Original source · versioned page text
Attachment D - Stormwater and Water Quality report
Callaghan & Toth
4.4 MUSIC Modelling Results
The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 6.2.1 is the current version and capable
of incorporating rainwater re-use in the model. These features have been used in making
comparisons between different stormwater management systems for this report.
4.4.1 Water Quality Objectives
This model meets the pollution load reduction target as detailed in the State Planning Policy
2017 (Appendix 2: Table B). The following have been included in Appendix A.
The treatment train effectiveness for the system.
The MUSIC Version 6.2.1 Summary Report.
The information above indicates that the new carpark, carpark roof, footpaths, and associated
landscaping with the proposed stormwater treatment train will achieve reductions in pollutant
loads as detailed in Table 4.2 below.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
Parameter MUSIC POLLUTANT LOAD
REDUCTION REDUCTION
RESULT TARGETS
(Source: SPP 2017)
Flow 1.4%
Total Suspended Solids 84% 80%
Total Phosphorous 60% 60%
Total Nitrogen 45% 45%
Gross Pollutants >5mm 99% 90%
15
2001 Lower Mill Carpark Extension SWMP February 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment D - Stormwater and Water Quality report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.