Council archive · source document
SUPERSEDED 51983.3225.06 - Change to an Existing Approval
Officer: Denis Wallace
Direct Telephone: 07 53296239
Our Reference: 51983.3225.06
Your Reference: n/a
12 May 2016
Mr GJ Proos, H Proos
C/- RG Strategic
PO Box 1363
NOOSA HEADS QLD 4567
Dear Sir/Madam
Change to an Existing Approval
Sustainable Planning Act 2009
I refer to your request to make a permissible change to an existing approval. On
12 May 2016, Council decided your requested changes.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 51983.3225.06
Street Address: 30 Hastings St Noosa Heads Qld 4567
The Hastings 15/30 Hastings St Noosa Heads Qld 4567
Real Property Description: Lot 15 GTP 1154
Planning Scheme: The Noosa Plan (16 September 2013)
2 DECISION DETAILS
Council in October 1983 decided to issue the following type of approval:
Town Planning Consent Permit for Multiple Dwelling 25 Units, 8 Shops
In relation to a request to make a change to the existing approval, Council on 15 June 2006
decided to:
A. Approve a change to the development approval subject to additional conditions.
In relation to a request to make a change to the existing approval, Council on
11 November 2014 decided to:
A. Approve a change to the development approval subject to additional conditions
In relation to a request to make a change to the existing approval, Council on 12 October 2015
decided to:
A. Agree to change condition 2.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
51983.3225.06
In relation to a request to make a change to the existing approval, Council on 17 March 2016
decided to:
A. Agree to change Condition 2.
In relation to a request to make a change to the existing approval, Council on 12 May 2016
decided to:
A. Approve to a change the development approval (Redevelopment of Unit 15).
B. Include additional conditions relating to the change (Conditions 6 – 15).
3 RELEVANT PERIOD OF APPROVAL
Not Applicable
4 CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
To be read in conjunction with previous approval TPC 1632
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan, prepared by Date
No. 1 Perspectives & Notes, prepared by 22/07/2014
Accolade Building Designs
No. 3 Ground Floor & 1st Level, prepared by 22/07/2014
Accolade Building Designs
No. 4 Elevations, prepared by Accolade 22/07/2014
Building Designs
Approved Plans – October 2015
DA 3001 A Site Plan, prepared by Peter Hull Sept 15
Architect
DA 3002 B Floor Plans, prepared by Peter Hull Sept 15
Architect
DA 3004 A Ground Floor and Carport Plan, prepared Sept 15
by Peter Hull Architect
DA 4001 B Sections, prepared by Peter Hull Sept 15
Architect
DA 5001 B Elevations, prepared by Peter Hull Sept 15
Architect
Page 2 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 3
51983.3225.06
Approved Plans – March 2016
- - GRND FLR – Proposed (Unit 14), 14/10/2015
prepared by LPID
- - Elevation (Unit 14) – East Facing (Street 14/10/2015
Frontage), prepared by LPID
- - Elevation – North Facing (Unit 14), 14/10/2015
prepared by LPID
- - Elevation – South Facing (Unit 14), 14/10/2015
prepared by LPID
- - Elevation – West Facing (Unit 14), 14/10/2015
prepared by LPID
- - 3D Views – Exterior (Unit 14), prepared 14/10/2015
by LPID
- - GRND FLR – Proposed (Unit 25), 14/10/2015
prepared by LPID
Elevation (Unit 25) – South View, 14/10/2015
prepared by LPID
Elevation – East (Unit 25), prepared by 14/10/2015
LPID
Elevation – West (Unit 25), prepared by 14/10/2015
LPID
Elevation – North (Unit 25), prepared by 14/10/2015
LPID
3D Views – Exterior (Unit 25), prepared 14/10/2015
by LPID
3. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.
Nature and Extent of Approved Use
4. The area between the entry and store room must remain open (no wall) in accordance
with the approved plans
Building Appearance
5. All deck and balcony areas above ground floor must not be enclosed by permanent
fixtures such as shutters, louvres, glass panelling or the like.
Additional Conditions for Permissible Change 51983.3225.06 (Redevelopment of Unit
15) 12 May 2016
6. Redevelopment of Unit 15 undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Page 3 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 4
51983.3225.06
Approved Plans for Unit 15 Redevelopment
Plan No. Rev. Plan, prepared by Date
DA.01 B Location Plan prepared by Bark Design Architects 26/02/2016
DA.02 C Site Plan prepared by Bark Design Architects 23/02/2016
DA.04 C Ground Floor Plan prepared by Bark Design Architects 23/02/2016
DA.05 C First Floor Plan prepared by Bark Design Architects 23/02/2016
DA.06 C Second Floor Plan prepared by Bark Design Architects 23/02/2016
DA.07 C Roof Terrace Plan prepared by Bark Design Architects 23/02/2016
DA.11 B South Elevation prepared by Bark Design Architects 26/02/2016
DA.12 B East Elevation prepared by Bark Design Architects 26/02/2016
DA.13 B North Elevation prepared by Bark Design Architects 26/02/2016
DA.14 B West Elevation prepared by Bark Design Architects 26/02/2016
Additional Privacy Screening
7. Additional privacy screening must be provided to the dwelling’s deck areas, as follows:
a. Screening to the western side of the 1st floor deck (to protect the privacy of Unit
16 The Hastings); &
b. Screening to the northern side and the northern half of the eastern side of the 2nd
floor deck (to protect the privacy of the Sebel units).
Existing Vegetation
8. Existing trees on the site and within road reserves must be retained, except where
required to be removed to accommodate the approved dwelling.
9. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
d. using low impact construction techniques around vegetation.
Construction Management Plan & Pre-Start Meeting
10. A Construction Management Plan must be submitted to and approved by Council prior
to obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site
for pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with
the proposed construction works that need to be onsite or in proximity to the
Page 4 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 5
51983.3225.06
site at any time during the phases of the construction works. Where
relevant, time slots and off-peak hours should be indicated. All efforts must
be made to prevent or minimise adverse impact on public parking availability
in the local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the
final Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
e. Protection fencing for existing landscaping and trees in proximity to the work
activities.
f. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures to prevent silt and contaminants from entering existing
stormwater system.
g. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues.
h. identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a pre-start meeting. The contact number to arrange a pre-start meeting is Leigh
Crighton on ph.53296547. The pre-start meeting must include:
a. The relevant parties for any Civil Engineering and Building works.
b. A representative of the Body Cooperate.
The applicant must provide copies of the approved construction and traffic
management plans for the attendees at the prestart meeting.
Frontage Condition Report
12. A condition report including photographs of the frontage of the site must be completed
and submitted to council at the prestart meeting and prior to any works commencing.
General Requirements
13. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
14. The developer must meet any costs to repair damage to any Council asset during
construction where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must be
repaired immediately on completion of the works associated with the development.
Page 5 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 6
51983.3225.06
Performance Bond
15. Security in the form of a cash bond or trading bank guarantee to the sum of $3,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
pre-start meeting. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
5 REFERRAL AGENCY CONDITIONS
Not Applicable
6 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code - Building Code of Australia (Volume
1) as they relate to people with disabilities. Your attention is also directed to the fact that
in addition to the requirements of the National Construction Code as they relate to
people with disabilities, one or more of the following may impact on the proposed
building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards
Aboriginal Cultural Heritage Act 2003
2. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply
with the duty of care. Substantial monetary penalties may apply to individuals or
corporations breaching this duty of care. Injunctions may also be issued by the Land
and Resources Tribunal, and the Minister administering the Act can also issue stop
orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the
cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
Infrastructure Charges (Unit 15 Redevelopment)
This Development Permit to change the existing approval for the redevelopment of Unit
15 will trigger an “Infrastructure Charge Notice” to be issued in accordance with
Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009
and in conjunction with the State Planning Regulatory Provision (adopted charges).
7 PROPERTY NOTES
Not Applicable
Page 6 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 7
51983.3225.06
8 PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable
9 FURTHER DEVELOPMENT PERMITS REQUIRED
Development Permit for Building Work
10 SELF ASSESSABLE CODES
Not Applicable
11 SUBMISSIONS
Not Applicable
12 REASONS / GROUNDS FOR APPOVAL
Not Applicable
13 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.
14 OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies of which are
available on line at www.noosa.qld.gov.au, or at Council offices.
DECISION NOTICE HISTORY
Original Decision Notice (October 1983)
Change to Existing Approval – Unit 1(15 June 2006)
Change to Existing Approval – Unit 22 (11 November 2014)
Change to Existing Approval – Unit 11 (12 October 2015)
Change to Existing Approval – Unit 14 & 25 (17 March 2016)
Change to Existing Approval – Unit 15 (12 May 2016)
Yours faithfully
Denis Wallace
Coordinator - Planning
Encl. Infrastructure Charge Notice
Approved Plans/Documents
Appeal Rights
cc Unitywater
Page 7 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Page 8
51983.3225.06
Appeal Rights
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
The following is an extract from the Sustainable
Planning Act 2009 (Chapter 7)
466 Appeals about decisions relating to
permissible changes
(1) For a development approval given for a
development application, the following persons
may appeal to the court against a decision on a
request to make a permissible change to the
approval—
(a) if the responsible entity for making the
change is the assessment manager for
the application—
(i) the person who made the
request; or
(ii) an entity that gave a notice
under section 373 or a pre-
request response notice about
the request;
(b) if the responsible entity for making the
change is a concurrence agency for the
application—the person who made the
request.
(2) The appeal must be started within 20 business
days after the day the person is given notice of
the decision on the request under section 376.
(3) Also, a person who has made a request under
section 369 may appeal to the court against a
deemed refusal of the request.
(4) An appeal under subsection (3) may be started at
any time after the last day the decision on the
matter should have been made.
Page 8 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
Used in these records
SUPERSEDED 51983.3225.06 - Change to an Existing ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 242 KB (small file)
- File type
No other editions are linked here.