Project Monitoring
Photographs will be taken of the site at times prior to, during and following the construction period and
supplied to the responsible authority on request to demonstrate compliance with the SEMP. Progress
reports and photographic recordings are to be taken from locations determined by Site Supervisor and
Project Manager.
Declaration
I agree to ensure that:
All site and environmental protection measures outlined within the approved SEMP will be adhered
to.
All endorsed plans will be adhered to.
All site rehabilitation and revegetation works will be undertaken in accordance with the approved
SEMP.
Prior to construction personnel commencing work, the site supervisor will ensure:
An appropriate site induction has been undertaken
Equipment/Plant will be serviced off-site.
All equipment will be cleaned and free of vegetation, soil and seed prior to being brought on to the
site.
Advice will be obtained from the ‘Dial Before You Dig’ service to determine the location of existing
services onsite.
Kate Seehuusen
Full Name Signature
Date: 02/02/2026
P.O. Box 320, Eudlo E. [email protected]
Queensland, 4554, P. 0408 011 584 | ABN 18 766 198 454
Australia www.biodiverse-environmental.com.au
FLORA | FAUNA | REHABILITATION | FIRE | WATER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Construction Management Plan OPW25-0206.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.