Skip to the record
Every meeting, every word.

Original source · versioned page text

DAForm1-Developmentapplicationdetails

of 12

Page text shows just the words. Original shows the document exactly as it was published.

       11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
           parts?
        Intended use of parts created             Residential              Commercial              Industrial              Other, please specify:


        Number of parts created

        12) Boundary realignment
        12.1) What are the current and proposed areas for each lot comprising the premises?
                                       Current lot                                                              Proposed lot
        Lot on plan description              Area (m2)                             Lot on plan description              Area (m2)



        12.2) What is the reason for the boundary realignment?



        13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
        (attach schedule if there are more than two easements)
        Existing or               Width (m)          Length (m)      Purpose of the easement? (e.g.                    Identify the land/lot(s)
        proposed?                                                    pedestrian access)                                benefitted by the easement




     Division 3 – Operational work
     Note: This division is only required to be completed if any part of the development application involves operational work.
        14.1) What is the nature of the operational work?
            Road work                                                Stormwater                            Water infrastructure
            Drainage work                                            Earthworks                            Sewage infrastructure
            Landscaping                                              Signage                               Clearing vegetation
            Other – please specify:               Driveway Crossover
        14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
            Yes – specify number of new lots:                     1 existing lot, 1 new lot
            No
        14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
        $15,000

     PART 4 – ASSESSMENT MANAGER DETAILS

        15) Identify the assessment manager(s) who will be assessing this development application
        Noosa Shire Council
        16) Has the local government agreed to apply a superseded planning scheme for this development application?
            Yes – a copy of the decision notice is attached to this development application
            The local government is taken to have agreed to the superseded planning scheme request – relevant documents
            attached
            No




                                                                                                                                                   Page 5
                                                                                                                DA Form 1 – Development application details
                                                                                                                         Version 1.3— 28 September 2020
Document Set ID: 22460171
Version: 1, Version Date: 13/06/2023
Log in to download the original file

DAForm1-Developmentapplicationdetails.pdf · 193 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.