   0               0                0             0            0           0           0          0           0           0            0
TP Infiltration Loss (kg/yr)                 0                   0               0                0             0            0           0           0          0           0           0            0
TP Low Flow Bypass Out (kg/yr)               0                   0               0                0             0            0           0           0          0           0           0            0
TP High Flow Bypass Out (kg/yr)              0                   0               0                0             0            0           0           0       0.0696711      0           0            0
TP Orifice / Filter Out (kg/yr)          0.523207            0.620065         0.205148         2.01932       0.545292     0.109495    0.534875    0.457955   0.0371766   0.0952492   0.0802552    0.367072
TP Weir Out (kg/yr)                       1.3795             0.0667865       0.0663906         1.50241       0.0446366   0.00861536   0.0255635      0          0         0.03172    0.0123945   0.00874779
TP Transfer Function Out (kg/yr)             0                   0               0                0             0            0           0           0          0           0           0            0
TP Reuse Supplied (kg/yr)                    0                   0               0                0             0            0           0           0          0           0           0            0
TP Reuse Requested (kg/yr)                   0                   0               0                0             0            0           0           0          0           0           0            0
TP % Reuse Demand Met                        0                   0               0                0             0            0           0           0          0           0           0            0
TP % Load Reduction                       54.3299             56.0069           61.5           41.7463        10.8182     11.0868      46.7655    77.8081     23.3197     61.5632     8.55814     56.2947
TN Flow In (kg/yr)                        27.8442             8.73885         4.48177          49.904         8.4863      1.72145      7.51249    6.64523    0.456989     2.02072     1.29309      5.6495
TN ET Loss (kg/yr)                           0                   0               0                0             0            0           0           0          0           0           0            0
TN Infiltration Loss (kg/yr)                 0                   0               0                0             0            0           0           0          0           0           0            0
TN Low Flow Bypass Out (kg/yr)               0                   0               0                0             0            0           0           0          0           0           0            0
TN High Flow Bypass Out (kg/yr)              0                   0               0                0             0            0           0           0       0.228495       0           0            0
TN Orifice / Filter Out (kg/yr)           8.84379             7.50365         1.12274          10.7263        7.40628     1.49414      6.67265    5.55991    0.175155    0.516979     1.0773      4.71029
TN Weir Out (kg/yr)                       12.0455            0.431178         0.583748         14.3644       0.568045     0.120641    0.146611       0          0         0.26578    0.161499     0.060931
TN Transfer Function Out (kg/yr)             0                   0               0                0             0            0           0           0          0           0           0            0
TN Reuse Supplied (kg/yr)                    0                   0               0                0             0            0           0           0          0           0           0            0
TN Reuse Requested (kg/yr)                   0                   0               0                0             0            0           0           0          0           0           0            0
TN % Reuse Demand Met                        0                   0               0                0             0            0           0           0          0           0           0            0
TN % Load Reduction                       24.9779             9.20045         61.9239          49.7221        6.03293     6.19643      9.22776    16.3323     11.6721     61.2634     4.19861     15.5461
GP Flow In (kg/yr)                        12.378              38.8508         1.78007          12.2255        84.7436     16.9487      19.4254     66.778     4.53259     7.79649     12.881      32.3465
GP ET Loss (kg/yr)                           0                   0               0                0             0            0           0           0          0           0           0            0
GP Infiltration Loss (kg/yr)                 0                   0               0                0             0            0           0           0          0           0           0            0
GP Low Flow Bypass Out (kg/yr)               0                   0               0                0             0            0           0           0          0           0           0            0
GP High Flow Bypass Out (kg/yr)              0                   0               0                0             0            0           0           0        2.2663        0           0            0
GP Orifice / Filter Out (kg/yr)              0                   0               0                0             0            0           0           0          0           0           0            0
GP Weir Out (kg/yr)                          0                   0               0                0             0            0           0           0          0           0           0            0
GP Transfer Function Out (kg/yr)             0                   0               0                0             0            0           0           0          0           0           0            0
GP Reuse Supplied (kg/yr)                    0                   0               0                0             0            0           0           0          0           0           0            0
GP Reuse Requested (kg/yr)                   0                   0               0                0             0            0           0           0          0           0           0            0
GP % Reuse Demand Met                        0                   0               0                0             0            0           0           0          0           0           0            0
GP % Load Reduction                         100                 100             100              100           100          100         100         100       49.9999      100         100          100
PET Scaling Factor                                                               2.1             2.1                                                                        2.1


Generic treatment nodes
                                                           Gross Pollutant Gross Pollutant Gross Pollutant
Location                            Gross Pollutant Trap       Trap            Trap            Trap
ID                                           3                   6               8               11
Node Type                                GPTNode             GPTNode         GPTNode          GPTNode
Lo-flow bypass rate (cum/sec)                0                   0               0                0
Hi-flow bypass rate (cum/sec)               100                 100             100              100
Flow Transfer Function
Input (cum/sec)                              0                   0               0                0
Output (cum/sec)                             0                   0               0                0


[OCR of page images]
TSS ET Loss (kg/yr)

TSS Infiltration Loss (kg/yr)

TSS Low Flow Bypass Out (kg/yr)
TSS High Flow Bypass Out (kg/yr)
TSS Orifice / Filter Out (kg/yr)
TSS Weir Out (kg/yr)

TSS Transfer Function Out (kg/yr)
TSS Reuse Supplied (kg/yr)
TSS Reuse Requested (kg/yr)
TSS % Reuse Demand Met
TSS % Load Reduction

TP Flow In (kg/yr)

TP ET Loss (kg/yr)

TP Infiltration Loss (kg/yr)

TP Low Flow Bypass Out (kg/yr)
TP High Flow Bypass Out (kg/yr)
TP Orifice / Filter Out (kg/yr)

TP Weir Out (kg/yr)

TP Transfer Function Out (kg/yr)
TP Reuse Supplied (kg/yr)

TP Reuse Requested (kg/yr)

TP % Reuse Demand Met

TP % Load Reduction

TN Flow In (kg/yr)

TN ET Loss (kg/yr)

TN Infiltration Loss (kg/yr)

TN Low Flow Bypass Out (kg/yr)
TN High Flow Bypass Out (kg/yr)
TN Orifice / Filter Out (kg/yr)

TN Weir Out (kg/yr)

TN Transfer Function Out (kg/yr)
TN Reuse Supplied (kg/yr)

TN Reuse Requested (kg/yr)

TN % Reuse Demand Met

TN % Load Reduction

GP Flow In (kg/yr)

GP ET Loss (kg/yr)

GP Infiltration Loss (kg/yr)

GP Low Flow Bypass Out (kg/yr)
GP High Flow Bypass Out (kg/yr)
GP Orifice / Filter Out (kg/yr)

GP Weir Out (kg/yr)

GP Transfer Function Out (kg/yr)
GP Reuse Supplied (kg/yr)

GP Reuse Requested (kg/yr)
GP % Reuse Demand Met

GP % Load Reduction

PET Scaling Factor

Generic treatment nodes

Location

ID

Node Type

Lo-flow bypass rate (cum/sec)
Hi-flow bypass rate (cum/sec)
Flow Transfer Function

Input (cum/sec)

Output (cum/sec)

0
0
0
0

43.1385
412.771

ooo

0
71.2
4.16619
0
0
0
0
0.523207
1.3795
0
0
0
0
54.3299
27.8442
0
0
0
0
8.84379
12.0455
0
0
0
0
24.9779
12.378
0

cooeooO oO oC Oe

100

Gross Pollutant Trap
3
GPTNode
0
100

0
0
0
0
81.3007
28.7607
0
0
0
0
85.8295
1.56127
0
0
0
0
0.620065
0.0667865
0
0
0
0
56.0069
8.73885
0
0
0
0
7.50365
0.431178
0
0
0
0
9.20045
38.8508
0

ecoooca COC Oe

100

Gross Pollutant
Trap
6
GPTNode
0
100

0 0

0 0

0 0

0 0
4.28689 39.9851
21.9999 597.266

0 0

0 0

0 0

0 0
90.2784 77.6678
0.705296 6.0455

0 0

0 0

0 0

0 0
0.205148 2.01932
0.0663906 1.50241

0 0

0 0

0 0

0 0
61.5 41.7463
4.48177 49.904

0 0

0 0

0 0

0 0
1.12274 10.7263
0.583748 14.3644

0 0

0 0

0 0

0 0
61.9239 49.7221
1.78007 12.2255

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

100 100
24 21

Gross Pollutant Gross Pollutant

Trap Trap
8 1
GPTNode GPTNode
0 0
100 100
0
0

0
0
0
0
82.8893
7.30014
0
0
0
0
26.5787
0.66149
0
0
0
0
0.545292
0.0446366
0
0
0
0
10.8182
8.4863
0
0
0
0
7.40628
0.568045
0
0
0
0
6.03293
84.7436
0

ocoooecoo OC os

100

0
0
0
0
16.2788
1.46668
0
0
0
0
26.6968
0.132837
0
0
0
0
0.109495
0.00861536
0
0
0
0
11.0868
1.72145
0
0
0
0
1.49414
0.120641
0
0
0
0
6.19643
16.9487
0

cooeooO oO oC Oe

100

0
0
0
0
79.8312
8.20995
0
0
0
0
79.7074
1.05277
0
0
0
0
0.534875
0.0255635
0
0
0
0
46.7655
7.51249
0
0
0
0
6.67265
0.146611
0
0
0
0
9.22776
19.4254
0

cooa OOO Oe

100

BoD oOo

an
@
ey
Ss
a

ooond

0
95.4353
2.06362

0

0

0

0

0.457955

77.8081
6.64523
0
0
0
0
5.55991

16.3323
66.778
0

ocoooecoo OC os

100

0

0

0
43.0029
11.7417

36.3478
0.139342
0
0
0
0.0696711
0.0371766

23.3197
0.456989
0
0
0
0.228495
0.175155

11.6721
4.53259
0
0
0
2.2663

ocoono

0
49.9999

ooo

0
2.01705
11.4605

0

0

0

0
91.9441

0.330332

0

0

0

0

0.0952492
0.03172

0

0

0

0
61.5632
2.02072

0

0

0

0

0.516979
0.26578

0

0

0

0
61.2634
7.79649

0

ecoooca COC Oe

100
21

0
0
0
0
12.6084
2.19548
0
0
0
0
21.3334
0.101321
0
0
0
0
0.0802552
0.0123945
0
0
0
0
8.55814
1.29309
0
0
0
0
1.0773
0.161499
0
0
0
0
4.19861
12.881
0

ocoooecoo OC os

100

0
0
0
0
44.4313
3.90595
0
0
0
0
85.4453
0.859895
0
0
0
0
0.367072
0.00874779
0
0
0
0
56.2947
5.6495
0
0
0
0
4.71029
0.060931
0
0
0
0
15.5461
32.3465
0

cooeooO oO oC Oe

100

Page 25

Input (cum/sec)                                    10         10         10         10
Output (cum/sec)                                   10         10         10         10
Gross Pollutant Transfer Function
Enabled                                           TRUE       TRUE       TRUE      TRUE
Input (kg/ML)                                       0          0          0         0
Output (kg/ML)                                      0          0          0         0
Input (kg/ML)                                      100        100        100       100
Output (kg/ML)                                      5          5          5         5
Enabled                                           TRUE       TRUE       TRUE      TRUE
Input (mg/L)                                        0          0          0         0
Output (mg/L)                                       0          0          0         0
Input (mg/L)                                       50         50         50         50
Output (mg/L)                                      50         50         50         50
Total Phosphorus Transfer Function
Enabled                                           TRUE       TRUE       TRUE      TRUE
Input (mg/L)                                        0          0          0         0
Output (mg/L)                                       0          0          0         0
Input (mg/L)                                        5          5          5         5
Output (mg/L)                                       5          5          5         5
Total Suspended Solids Transfer Function
Enabled                                           TRUE       TRUE       TRUE      TRUE
Input (mg/L)                                        0          0          0         0
Output (mg/L)                                       0          0          0         0
Input (mg/L)                                      1000       1000       1000       1000
Output (mg/L)                                     1000       1000       1000       1000
TSS Flow based Efficiency Enabled                  Off        Off        Off        Off
TSS Flow based Efficiency
TP Flow based Efficiency Enabled                   Off        Off        Off        Off
TP Flow based Efficiency
TN Flow based Efficiency Enabled                   Off        Off        Off        Off
TN Flow based Efficiency
GP Flow based Efficiency Enabled                   Off        Off        Off        Off
GP Flow based Efficiency
IN - Mean Annual Flow (ML/yr)                      12.2       3.03       11.9      1.95
IN - TSS Mean Annual Load (kg/yr)                1.28E+03   1.37E+03   1.58E+03    270
IN - TP Mean Annual Load (kg/yr)                   3.69       1.11       4.17      0.705
IN - TN Mean Annual Load (kg/yr)                   28.1       7.03       27.8      4.48
IN - Gross Pollutant Mean Annual Load (kg/yr)      189        55.4       248       35.6
OUT - Mean Annual Flow (ML/yr)                     12.2       3.03       11.9      1.95
OUT - TSS Mean Annual Load (kg/yr)               1.28E+03   1.37E+03   1.58E+03    270
OUT - TP Mean Annual Load (kg/yr)                  3.69       1.11       4.17      0.705
OUT - TN Mean Annual Load (kg/yr)                  28.1       7.03       27.8      4.48
OUT - Gross Pollutant Mean Annual Load (kg/yr)     9.46       2.77       12.4      1.78
Flow In (ML/yr)                                  12.2242    3.02957    11.9361    1.94784
ET Loss (ML/yr)                                     0          0          0         0
Infiltration Loss (ML/yr)                           0          0          0         0
Low Flow Bypass Out (ML/yr)                         0          0          0         0
High Flow Bypass Out (ML/yr)                        0          0          0         0
Orifice / Filter Out (ML/yr)                        0          0          0         0
Weir Out (ML/yr)                                    0          0          0         0
Transfer Function Out (ML/yr)                    12.2242    3.02957    11.9361    1.94784
Reuse Supplied (ML/yr)                              0          0          0         0
Reuse Requested (ML/yr)                             0          0          0         0
% Reuse Demand Met                                  0          0          0         0
% Load Reduction                                    0          0          0         0
TSS Flow In (kg/yr)                              1284.39    1371.74    1583.02    270.394
TSS ET Loss (kg/yr)                                 0          0          0         0
TSS Infiltration Loss (kg/yr)                       0          0          0         0
TSS Low Flow Bypass Out (kg/yr)                     0          0          0         0

Page 26

TSS High Flow Bypass Out (kg/yr)                       0            0         0          0
TSS Orifice / Filter Out (kg/yr)                       0            0         0          0
TSS Weir Out (kg/yr)                                   0            0         0          0
TSS Transfer Function Out (kg/yr)                    1284.39      1371.74   1583.02   270.394
TSS Reuse Supplied (kg/yr)                             0            0         0          0
TSS Reuse Requested (kg/yr)                            0            0         0          0
TSS % Reuse Demand Met                                 0            0         0          0
TSS % Load Reduction                                   0            0         0          0
TP Flow In (kg/yr)                                   3.68971      1.11027   4.16619   0.705296
TP ET Loss (kg/yr)                                     0            0         0          0
TP Infiltration Loss (kg/yr)                           0            0         0          0
TP Low Flow Bypass Out (kg/yr)                         0            0         0          0
TP High Flow Bypass Out (kg/yr)                        0            0         0          0
TP Orifice / Filter Out (kg/yr)                        0            0         0          0
TP Weir Out (kg/yr)                                    0            0         0          0
TP Transfer Function Out (kg/yr)                     3.68971      1.11027   4.16619   0.705296
TP Reuse Supplied (kg/yr)                              0            0         0          0
TP Reuse Requested (kg/yr)                             0            0         0          0
TP % Reuse Demand Met                                  0            0         0          0
TP % Load Reduction                                    0            0         0          0
TN Flow In (kg/yr)                                   28.1383      7.02624   27.8442   4.48177
TN ET Loss (kg/yr)                                     0            0         0          0
TN Infiltration Loss (kg/yr)                           0            0         0          0
TN Low Flow Bypass Out (kg/yr)                         0            0         0          0
TN High Flow Bypass Out (kg/yr)                        0            0         0          0
TN Orifice / Filter Out (kg/yr)                        0            0         0          0
TN Weir Out (kg/yr)                                    0            0         0          0
TN Transfer Function Out (kg/yr)                     28.1383      7.02624   27.8442   4.48177
TN Reuse Supplied (kg/yr)                              0            0         0          0
TN Reuse Requested (kg/yr)                             0            0         0          0
TN % Reuse Demand Met                                  0            0         0          0
TN % Load Reduction                                    0            0         0          0
GP Flow In (kg/yr)                                   189.135      55.3853   247.552   35.6045
GP ET Loss (kg/yr)                                     0            0         0          0
GP Infiltration Loss (kg/yr)                           0            0         0          0
GP Low Flow Bypass Out (kg/yr)                         0            0         0          0
GP High Flow Bypass Out (kg/yr)                        0            0         0          0
GP Orifice / Filter Out (kg/yr)                        0            0         0          0
GP Weir Out (kg/yr)                                    0            0         0          0
GP Transfer Function Out (kg/yr)                     9.45698      2.7691    12.378    1.78007
GP Reuse Supplied (kg/yr)                              0            0         0          0
GP Reuse Requested (kg/yr)                             0            0         0          0
GP % Reuse Demand Met                                  0            0         0          0
GP % Load Reduction                                   100          100       100        100


Other nodes
Location                                         COOROY CREEK
ID                                                     1
Node Type                                         ReceivingNode
IN - Mean Annual Flow (ML/yr)                         37.5
IN - TSS Mean Annual Load (kg/yr)                   1.19E+03
IN - TP Mean Annual Load (kg/yr)                      5.93
IN - TN Mean Annual Load (kg/yr)                      48.9
IN - Gross Pollutant Mean Annual Load (kg/yr)         4.53
OUT - Mean Annual Flow (ML/yr)                        37.5
OUT - TSS Mean Annual Load (kg/yr)                  1.19E+03
OUT - TP Mean Annual Load (kg/yr)                     5.93
OUT - TN Mean Annual Load (kg/yr)                     48.9
OUT - Gross Pollutant Mean Annual Load (kg/yr)        4.53

Page 27

% Load Reduction                                         1.35
TSS % Load Reduction                                     84.2
TN % Load Reduction                                       45
TP % Load Reduction                                      60.3
GP % Load Reduction                                      99.4


Links
Location                                             Drainage Link       Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link
Source node ID                                             2                  5               12              9               6               16              10              13              17              14              18              20              19              22              23
Target node ID                                             3                  6               8               1               16              1               16              17              3               18              8               16              22              20              10
Muskingum-Cunge Routing                               Not Routed          Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed
Muskingum K
Muskingum theta
IN - Mean Annual Flow (ML/yr)                             8.56               3.03            11.2            11.9            3.03            22.6            4.07            3.66            3.66           0.733           0.733            3.73            2.89            2.89            1.69
IN - TSS Mean Annual Load (kg/yr)                      1.19E+03           1.37E+03        1.57E+03           456          1.37E+03           637             110             123             90.2            24.2            17.7             88          1.28E+03           58.3            728
IN - TP Mean Annual Load (kg/yr)                          3.1                1.11            4.05             1.9            1.11            3.52           0.687           0.661            0.59           0.133           0.118            0.56            2.06           0.458            1.19
IN - TN Mean Annual Load (kg/yr)                          20.2               7.03            26.2            20.9            7.03            25.1            7.93            8.49            7.97            1.72            1.61            6.82            6.65            5.56            3.97
IN - Gross Pollutant Mean Annual Load (kg/yr)             189                55.4            248              0              2.77             0               0              84.7             0              16.9             0               0              66.8             0              38.9
OUT - Mean Annual Flow (ML/yr)                            8.56               3.03            11.2            11.9            3.03            22.6            4.07            3.66            3.66           0.733           0.733            3.73            2.89            2.89            1.69
OUT - TSS Mean Annual Load (kg/yr)                     1.19E+03           1.37E+03        1.57E+03           456          1.37E+03           637             110             123             90.2            24.2            17.7             88          1.28E+03           58.3            728
OUT - TP Mean Annual Load (kg/yr)                         3.1                1.11            4.05             1.9            1.11            3.52           0.687           0.661            0.59           0.133           0.118            0.56            2.06           0.458            1.19
OUT - TN Mean Annual Load (kg/yr)                         20.2               7.03            26.2            20.9            7.03            25.1            7.93            8.49            7.97            1.72            1.61            6.82            6.65            5.56            3.97
OUT - Gross Pollutant Mean Annual Load (kg/yr)            189                55.4            248              0              2.77             0               0              84.7             0              16.9             0               0              66.8             0              38.9


Catchment Details
                                                 LowerMillCarpark_7Feb
Catchment Name                                            2020
Timestep                                               6 Minutes
Start Date                                             1/01/1973
End Date                                           31/12/1983 23:54
Rainfall Station                                    40059 COOROY
                                                  User-defined monthly
ET Station                                                PET
Mean Annual Rainfall (mm)                                1595
Mean Annual ET (mm)                                      1631

Page 28

Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link   Drainage Link
     24              25              26              28              29              21              27              8               3               30              31              4               7               11              15
     20              26              1               29              27              27              1               9               16              31              10              11              11              15              1
 Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed      Not Routed



   0.844           0.197           0.197           0.557           0.557           0.337           0.863            11.9            12.2            2.38            2.38           0.866            1.08            1.95            1.87
    376              86             54.7            18.8            14.8            152             13.5         1.58E+03        1.28E+03           332             48.3            116             154             270             26.3
   0.595           0.139           0.107           0.101          9.26E-02         0.238           0.127            4.17            3.69            0.86           0.376           0.316           0.389           0.705           0.272
    1.95           0.457           0.404            1.29            1.24           0.782           0.783            27.8            28.1            5.65            4.77             2              2.48            4.48            1.71
    19.4            4.53            4.53            12.9             0               7.8             0              12.4            9.46            32.3             0              15.8            19.8            1.78             0
   0.844           0.197           0.197           0.557           0.557           0.337           0.863            11.9            12.2            2.38            2.38           0.866            1.08            1.95            1.87
    376              86             54.7            18.8            14.8            152             13.5         1.58E+03        1.28E+03           332             48.3            116             154             270             26.3
   0.595           0.139           0.107           0.101          9.26E-02         0.238           0.127            4.17            3.69            0.86           0.376           0.316           0.389           0.705           0.272
    1.95           0.457           0.404            1.29            1.24           0.782           0.783            27.8            28.1            5.65            4.77             2              2.48            4.48            1.71
    19.4            4.53            4.53            12.9             0               7.8             0              12.4            9.46            32.3             0              15.8            19.8            1.78             0


[OCR of page images]
Drainage Link
24
20
Not Routed

0.844
376
0.595
1.95
19.4
0.844
376
0.595
1.95
19.4

Drainage Link
25
26
Not Routed

0.197
86
0.139
0.457
4.53
0.197
86
0.139
0.457
4.53

Drainage Link
26
1
Not Routed

0.197
54.7
0.107
0.404
4.53
0.197
54.7
0.107
0.404
4.53

Drainage Link
28
29
Not Routed

0.557
18.8
0.101
1.29
12.9
0.557
18.8
0.101
1.29
12.9

Drainage Link
29
27
Not Routed

0.557
14.8
9.26E-02
1.24

0.557
14.8
9.26E-02
1.24

Drainage Link
21
27
Not Routed

0.337
152
0.238
0.782
78
0.337
152
0.238
0.782
78

Drainage Link
27
1
Not Routed

0.863

13.5
0.127
0.783

0.863

13.5
0.127
0.783

Drainage Link
8
9
Not Routed

11.9
1.58E+03
417
278
12.4
11.9
1.58E+03
417
278
12.4

Drainage Link
3
16
Not Routed

12.2
1.28E+03
3.69
28.1
9.46
12.2
1.28E+03
3.69
28.1
9.46

Drainage Link
30
31
Not Routed

2.38
332
0.86
5.65
32.3
2.38
332
0.86
5.65
32.3

Drainage Link
31
10
Not Routed

2.38
48.3
0.376
4.77

2.38
48.3
0.376
4.77

Drainage Link
4
1
Not Routed

0.866
116
0.316

15.8
0.866
116
0.316

15.8

Drainage Link
7
1
Not Routed

1.08
154
0.389
2.48
19.8
1.08
154
0.389
2.48
19.8

Drainage Link
11
15
Not Routed

1.95
270
0.705
4.48
1.78
1.95
270
0.705
4.48
1.78

Drainage Link
15
1
Not Routed

1.87

26.3
0.272

1.71

1.87

26.3
0.272

1.71

Page 29

                                                                      Callaghan & Toth


APPENDIX B                               -   Site Management Plan – Contaminated
Land




                                                                                      B
2001 Lower Mill Carpark Extension SWMP                                February 2020

Page 30

®

Queensland
Government

Environmental
Protection Agency
Queensland Parks

and Wildlife Service

DRAFT SITE MANAGEMENT PLAN (SMP)
Environmental Protection Act 1994 (EP Act), Chapter 7 Part 8 Division 5

DATE: 28 April 2008

RPD Lot 5 on Plan SP173770;
Lot 7 on Plan SP173770
Lot 2 on Plan RP47020;
Lot 1 on Plan RP87371 EPA File: 902326

1.0 SUMMARY OF CONTAMINATION

These allotments, Lot 5 on SP173770, (formerly part of Lot 2 on RP87371) Lot 7 on
SP173770 (formerly part of Lot 1 on RP 885282), Lot 2 on RP47020 and Lot | on
RP87371; were part of the Boral Cooroy timber mill which operated from 1959-2001.
Prior to the establishment of the timber mill at the site, the site was used for transient
farming and residence. No environmental impacts are known to have occurred at the
site prior to its use as a timber mill.

The site, known as the Cooroy Lower Mill Domain, is currently occupied by a number
of (vacant) buildings associated with the old timber mill activities. It is proposed to use
the site to create a cluster of wood working activities for community use through the
refurbishment, reuse and preservation of the old mill kiln, hopper and boiler building.

Previous environmental investigations at the timber mill site have identified a number
of areas as containing levels of soil contamination in excess of the Queensland
Environmental Protection Agency's (EPA's) Environmental Investigation Levels (EILs).
Figure 1 shows the location of the former timber mill infrastructure in relation to the
current allotment boundaries.

Based on the results of the investigations conducted across the allotments, the
aforementioned allotments can be used for non-sensitive commercial/industrial landuses
which includes premises such as shops and offices as well as factories and industrial
sites with minimal opportunities for contact with residual impacted soil, provided the
controls outlined herein are implemented and maintained. The proposed activities are
consistent with these land uses.

Soil impact left in place is discussed below.

Lot 2 RP47020:

Metal concentrations in excess of Queensland Environmental Protection Agency (Qld
EPA) Environmental Investigation Levels (EILs) remain onsite (as shown on Figure 2),

with maximum concentrations detected being:111mg/kg of arsenic, which is also above
Health-based Investigation Level (HIL) “A” ( standard residential with

Page 31

garden/accessible soil); 109mg/kg of copper; and 1220 mg/kg of zinc. All impacted
material occurs at shallow depth (0-200mm) in fill material present across the lot, and
attenuates rapidly with depth, with all the (200-500mm) samples collected from natural
insitu soils at these locations reporting metal concentrations below the EILs.

Lot 1 RP87371:

Metal concentrations in excess of Qld EPA EILs remain onsite (as shown on Figure 3),
with maximum concentrations being: 112mg/kg of arsenic (also above HIL “A”
guidelines); 143mg/kg of copper; 148mg/kg of chromium (III); and 884 mg/kg zinc.
Although there is no nominated guideline for boron, two samples collected from this
allotment also reported concentrations of boron in excess of the acknowledged
background concentrations (maximum concentration detected was 723mg/kg). All
impact occurs in samples collected at shallow depth (0-200mm) in fill material present
across the lot, however in some locations the impact has not been vertically delineated.

Lot 5 SP173771:

In the area to the east and south east of the former boiler building (as shown on Figure
4) metal concentrations in excess of Qld EPA commercial/industrial health based
investigation levels (HIL “F”) guidelines remain onsite, with maximum concentrations
detected being: 8820mg/kg of arsenic; 8930mg/kg of copper; and 30400mg/kg of
chromium. This impact occurs at shallow depth (0-200mm) in fill material present in
this area of the lot, however in one location it has not been vertically delineated.

Although no nominated guideline exists for boron, these samples also reported
concentrations of boron in excess of the acknowledged background concentrations
(maximum concentration detected was 9410mg/kg).

In other areas of Lot 5, metal concentrations in excess of Qld EPA EILs remain onsite,
with maximum concentrations detected in other areas of the site being: 60mg/kg for
arsenic, and 131mg/kg for chromium(III). All impacted material occurs at shallow
depth (0-200mm) in fill material, however in some areas the impact has not been
vertically delineated.

Lot 7 SP173771
Areas of residual soil impact across this lot are shown in Figure 5.

Residual soil impact in locations F2 and F3 exceeds Qld EPA EILs for arsenic, copper
and chromium (IIT). As part of soil remediation works undertaken at the site in the year
2000, this area was capped by a 500mm clay layer. This clay capping layer has a
confirmed density ratio of 95.5%. This capping layer was covered by 100mm of clean
soil.

Residual soil impact in the location of the former evaporation pond exceeds Qld EPA
HIL”F” levels for arsenic, and the EILs for copper and chromium (III). As part of soil
remediation works undertaken at the site in 2000, this area was backfilled with soil
excavated during the replacement of the causeway at the site, the soil excavated from
behind the boiler as part of other soil remediation works onsite, and imported clay fill.
This backfill was then capped by a 500mm clay layer. Sections of this clay capping

Page 32

layer were covered by either 100mm of road base (trafficable areas) or clean soil (non-
trafficable areas).

Metal concentrations in excess of Qld EPA EILs also exist in the vicinity of the former
sawdust shed. This area has maximum concentrations of 101mg/kg for arsenic (also
above HIL “A” guidelines), 92mg/kg for copper, and 142mg/kg for chromium (II). All
impact was detected in soil samples collected at shallow depth (0-200mm) in fill
material present in this area of the lot, however the impact has not been vertically
delineated in some locations.

2.0 OBJECTIVES OF THE SMP
The purpose of this SMP is to manage contaminated soils and materials on the lots in a

manner that protects human health and the environment. This objective will be achieved
through the following processes.

° Monitoring and control of all intrusive site works including excavations,
trenching, drilling and scraping.
° The placement and maintenance of landscaping and capping layers which will

provide barriers to occupiers of the site and the general public from the
contamination, as well as restricting erosion and water infiltration and the
potential for residual impact to migrate via leaching processes.

° The application of maintenance and monitoring requirements for the capping
layers.

3.0 ACHIEVEMENT AND MAINTENANCE OF OBJECTIVES

3.1 Responsibility.

The owner of the land (as defined in the Environmental Protection Act 1994) is to
ensure that this SMP and any variations approved or required by the administering
authority are complied with in order to achieve the objectives. The obligations and
conditions set out in this SMP bind the owner of the land.

3.2. Provision of SMP to appropriate persons. The owner must provide all persons
involved in building design and planning and all contractors and lessees conducting
building and/or excavation works with a copy of the SMP prior to commencement of
site works. All persons occupying or working on the site must comply with the
requirements of the SMP.

3.3 Site Capping.

3.3.1 Existing Capping. The existing capping is to remain in place, undisturbed, other
than for the construction of service trenches. In the event that the existing capping
layers are disturbed or removed, a new capping layer, of equal or better standard and
designed to achieve the objectives of this SMP, is to be installed.

The capping layer must consist of 500mm of compacted clay and/or other equivalent
low permeability (less than 1x10” m/s) cover, and is to be installed within areas as
outlined in Figures 2 — 5 (attached) to maintain a barrier between the residual
contamination and site users. The capping layer is to be maintained in sound condition
at all times. If vegetation is to be placed over the capping layer, a minimum thickness of

Page 33

100mm of top soil must be placed on top of the capping layer and only short root zoned
plants such as grasses can be used as a vegetative cover.

3.3.2 Boiler Room Area. The identified contamination area (as shown on Figure 4) is to
be capped with at least 100mm of structural reinforced concrete or interlocking pavers
on a compacted base or equivalent cover. This area is not to be used for any activity
which will disturb the capping, or surface soils.

3.3.3 Capping Maintenance. All capping materials are to be maintained in a sound
condition at all times. Inspections of the site during construction of any capping
materials are to be undertaken with documentation of actual cover, thicknesses and
details.

3.4 Soil excavation & Removal. Any soil excavated on the site must be assessed for
contaminants of concern to determine if the material is contaminated and to identify
appropriate management and disposal/re-use options.

Representative sampling and analysis of soil from excavation in contaminated areas
must be managed by a person suitably qualified and experienced in accordance with
Section 381 of the Environmental Protection Act 1994 (EP Act). Contaminated soil
must not be removed off-site without a disposal permit in accordance with Section 424
of the EP Act.

3.5 Unexpected Contamination. If during any site earthworks or excavation,
offensive or noxious odours and/or evidence of gross contamination not previously
detected is observed, site works are to cease in that area and action taken to immediately
abate potential environmental harm. The administering authority is to be notified in
writing within two business days of detection and advised of appropriate remedial
action.

Any remedial action is to be developed by a person suitably qualified and experienced
in accordance with Section 381 of the EP Act.

3.6 General Environmental Protection. All earthworks are to be undertaken in
accordance with general environmental protection measures to avoid unwanted
migration and deposition of soil. These measures include the control of dust, noise,
stormwater runoff, sediment, erosion, spillage from haulage trucks and odour releases
involving the handling or movement of contaminated material.

3.7. Workplace Health and Safety. A Workplace Health and Safety Plan (WH&S
plan), which conforms to the requirements of the Workplace Health and Safety Act 1995
is to be developed for any site excavation works in contaminated areas. The WH&S
plan must specifically address contaminants of concern.

4.0 MONITORING AND REPORTING

The owner is to undertake annual inspections of the site to determine and record the
state of the installed capping in contaminated areas, and to provide the results of these
inspections, and any corrective actions implemented to ensure that capping and
protective barriers including vegetative covers remain in sound condition, to authorised
officers of the EPA on request.

Page 34

Records are to be kept of any inspections, soil excavation in contaminated areas,

disposal permits and SMP compliance for review by the administering authority from
time to time.

This SMP has been developed to manage site contamination risks present at the issue
date. Subsequent uses of the site may result in the need to review the plan.

This SMP makes reference to two plan attachments that are available from the
Administering Authority if required.

Page 35

                                                                    Callaghan & Toth

APPENDIX C                               -   IPWEAQ Standard Drawings




                                                                                        C
2001 Lower Mill Carpark Extension SWMP                                  February 2020

Page 36

 

Field inlet Type 1 without
concrete apron as per
(IPWEAQ Std Dwg D—-0050)

Filter cloth, refer note 4 or organic
geotextile matting fixed to perimeter of pit
to avoid runnelling of water between pit
and soil interface. 300 wide, 100 cover

Extended detention depth 100 to

 

 

 

 

 

 

 

Bioretention basin finished surface level,
refer project drawings and notes 6 and 7

refer project drawings for depth

Transition layer — coarse sand,

Refer note 1

 

——— Drainage layer — fine aggregate,

 

 

 

 

 

 

Posy 300 (typically 300), refer project
drawings
782 Vegetated surface,
4 ol | Slo refer iy 7
v ” “\/ Bf \/ ——— Mulch layer, 50-75
. v > VY refer note 5
itr , Overflow pit L ~~

y

I >

Ivo vy
Filter cloth to extend |
500 up batter under | > ——— Filter media — loamy sand,
topsoil pinned to batter, vy .
refer note 4 I. , Pipe sealed “90 MIN. cover of drainage layer 500 (typical), 400 MIN

| » into pit (fine aggregate) over subsoil

' ° drainage pipe

Ie ’ =——— constant depth — 100,

{ r yA nom. size 0.5-2.0

\-°

¥ flow Under—drain, refer note 2 constant depth — 200,

yoy ot ee nom. size 2-5

| a Basin base to grade at 0.5% MIN,

* refer note 6

 

 

 

 

 

NOTES:

Bioretention media specification shall be in accordance with the Facility for

Filter cloth, refer note 4

BIORETENTION BASIN OVERFLOW PIT DETAIL

Advancing Biofiltration 4. Filter cloth — non-woven geotextile.

Filter cloth not to be placed between any filter layers.

"Guidelines for Soil Filter Media in Bioretention Systems”.
accordance with the Facility for Advancing Biofiltration ’Practice Note 1:

Bioretention hydraulic conductivity shall be in
In Situ Measurement of

Hydraulic Conductivity”. The number of samples to be tested shall be in accordance with the "Water
Sensitive Urban Design Construction and Establishment Guidelines — Swales, Bioretention Systems and

Wetlands (Water by Design).

2. Under—drain: slotted rigid pipe (uPVC or similar to AS 2439.1) or approved equivalent, 0.5% MIN. grade.

Impervious

liner may be required subject to soil testing requirements in accordance with the "Water Sensitive
Urban Design Technical Design Guidelines” (Water by Design).

"Water Sensitive Urban Design Construction and

Refer project drawings for diameter and invert level (Typically 100-150).

Surface to be mulched and planted as per

Establishment Guidelines — Swales, Bioretention Systems and Wetlands” (Water by Design) must be

with a filter sock surrounding pipe. Under—drainage pipes shall be sealed into pits using grout or other
approved watertight seal.

3. Refer to project drawings for vegetated batter slopes (1 in 3 MAX, 1 in 4 typical) and batter topsoil

requirements.

achieved. Construction tolerances must be noted on project plans. Invert levels of pits, pipes and base

Refer landscape drawings for plant specification. Plant specification and density shall be in accordance
with the "Water Sensitive Urban Design Technical Design Guidelines” (Water by Design).

5. Basin finished surface level is top of filter media.
landscape drawings.
6. Construction tolerances as documented in the
Pipe should not be installed
levels must be noted on project drawings.
7.
8. All dimensions are in millimetres unless otherwise noted.

These drawings have been developed in consultation between the participating councils.
BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate council

 

 

 

 

 

 

13/01/2010

ORIGINAL _ISSUE

 

 

 

2>

DATE.

 

REVISIONS.

 

Q

INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA
QUEENSLAND DIMISION INC.
STANDARD DRAWINGS

 

BIORETENTION STANDARD PROFILE

OVERFLOW PIT

DRAWING No.

 

WSUD-001

 

 

 

2-T TTT]

 

Page 37

 

NOTES:

Bioretention media specification shall be in
accordance with the Facility for Advancing
Biofiltration "Guidelines for Soil Filter Media in
Bioretention Systems”. Bioretention hydraulic
conductivity shall be in accordance with the
Facility for Advancing Biofiltration "Practice Note 1:
In Situ Measurement of Hydraulic Conductivity”.
The number of samples to be tested shall be in

accordance with the "Water Sensitive Urban Design
Construction and Establishment Guidelines —

Swales, Bioretention Systems and Wetlands” (Water
by Design).

2. Under—drain: slotted rigid pipe (uPVC or similar to

AS 2439.1) or approved equivalent, 0.5% MIN.
grade. Refer project drawings for diameter and
invert level (typically @100-150). Pipe joins should
be glued using plumbing cement. Pipe should not
be installed with a filter sock surrounding pipe.
Under—drainage pipes shall be sealed into pits
using grout or other approved watertight seal.

3. Refer to project drawings for vegetated batter

slopes (1 in 3 MAX, 1 in 4 typical) and batter
topsoil requirements.

4. Filter cloth — non-woven geotextile. Filter cloth

not to be placed between any filter

layers. Impervious liner may be required subject to
soil testing requirements in accordance with the
‘Water Sensitive Urban Design Technical Design
Guidelines” (Water by Design).

5. Basin finished surface level is top of filter media.

Surface to be mulched and planted as per
landscape drawings.

6. Construction tolerances as documented in the

"Water Sensitive Urban Design Construction and
Establishment Guidelines — Swales, Bioretention
Systems and Wetlands” (Water by Design) must be
achieved. Construction tolerances must be noted
on project plans. Invert levels of pits and pipes
and base levels must be shown on project
drawings.

7. Refer landscape drawings for plant specification.

Plant specification and density shall be in
accordance with the "Water Sensitive Urban Design
Technical Design Guidelines” (Water by Design).

8. All dimensions are in millimetres unless otherwise

C.l. cap. extend cap to
approx. 150 above
ees basin surface

YW V/

Subsoil drain cleanout —

pvc pipe (non slotted)

and connector cleanouts

at head of subsoil drain
4S

‘Y’ branch
Refer note 2

Provide locking function or
secure cap with screws

V/

fer
No te
3

\

 

 

[p

Filter cloth extend
500mm up batter
under topsoil pinned to
batter, refer note 4.

 

 

 

 

Mulch layer — 50-75,
refer note 5

Bioretention basin finished surface level,
refer project drawings and notes 5 and 7

|\~——— Filter media — loamy sand,
refer project drawings for depth,
500 (typical) 400 MIN

Transition layer — coarse sand,

constant depth — 100, refer note 1

 

135° Bend, refer note 2 |

nom. size 0.5-2.0

 

 

 

k——— Drainage layer — fine aggregate,

 

 

constant depth — 200,

 

 

nom. size 2-5

 

Provide end cap at head

of subsoil drain Filter cloth, refer note 4

| | —DRAI T — | l

Provide locking function or C.l. cap. extend cap to

 

\Besin base to grade at 0.5% MIN to overflow pit, refer note 6

50 MIN cover of drainage
layer (fine aggregate) over
under drainage pipe

 

Mulch layer — 50-75,

 

 

 

secure cap with ene approx. 150 above
batter surface
ee Filter cloth extend 500
l~ up batter under topsoil
pinned to batter, refer note 4 VV
135° Bend,
Subsoil drain cleanout foe note 2
pvc pipe (non slotted) *Y’ branch,

 

and connector cleanouts

at head of subsoil drain refer note 2

—————_ _ _

refer note 5

Pw

|I~_—— Filter media — loamy sand,
refer project drawings for depth,
500 (typical) 400 MIN

Bioretention basin finished surface level,
refer project drawings and notes 6 and 7

Transition layer — coarse sand,

constant depth — 100, refer note 1

 

Provide end cap at head l

nom. size 0.5-2.0

 

 

 

<= Drainage layer — fine aggregate,

 

of subsoil fone

 

 

constant depth — 200,
nom. size 2-5

 

 

 

Basin base to grade at 0.5% MIN
to overflow pit, refer note 6

Filter cloth, refer note 4 a

BIORETENTION UNDER—DRAIN CLEANOUT — IN BATTER

150 MIN cover of drainage
layer (fine aggregate) over
under drainage pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

noted.
These drawings have been developed in consultation between the participating councils.
BEFORE USE, the user shall confirm that the drawing has been adopted by the appropriate council
INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA BIORETENTION STANDARD PROFILE we Hy
QUEENSLAND DIVISION INC. UNDERDRAIN CLEANOUT WSUD—003 =
A 13, 1/2010 ORIGINAL ISSUE — STANDARD DRAWINGS La

 

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.