Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-06-23 Planning & Organisation Committee Meeting Agenda

of 123

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                          AGENDA


   Planning & Organisation
     Committee Meeting


                 Tuesday, 23 June 2015


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Noel Playford, Tony Wellington, Frank Wilkie




    “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2015-06-23 Planning & Organisation Committee Meeting Agenda(PDF, 12MB).pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 95 (of 123)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                     23 JUNE 2015


TABLE OF CONTENTS

ITEM                                                                        PAGE
ATTENDANCE & APOLOGIES                                                           -
PRESENTATIONS                                                                    -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                    3
Building & Plumbing Services                                                    3
1      BUILDING & PLUMBING - UPDATE REPORT TO 31 MAY 2015                        3
DA Planning & Environment                                                       8
2      ENVIRONMENTAL OFFSET LEGISLATION OVERVIEW                                 8
3      REQUEST TO CHANGE CONDITIONS OF AN EXISTING MATERIAL CHANGE
       OF USE APPROVAL FOR A MIXED USE DEVELOPMENT AT 90 GOODCHAP
       STREET, NOOSAVILLE (07/0012)                                            14
4      DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
       ANIMAL HUSBANDRY TYPE 1 (AQUACULTURE) AT 15 PRODUCTION ST,
       NOOSAVILLE (MCU14/0096)                                                 33
5      APPLICATION TO RECONFIGURE 1 LOT INTO 2 LOTS AT 38 PAVILION
       STREET, POMONA REC15/0010                                               42
6      APPLICATION FOR A CONCURRENCE AGENCY RESPONSE FOR A
       DETACHED HOUSE AT 1 OVERTON WAY, KIN KIN RAP15/0008                     51
7      DEVELOPMENT ASSESSMENT - UPDATE REPORT TO 31 MAY 2015                   68
CORPORATE SERVICES DEPARTMENT REPORTS                                          76
Finance                                                                        76
8      MAY 2015 FINANCIAL PERFORMANCE REPORT                                   76
9      MARCH 2015 QUARTERLY BUDGET REVIEW REPORT                               87
Procurement and Fleet                                                         105
10     FLEET MANAGEMENT - UPDATE REPORT TO 31 MAY 2015                        105
Property and Facilities                                                       109
11     NOOSA HOLIDAY PARK AND CAMPGROUNDS - UPDATE REPORT TO 31 MAY
       2015                                                                   109
EXECUTIVE OFFICE REPORTS                                                      112
Governance                                                                    112
12     FRAUD AND CORRUPTION FRAMEWORK POLICY AND BUSINESS
       CONTINUITY MANAGEMENT POLICY                                           112
CLOSED SESSION                                                             -




                                                                     Page 2 of 123

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                      23 JUNE 2015


PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

Building & Plumbing Services
1                       BUILDING & PLUMBING - UPDATE REPORT TO 31 MAY 2015
OCUMENT INFORM AT ION




Author                             Building and Plumbing Manager, Allan Hazell
                                   Planning and Infrastructure

Index                              ECM / Subject / Plumbing Management

Attachments                        Nil


EXECUTIVE SUMMARY
Not applicable.


RECOMMENDATION
That Council note the report by the Building and Plumbing Manager to the Planning &
Organisation Committee Meeting dated 23 June 2015 providing an update on the activities
of the Building and Plumbing Branch for the period ending 31 May 2015.


REPORT
The purpose of this report is to inform Council of the Branch activities for the financial period
1 July 2014 to the 31 May 2015.

The Building and Plumbing Branch has the responsibility for regulatory and statutory
compliance of building and plumbing applications, plumbing and electrical maintenance of
Council owned buildings and infrastructure, allocated capital works projects and other
operational cost saving projects related to plumbing, electrical and building services.

1.                      BRANCH OBJECTIVES

The objectives of the Building and Plumbing Branch are:

                      To deliver core building and plumbing regulatory and statutory obligations;
                      To provide cost effective plumbing and electrical maintenance services for Council
                        facilities and other infrastructure;
                      To provide building inspection and asset management support for Council owned
                        buildings;
                      To project manage relevant capital works activities and;
                      To meet financial targets with respect to revenue and expenditure.

This report presents the Branch functions and activities as three components; core functions
(building and plumbing applications); plumbing and electrical maintenance; and capital works
projects.



                                                                                                      Page 3 of 123

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            23 JUNE 2015


2.    Building and Plumbing Core Activities
During 2014/15 there has been an increase of 15% in plumbing applications compared to
the previous year. However, whilst there has been an increase in applications, this has not
been reflected in a similar increase in revenue from fees and charges. This is primarily due
to the majority of applications received being residential applications which attract a lower
fee than commercial applications. The original budget estimates included a higher level of
commercial applications being received and it is difficult to predict the type and quantity of
applications received during the year.
The following table provides an analysis of the ‘Core Activities’ for the period 1 July 2014 to
31 May 2015.

Building and Plumbing Budget 2014/ 2015 – Core Activities
                                $ Current   $ Forecast        YTD $               YTD $         YTD $
                                  Budget       Budget        Actuals     Current Budget       Variance
Employee Benefits                 753,300      753,300       714,673             685,488      (29,185)
Management                        121,670      121,670       132,182             112,271      (19,911)
Materials and Services             12,900       12,900         12,155             11,846         (309)
Total Expenditure                 887,870      887,870       859,010             809,605      (49,405)
Total Revenue                   1,070,531    1,070,531     1,073,060           1,005,472        67,588
NET OPERATIONAL                   182,661      182,661       214,050             195,867        18,183
PROFIT/(LOSS)
Corporate Overheads/ Fleet        387,295      387,295       355,021             355,021               0
NET PROFIT/(LOSS)               (204,634)     (204,634)     (140,971)           (159,154)       18,183
As can be seen by the above analysis, the net position demonstrates that the Branch has
improved on its financial targets with respect to ‘Core Activities’. It should also be noted that
the above expenditure includes Customer Service Obligation costs of approximately
$270,000 reflecting the provision of general advice and management of complaints by
customers which do not attract any fee revenue.
The table below provides a more detailed analysis of ‘Core Activities’ based on a functional
assessment of services provided to date.

Function/Activity                               Works Completed
Plumbing Applications Assessment/ Approvals     430 approvals issued
Building Application and Lodgement              1094 approvals issued
Regulated Plumbing Inspections                  1936 plumbing inspections
Minor Plumbing Applications                     112 minor works applications
Backflow Prevention Devices Registered          2898
On-site Registered                              4069 data entries with 350 letters sent to residents
On – site Facilities Audits                     109 audit inspections
Unitywater - Septic sewer changeover            26 design and inspections
Building and Plumbing Searches Completed        1585 applications
Notifiable Works Audits                         140 audit inspections
Compliance/ Investigations & Customer           248 requests completed
Request Received (current applications)
Building and Plumbing File retrievals           436 plan retrieval requests



                                                                                            Page 4 of 123

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          23 JUNE 2015


3.    Plumbing and Electrical Maintenance Programs

The tables below reflect maintenance works delivered during the 2014/2015 financial year.
All works undertaken have been delivered within expected timeframes and within budget
targets.

The following tables identifies savings achieved as at 31 May 2015 for plumbing
maintenance

Plumbing Reactive and Preventative Maintenance Salaries & Materials 2014/2015
Function/Activity                          YTD                           YTD                     YTD
                                         Current                    Actuals                   Variance
                                         Budget
Reactive and Preventative             $172,500                    $160,796                    $11,704
Maintenance
                                                                                      (under budget)
Plumbing Reactive and Preventative Maintenance Programs – 2014/2015
Function Activity                                  Works Completed                 $ Value of Works
Reactive Maintenance (in-house)                    627 requests completed                     $90,743
Preventative Maintenance (in-house)                1037 audits inspections                    $21,326
Reactive Maintenance (contractors)                 104 request completed                      $38,455
Preventative Maintenance (contractors)             49 audits completed                        $10,245
Total work orders completed 2014/2015              1,817 requests and inspections completed


Savings have also been identified in the provision of electrical services. The 2013/2014
electrical contractor budget for the Noosa region for 12 months (incorporating figures from
Sunshine Coast Council budget) was $335,032 compared to $282,236 expenditure up to 31
May 2015.

This saving of $52,796 of electrical contractor works has been undertaken by Council’s in
house electrician. As this position commenced on the 23/02/2015 the total employee and
material cost to date is $38,045. It can therefore be seen that a saving of $14,751.40 has
been achieved to date through undertaking work in-house that had previously been
outsourced.

Electrical Reactive Maintenance Program – 30/06/2014 to 31/05/2015
Function/ Activity                                      Council Electrician      External Contractor
Work Orders Completed 31/05/14 to 23/02/15                                   0                    278
Work Orders Completed 23/02/15 to 31/05/15                                 88                     137
Total works completed 2014/2015                             88 work orders          415 work orders

The above table identifies work orders undertaken by contractor over this 11 month period
and work orders completed by the in house Council electrician.




                                                                                          Page 5 of 123

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        23 JUNE 2015


4.    Capital Works and Specific Projects

With respect to plumbing capital works projects undertaken, existing staffing levels have not
altered for the delivery of activities to meet project outcomes, additionally, a large amount of
work was provided in the Team’s own time out of normal office hours.

Capital Works Program Delivery – all projects completed
                                                         Approved       Project Final     Budget
                                                      Capital Works          Budget      Savings
                                                             Budget        Costing’s
Council Wilderness Camp, North Shore -                       $60,000         $47,000     $13,000
Wastewater Treatment Plant
Noosaville Library, Leisure Centre and Respite               $40,000         $26,000     $14,000
Centre - Stormwater and sewer refurbishment
Noosaville Depot - Emergency Generator Installation          $60,000         $36,000     $24,000
Boreen Point Caravan Park - Amenities Block                  $60,000         $57,000      $3,000



Other Project Works Undertaken                                               Budget      Savings
Drainage Rectification Noosa River Caravan Park                              $32,000      $2,500
Tag and Testing Program of Council Owned Buildings (annual ongoing            $7,875      $7,875
saving)                                                                                  ongoing

                                                                                         $12,610
Rationalisation of Councils Existing Water Meters – stage 1 completed        $20,410
                                                                                         ongoing
(annual ongoing saving)
Replacement Program of faulty Fire Exit Signs                              $7,626.25      $2,768
                                                                                          $6,000
Testing Of Council Owned Backflow Prevention Devices (annual                 $14,000
                                                                                         ongoing
ongoing saving)
Total 2014/15 savings (some of these will be ongoing)                                    $31,753

Savings identified in the table above have been achieved by Council staff undertaking all
works from project management, installing and direct sourcing of materials.

5.    Future Direction

Further development of this report will be undertaken during the next financial year and will
be considered during the planned service and system review. This review will be completed
by November 2015 with recommendations put forward for consideration.

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Nil




                                                                                        Page 6 of 123

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            23 JUNE 2015


Departments/Sections Consulted:

   Community Services                   X   Planning & Infrastructure
   Disaster Management & Public Order       Building & Plumbing Services
   Waste & Environmental Health             DA Planning
   Community Facilities                     Strategic Land Use Planning
   Cultural Facilities                      Asset Design & Investigations
                                        X   Asset Planning
                                            Civil Operations
                                            Environment

   Executive Office                     X   Corporate Services
   Community Engagement                 X   Finance
   Customer Service                         ICT
   Executive Support                        Procurement & Fleet
   Governance                           X   Property & Facilities
   Human Resources                          Revenue Services




                                                                            Page 7 of 123

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     23 JUNE 2015


DA Planning & Environment
2                        ENVIRONMENTAL OFFSET LEGISLATION OVERVIEW
DOCUMENT INFORM AT ION




Author                              Environment Officer, Conor Neville
                                    Planning & Infrastructure Department

Index                               ECM/Subject/Noosa Plan Planning Scheme
                                    ECM/Subject/Environment And Biodiversity Policy

Attachments                         Nil


EXECUTIVE SUMMARY
Not applicable

RECOMMENDATION
That Council note the report by the Environment Officer to the Planning & Organisation
Committee Meeting dated 23 June 2015 and;
A.                       Request staff meet with the Department of Transport and Main Roads to seek that the
                         koala offset plantings associated with the Bruce Highway upgrade clearing in Noosa
                         Shire, be wholly and strategically located within the Noosa Shire, and report back to a
                         future Planning and Organisation Committee Meeting; and
B.                       Request that the Environmental Services staff:
                         1.   Identify potential Strategic Offset Investment Corridors in Noosa Shire for
                              inclusion into the new planning scheme;
                         2.   Develop a register of landholder interest;
                         3.   Investigate options for securing land for the purpose of providing advanced
                              offsets in conjunction with the Environment Levy Working Group;
                         4.   Investigate incorporating Matters of Local Environmental Significance into the
                              new planning scheme; and
                         5.   Present recommendations to a future meeting of Council.

REPORT
This report provides an overview of the recently introduced Queensland Government
Environmental Offsets Act 2014 and associated regulations and policy. On 1 July 2014 the
Environment Offset Act 2014 (the EO Act) commenced in Queensland providing a single
legal framework for environment–related offsets. The Act replaces previous legal offset
mechanisms that dealt with a variety of environmental matters requiring offsets.

1.                       PURPOSE OF THE ENVIRONMENTAL OFFSETS ACT 2014
The main purpose of the Act is to counterbalance the significant residual impacts of
particular activities on prescribed environmental matters through the use of offsets. A
significant residual impact is defined by the Act as an adverse impact, whether direct or
indirect, of a prescribed activity on all or part of a prescribed environmental matter that will
remain and is significant. A prescribed activity is an activity that is authorised under another
Act, for which an offset condition can be imposed and prescribed under a regulation. A
prescribed environmental matter is defined in Section 2.



                                                                                                      Page 8 of 123

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


The Queensland Environmental Offset Policy replaces the following offset policies:
    Queensland Government Environmental Offset Policy
    Policy for Vegetation Management Offsets
    Queensland Biodiversity Offset Policy
    Marine Fish Habitat Offsets Policy
    Offsets for Net Gain of Koala Habitat in Southeast Queensland Policy
The Act aims to incorporate all previous offset policies under one head of power, thus
proving a clear and executable offset framework. The framework consists of
    the Act,
    Environmental Offsets Regulation 2014,
    Environmental Offsets (Transition) Regulation 2014 (expires 1 July 2015) and
    Queensland Environmental Offset Policy.

2.    OPERATION OF THE ENVIRONMENTAL OFFSETS ACT 2014
Existing legislation continues to provide assessment requirements for when an offset is
required, including the Sustainable Planning Act, the Nature Conservation Act,
Environmental Protection Act and Marine Parks Act. These acts have been amended to
reference the new EO Act.
The EO Act provides the framework for what an offset is and how it is delivered. It identifies
the legal security mechanisms that may be used and provides a single head of power for the
supporting regulation and policy.
The EO Act allows the administrating authority to impose a condition for a prescribed activity
that impacts on a prescribed environmental matter.
Prescribed activities and prescribed environmental matters are identified through the
Environmental Offsets Regulation (Regulation). These activities are the type of works that
are regulated and these matters are the things that the Act seeks to mitigate impacts upon.
The prescribed activities are:
    Resources activities under the Environment Protection Act
    Prescribed ERA’s under the Environment Protection Act
    Works in a marine park
    An activity in a protected area under the Nature Conservation Act (NCA)
    Clearing of protected plants under the NCA
    Development for which an environmental offset may be required under the Sustainable
      Development Assessment Provisions
    Development under a local planning instrument or under the State Planning Policy
      (Part E)
Prescribed environmental matters are matters identified by the Commonwealth, State or
Local Government.
Commonwealth
Matters of National Environmental Significance (MNES) are protected under the
Environment Protection and Biodiversity Conservation Act 1999 and include:
    World heritage
    National Heritage
    Ramsar
    Listed threatened species and ecological communities
    Migratory species
    Commonwealth marine areas
    Water resources

                                                                                     Page 9 of 123

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


State
Matters of State Environmental Significance (MSES) include:
   Regulated vegetation (includes mapped essential habitat, “of concern” and
     “endangered” regional ecosystems)
   Connectivity
   Wetlands and waterways
   Wildlife Habitat
   Protected areas
   Marine Park Zones
   Fish Habitat Areas
   Fish passage
   Marine Plants
   Legally secure offset areas
Local
Matters of Local Environmental Significance (MLES) are environmental matters identified
within a local planning scheme or planning policy. For the purposes of the EO Act, Matters of
Local Environmental Significance cannot be the same as Matters of National Environmental
Significance or Matters of State Environmental Significance.
Local government may only impose offset conditions through the local planning scheme for
matters identified as Matters of Local Environmental Significance, as assessment manager
for the purposes of the State Planning Policy and for the SEQ Koala Conservation Planning
Regulatory Provisions. There is an opportunity to develop Matters of Local Environmental
Significance and have them identified in the new planning scheme.
Environmental Offsets (Transition) Regulation 2014, which expires 1 July 2015, effectively
amends the South East Queensland Koala Conservation State Planning Regulatory
Provisions by reducing the amount of offset planting required. Previously an offset of 5 koala
habitat trees were required to be planted to offset the removal of 1 koala habitat tree. The
current regulation amends this ratio to 3 planted to offset 1 koala habitat tree removed.
3.      DELIVERY OF ENVIRONMENTAL OFFSETS
Environmental offsets are required to achieve a conservation outcome for the impacted
matter to maintain the viability of the impacted matter, relative to the undeveloped and “un-
offsetted” scenario. There are three types of offset delivery mechanisms being proponent –
driven, financial settlement or a combination of the previous two mechanisms. The
proponent must apply to the administrating agency, being either State or Council depending
on the matter, for the agreement to the proposed offset delivery approach, via a notice of
election.
3.1     Proponent – driven Offset
This delivery mechanism can take the form of a land-based offset, delivery through a Direct
Benefit Management Plan (DBMP) or a combination of both. The proponent must submit for
approval an offset delivery plan to the administrating agency.
Land-based offsets are not to exceed 4 times the area of the residual impact and must be
legally secured for the duration of the approved offset delivery plan. An area of land can be
legally secured under the EO Act by declaring it as Environmental Offset Protection Area.
A Direct Benefit Management Plan is described in an approved offset delivery plan and may
include enhancing, restoring and establishing key habitats across multiple tenures, threat
mitigation such as weed or feral animal control across multiple tenures, landscape scale fire
management activities, establishment and management of threatened fauna species or
planting of threatened plant species. A Direct Benefit Management Plan must be approved
by Department of Environment and Heritage Protection (DEHP) where the matter is of State
or Commonwealth interest and by local government for Matters of Local Environmental
Significance.

                                                                                  Page 10 of 123

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    23 JUNE 2015


3.2   Financial Settlement Offset
A financial settlement offset is a payment for a significant residual impact on prescribed
environmental matter/s. It must be calculated in accordance with the Financial Settlement
Offset Calculation Methodology. This methodology has been incorporated into a web-based
calculator which is available on Department of Environment and Heritage Protection website.
If a financial settlement offset is for a Matter of Local Environmental Significance, local
government can only require a payment no greater than what would be required by the
Financial Settlement Offset Calculation Methodology and local government is able to deliver
the conservation outcome the financial settlement seeks to offset.
3.4   Combination Offset
A combination of the financial settlement offset and proponent-driven offset may be used to
satisfy the offsetting requirements of the EO Act.

4.    THE NOOSA EXPERIENCE
Council, as assessment manager, has received an offset financial contribution in accordance
with the Offsets for Net Gain of Koala Habitat in SEQ for the loss of mature koala habitat
trees at the resort development site at Settler’s Cove. A total of $44,160 was received from
the developer following a request to extend the currency of their development approval.
Officers are investigating the expenditure of these funds in accordance with the policy intent,
that is, to establish new koala habitat. The land required for planting of new koala habitat is
being explored at the Cooroibah air strip site, Girraween lands and within Council existing
reserves.
The clearing of remnant vegetation at Attunga Heights for development was required to be
offset. The applicant negotiated with the adjacent landholder at Viridian to provide the offset
on their land. The offset was for the restoration to remnant status of a patch of vegetation at
Viridian. This offset is protected by environmental covenant.
Clearing of an endangered regional ecosystem for the expansion of the Noosa Eumundi
Road refuse station required the provision of an offset on a “like for like” basis. Council
provided this offset by planting and enhancing endangered vegetation around Lake
Macdonald.
The Cooroy to Curra Bruce Highway upgrade has resulted in the clearing of koala habitat.
The Department of Main Roads and Transport is responsible for the provision of offsets to
discharge their obligations. Council has had limited involvement in this project however it is
noted the clearing that has occurred in Noosa Shire is proposed to be offset in Gympie
Regional Council area adjacent to the highway. Tender documents released state:
This Supplementary Specification applies to the supply and installation of koala habitat trees
to discharge the department’s offsetting obligations under the Department of Environment
and Heritage Protection’s (EHP) Offsets for Net Gain of Koala Habitat in South East
Queensland Policy (the Koala Offsets Policy). The offsetting obligations address impacts to
non-juvenile koala habitat trees (KHT) associated with the Bruce Highway (Cooroy to Curra)
Upgrade – Section A. The offset sites associated with this contract are located within the
Gympie local government areas (Tender document Section 1.1 of 7.2 PA094CP.doc –
underline added)
Section A designates the Cooroy interchange to Sankeys Road, located within the Noosa
Shire. The Offset receiving site is located adjacent to the new section B of the Bruce
Highway. The receiving site is located outside of the Koala Regulatory Mapping Extent.




                                                                                   Page 11 of 123

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       23 JUNE 2015


Section 5 of Offsets for Net Gain of Koala Habitat in South East Queensland Policy require:
    The koala offset site must be within the same local government area as the
      development impacting on koala habitat values,
    Where an area of high value or medium value suitable for rehabilitation habitat is not
      available within the area required by provisions below, koala offset sites should be
      located within low value suitable for rehabilitation habitat, or where appropriate, within
      bushland habitat to enhance the quality of bushland within the local government area.
    Koala offset sites should form part of, or contribute to, strategic koala habitat networks
      within the local government area or the South East Queensland region (as
      appropriate).
The provision of offsets within the Gympie local government contravenes these requirements
as the receiving site is not in South East Queensland and not within the local government
area of impact.
Future clearing of vegetation within the shire for the provision of community infrastructure
such as power line corridors, communication infrastructure and other utilities is likely to result
in the provision of environmental offsets within the shire.

5.    PLANNING CONSIDERATIONS
Strategic Offset Investment Corridors
The EO Act allows for the identification of Strategic Offset Investment Corridors. These are
areas which are pre-identified to contain Matters of National Environmental Significance
and/or Matters of State Environmental Significance, connect conservation areas and are
subject to low development pressure. Landholder involvement is voluntary. The identification
of Strategic Offset Investment Corridors is designed to make offset delivery more cost
effective and easier to find. Proponents are expected to seek offset opportunities within
these corridors where possible.
There is opportunity for Council to identify Strategic Offset Investment Corridors in its local
government area that identify state and national interests as well as including Matters of
Local Environmental Significance. The development of the new planning scheme will identify
potential Strategic Offset Investment Corridors for public consultation. Landholder
involvement is voluntary in Strategic Offset Investment Corridors; however there is an
opportunity for landholders to register their interest in participating in Strategic Offset
Investment Corridors in order to facilitate the timely delivery of offsets.
Advanced offsets
An advanced offset is an area of land that has been identified and registered under section
14 of the Environmental Offsets Regulation 2014 as an advanced offset. Advanced offsets
may be used as an offset to compensate for a future significant residual impact on one or
more prescribed environmental matters. Advanced offsets are promoted as providing a
means to better manage the risks associated with the time delay in finding a suitable offset
site and realising the conservation outcome for the prescribed environmental matters on that
site. Advanced offsets within a Strategic Offset Investment Corridor are also encouraged
because they will provide a landscape outcome for the prescribed environmental matter.
Advanced offsets may be used to create connectivity between core habitat areas.
There is an opportunity for Council to also consider advanced offsets, this may be achieved
by purchasing land in strategic offset investment corridors, establishing, managing and
securing vegetation plantings and promoting the advanced offsets to potential clients. This
investigation would be undertaken by the Environment Services staff.




                                                                                      Page 12 of 123

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


Offset Register
The EO Act requires administering agencies to maintain and make available for inspection a
Register of Offsets. The register must record information in relation to each offset condition
imposed on a development, including the type of the offset, the matter being offset and its
location and any legally secured offset areas.
Previous Council Consideration
Koala Habitat Protection – Noosa Plan Amendments, a report by Strategic Land Use
Planning, Planning and Organisation Committee Agenda 26 May 2015.
Finance & Risk
The availability of land within the urban area to provide environmental offsets as close as
possible to the area of impact is a risk. Land within the urban area attracts a premium price
relative to non-urban land and the provision of land based environmental offsets could be
cost prohibitive.
Time delays in the identification of strategic offset investment corridors and the incorporation
of these identified corridors into a statutory planning instrument can lead to delivery delays
and non-strategic delivery of environmental offsets.
Land based delivered offsets present a risk that the time lag delay between the clearing of
mature habitat and the creation of new habitat may result in the “matter” becoming locally
extinct. The delivery of land-based offsets in an area not in close proximity to the habitat
impacted upon may also result in local extinctions of the “matter”.
Changes to government policy regarding environmental offsets may have the potential to
impact on the strategic investment in advanced offsets.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Strategic planning

Departments/Sections Consulted:

      Community Services                     x   Planning & Infrastructure
      Disaster Management & Public Order         Building & Plumbing Services
      Waste & Environmental Health           x   DA Planning
      Community Facilities                   x   Strategic Land Use Planning
      Cultural Facilities                        Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment
                                             x
      Executive Office                           Corporate Services
      Community Engagement                       Finance
      Customer Service                           ICT
      Executive Support                          Procurement & Fleet
      Governance                                 Property & Facilities
      Human Resources                            Revenue Services




                                                                                    Page 13 of 123

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                  23 JUNE 2015


3                        REQUEST TO CHANGE CONDITIONS OF AN EXISTING MATERIAL CHANGE OF
                         USE APPROVAL FOR A MIXED USE DEVELOPMENT AT 90 GOODCHAP
                         STREET, NOOSAVILLE (07/0012)
DOCUMENT INFORM AT ION




Author                           Development Planner, Jack Lewis
                                 Planning & Infrastructure Department
Index                            ECM / Application / 132007.12.6
Attachments                      1.   Proposed changes to conditions
                                 2.   Existing and proposed plans
                                 3.   Proposed parking within the Lake Doonella Reserve



         APPLICATION DETAILS

         Applicant                           Noosa Professional and Medical Centre Pty Ltd
         Proposal                            Request to Change Conditions of Approval
         Properly Made Date                  10/11/2014
         No. of Submissions                  No submissions were made to the original application


         PROPERTY DETAILS

         Property Address                    90 Goodchap Street, Noosaville
         RP Description                      Lot 2 SP155870 & Lot 4 SP196846
         Land Area                           1.6867 ha
         Original Approval Type:             Development Permit for Material Change of Use:
                                             -   Commercial Business Type 1 (Office)
                                             -   Commercial Business Type 2 (Medical)
                                             -   Education Type 3 (Adult)
                                             -   Retail Business Type 1 (Local)
                                             -   Retail Business Type 2 (Shop)
                                             -   Entertainment & Dining Business Type 1 (Food &
                                                 Beverage)


         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint
         Locality                            Noosaville
         Zone                                Community Services
         Overlays                            Natural Hazards (Acid Sulfate, Bushfire and Flood)
         Assessment Type                     Change to Existing Approval




                                                                                                  Page 14 of 123

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 26 May 2015 regarding Application No. 132006.12.6 for a Change
to an Existing Approval, situated at 90 Goodchap St, Noosaville and:
A.    Refuse to change conditions 1, 7, 8, 10, 12 and 38;
B.    Agree to delete condition 15; and
C.    Give notice to the property owner to comply with the conditions of the approval and
      that the unapproved works within the Lake Doonella Reserve must be removed and
      reinstated back to its original condition to the reasonable satisfaction of Council within
      6 months.

REPORT
1.    PROPOSAL
The application seeks approval to change conditions of an existing mixed use development
approval at the ‘Noosaville Medical & Professional Centre’ situated at 90 Goodchap Street,
Noosaville.
The proposed changes primarily seek to allow for the expansion of the adult educational use
(Central Queensland University - CQU) within the existing buildings and delete the
requirement for the construction of the multi-storey carpark (which adds a further 79 spaces
onsite). Other requested changes include reduced provision of bicycle facilities and the
specified number of people allowed on-site at any one time. The proposed changes are
reflective of the current mix of uses on site, with the development currently operating in
conflict with the development approval conditions.
A summary of the proposed changes to the existing conditions is included as Attachment 1.
2.    SITE DETAILS
2.1. Site Description
The ‘Noosaville Medical and Professional Centre’ is located on the corner of Eumundi Noosa
Rd and Goodchap St, Noosaville. The site is zoned Community Services and adjoins the
Noosaville Industry zone to the south west, existing residential houses and a Telstra depot to
the north, and Lake Doonella Park Reserve to the west. Access to the site is provided
primarily from Goodchap St, with existing on-site carparking provided within and around the
existing buildings.

A locality plan is included as Figure.1




                                                                                    Page 15 of 123

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                23 JUNE 2015




                                        Figure.1 Locality Plan with zones
2.2. Background
A number of approvals have been issued over the site for the two child care centres,
professional offices, medical centre, pharmacy and associated take away food shop. In
2008, Council issued a consolidated Material Change of Use approval (07/0012), setting
area limits for the various uses on the site.
On the 21 November 2008, Council issued a change to the approval allowing for the
development to be staged. The approved staging plan required a multi-level car park to be
built as part of the final stage (Stage B) for the development. The development details
relating to the approved staging are outlined in Table.1 below:
Table.1 – Details of staging permitted under the existing development approval.
Use Class                                  Stage A                                 Stage B
                                                      2                                           2
Commercial – Type 1 Office                 2,420m                                  *1,368m
                                                      2                                       2
Commercial – Type 2 Medical                3,000m                                  3,000m
                                                  2                                           2
Education – Type 3 Adult                   790m                                    1,600m
                                                  2                                       2
Retail – Type 1 Local                      100m                                    100m
                                                  2                                       2
Retail – Type 2 Shop                       236m                                    236m
                                                      2                                       2
Total Gross Floor Area                     6,304m                                  6,304m
                                                          2                                   2
Total Use Area                             **5,954m                                6,304m
                                           ***316 spaces                           ***393 spaces
Carparks Required                          (253 on-site + 63 ground                (253 on-site + 142 multi storey
                                           level carparks)                         carpark = Total of 395 provided)
* Depending on the split of the other uses, the office component may exceed this amount up to 2,420m2.
** This option utilises a number of smaller tenancies within the building, such that the balance area of 350m 2 will be used as
corridors and not constitute use area.
*** Excludes 40 carparking spaces for the childcare centre.

                                                                                                               Page 16 of 123

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  23 JUNE 2015


3.       STATUTORY PROCESS
The proposed change to the development approval requested by the applicant is determined
to constitute a permissible change in accordance with s367 of the Sustainable Planning Act
2009 on the grounds that:
    The change would not result in a substantially different development because the
      changes do not propose a new use, or works, or apply to a new parcel of land.
    The change would not trigger a new referral to the State Assessment and Referral
      Agency;
    The original application was assessed against The Noosa Plan, with no submissions
      being made at the time. The proposed changes would not likely cause a person to
      make a properly made submission as the changes remain consistent with the
      character of the approved development on the site; and
    The changes do not involve prohibited development.

4.       ASSESSMENT
Central Queensland University (CQU) is currently the largest tenant at the Noosaville
Medical & Professional Centre and is using substantially more of the total floor area than
permitted by the original development approval (see Table.2).

Table.2 – Breakdown of uses currently operating from Noosaville Medical & Professional
Centre.
              Use Class               Actual Use Area        Stage A         Stage B (multi
                                                                             storey carpark)
                                                 2                      2               2
 Commercial – Type 1 Office           1,141m                 2,420m          1,368m
                                                 2                      2
 Commercial – Type 2 Medical          1,869m                 3,000m          3,000m
                                                                                        2

                                                 2                  2                   2
 Education – Type 3 Adult             2,723m                 790m            1,600m
                                             2                      2               2
 Retail – Type 1 Local                100m                   100m            100m
                                             2                      2               2
 Retail – Type 2 Shop                 221m                   236m            236m
                                                 2
 Total                                6,054m                 6,304m
                                                                        2
                                                                             6,304m
                                                                                        2




Applicant’s Request
The application seeks to cater for the University’s needs, without constructing the required
multi storey carpark on the site. In support of the proposal, the applicant describes how
some of the teaching areas are more specialised and don’t cater for a high number of
students at any one time, such as library areas and nurse training theatres.
A carparking survey was also provided with the application to justify the request. The survey
was undertaken between May 2013 and August 2014 and indicates that, of the 315
carparking spaces currently available on the site (excluding the 40 spaces for the childcare
centre), an average of 75% of the spaces were occupied (238), with the August 2014 survey
showing 93% (293) of the on-site spaces occupied. The applicant further submits that an
existing floor plan survey of the buildings estimates the use areas associated with ‘student
contact’ to be around 1,400m2, with the remaining 1,323m2 of the university’s use area
attributed to library/resource rooms, offices and foyers. An online survey was also
undertaken by the applicant of students and staff to determine travel and parking behaviour.
The applicant submits the results of this survey indicate the vast majority of university
students and teachers are dependent on cars to travel to the site, with potential for travel
behaviour change by way of a travel smart action plan.

The applicant submits the surveys justify the proposed changes to the approval and
contends the current use is not causing any off-site parking or traffic impacts on the
surrounding road network.

                                                                                 Page 17 of 123

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


Assessment of Changes
In considering the request for the change under section 374 of the Sustainable Planning Act
2009, Council must have regard to the information included within the request and the
provisions of The Noosa Plan. The existing uses are all identified as consistent uses for the
site and the proposed change to the floor area mix raises no concerns apart from carparking.
During the assessment of the consolidated application (07/0012), Council raised concerns
about future car parking problems for the site. This was due to there being an undersupply of
carparking compared to assessed demand because of the education use car parking rates
adopted by older approvals (1 space per 20m2). Accordingly, the applicant agreed to
increase the rate of car parking on site to 1 space per 10m2 of use area for the additional
education component of the development.
Beard Traffic Engineering was engaged by Council to comment on the requested changes
and the corresponding carparking survey. Council’s consultant acknowledges that, while
some of the courses offered by CQU are almost fully online and others partially online, the
use of individual carparking surveys as a predictor of future parking demand are almost
meaningless. This is because courses or online content change, depending on the
specialised nature of the university and the courses offered at different times, with no
potential for effective monitoring or enforcement. Therefore, in these circumstances, it is
better to require parking provisions based on the use area parameters.
At the previously nominated rates, Beard Traffic Engineering advises the current
development could be reasonably assessed as:

                                        Parking         Rates Parking                 Spaces
                                        Previously Applied    Required
Office – 1,141m2                        1:20                       57 spaces
Medical – 1,869m2                       1:20                       94 spaces
Education – 800m2                       1:20                       40 spaces (prior approval)
Education – 1,923m2                     1:10                       192 spaces
Retail – 321m2                          1:16.7                     19 spaces
TOTAL                                   6,054m2                    402 spaces

Beard Traffic Engineering also advises if the development is assessed generally as a mixed
use development, the design peak parking could be assessed as low as 303 spaces at an
average of 1 space per 20m2.
Based on these figures, the applicant’s proposal of 315 on-site parking spaces is
substantially below the normal design standard whereby the design peak parking demand is
only exceeded by the actual parking demand for 10 or 20 hours per year. The consultant
considers that it could be reasonably expected that the proposed onsite carparking provision
would be exceeded by the actual parking demand for between 50 and 70 hours per
year. The frequency of exceedance could be much higher if course structures change in the
future to include more student contact hours.
Given the site’s location with little on street car parking available for any overflow car
parking, officers are not agreeable to the proposed change.
Current Offsite Impacts
During the application process, Council staff discovered the applicant had constructed a
gravel parking area and shed within the adjacent Lake Doonella Park Reserve without
approval from Council. This parking area is about 1,215m2 in area and approximately 110m
in length by 12m in width. The land is located to the immediate south behind existing building
B and is owned by the State, with Noosa Council being Trustee of the land for Park and
Recreation Purposes.


                                                                                  Page 18 of 123

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    23 JUNE 2015


The applicant describes that this portion of the reserve contains existing sewer infrastructure
and has been covered by grass since the development was built. The land was then utilised
by patrons of the centre for overflow parking with the area gravelled in late 2012 (See
Figures 2 & 3).




Figure.2 Informal carparking area




Figure.3 Site photo of informal carparking area. Note the property boundary is adjacent to
the masonry walls.


                                                                                   Page 19 of 123

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


On the 1 April 2015, the applicant made a separate request to Council’s Property and
Facilities Manager to either purchase or lease this land for additional parking, increasing the
available car parking from 315 to 355. The proposed parking layout is shown as Attachment
3.
The Property and Facilities Manager subsequently advised the applicant they do not support
the lease or purchase of part of the Reserve for carparking. This is because the proposed
use as a carpark is inconsistent with the designated purpose of the Reserve and it is
preferable for the land to remain intact for the community purpose for which it was dedicated.
Were Council to consent to the use of this land for carparking, the application would need to
be remade to include the Reserve land. Notably the 355 spaces (inclusion of adjoining
parkland 40 spaces) would mean the design peak parking demand would be exceeded
about 20hrs per year.
Other Requests
Several other requests were made as part of the application pertaining to the reduction in the
number of bicycle facilities, and the removal of the condition restricting the number of
students and teachers.
Bicycle and end of trip facilities
The existing conditions require the following minimum bicycle and end of trip facilities:
    Stage A - 18 bicycles, 9 lockers and 2 showers
    Stage B - 35 bicycles, 18 lockers and 3 showers
The applicant requests the conditions be amended to only provide 24 bicycles parks, 12
lockers and 4 showers for the total development. In support of the request, the applicant’s
parking survey shows an average of 1 bicycle was onsite during any given day. It is further
noted that existing bicycle facilities are located underneath the existing building and
stairwells, which are not well signed.
Based on the current uses on the site, The Noosa Plan requires 154 bicycle parks, 77
lockers and 15 showers. The existing conditions have already substantially reduced the
bicycle parking provision from the scheme requirement and there is ample room on the site
to provide for the minimum number of bicycle parking and end of trip facilities specified by
the existing conditions of approval.
The applicant shall continue to provide for the required bicycle parking and end of trip
facilities in accordance with the existing conditions of approval, so as to encourage users to
access the site by means other than car, consistent with the outcomes sought by The Noosa
Plan.
Limit on people using the site
Condition 15 limits the number of people on the site at any one time for the education use.
This was originally imposed for infrastructure charging purposes, as the previous planning
scheme policies for education uses were based on numbers of students. Council’s
Infrastructure Charges Officer indicates that these policies have been superseded and are
based now based on use areas and it is considered acceptable to delete this condition.

5.    CONSULTATION
5.1. IDAS Referral Agencies
Nil




                                                                                    Page 20 of 123

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


5.2. Other Referrals
The application was forwarded to the following internal Council specialists, with their
assessment forming part of the report:
     Property and Facilities Manager;
     Coordinator Engineering Assessment;
     Infrastructure Charges Officer; and
     Environmental Officer.

6.     CONCLUSION
The application seeks approval to change conditions of the existing development approval
for the Noosaville Medical & Professional Centre. The changes primarily seek to vary the
carparking and use area limits, as the education use (Central Queensland University - CQU)
is currently operating in conflict with the approval conditions and significantly exceeds the
approved floor area for that use. The existing approval requires the construction of a multi-
level carpark to adequately cater for increased demand.

CQU is the largest tenant in the centre and has the highest carparking generation rates of
the uses within the mixed use development. As part of the assessment, it was found the
current non-compliance with the existing conditions of the approval has had offsite
carparking impacts by way of an unlawful carpark constructed on the adjacent Lake
Doonella Reserve. Council’s traffic consultant also considers there is insufficient basis for
the parking relaxations sought and any further relaxations will inevitably lead to significant
off-site impacts.

It is recommended Council refuse the requested changes to reduce the onsite carparking,
bicycle parking and end of trip facilities as they are likely to cause offsite impacts on the
surrounding road network, noting that on street car parking along Goodchap Street is limited.
Furthermore, the applicant should be directed to remove all illegal works from the Reserve
and reinstate the disturbed area within 6 months.

Aside from the refusal of the requested reduction to the on-site parking provision it is
recommended to delete the condition relating to the maximum number of people permitted
on the site at any one time.

Departments/Sections Consulted:

     Community Services                      x   Planning & Infrastructure
     Disaster Management & Public Order          Building & Plumbing Services
     Waste & Environmental Health            x   DA Planning
     Community Facilities                        Strategic Land Use Planning
     Cultural Facilities                     x   Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment
                                             x
     Executive Office                        x   Corporate Services
     Community Engagement                        Finance
     Customer Service                            ICT
     Executive Support                           Procurement & Fleet
     Governance                              x   Property & Facilities
     Human Resources                             Revenue Services




                                                                                  Page 21 of 123

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   23 JUNE 2015



                         Attachment 1 – Proposed changes to conditions
Existing Condition                                       Proposed Change
                                                         Replace the approved plans with new overall
1. Development undertaken in accordance with
                                                         layout plans including;
   this approval must generally comply with the
                                                          - Amendments to the internal layout plans
   approved plans of development which allows
                                                              removing the internal tenancy dividers; and
   the development to be undertaken having
                                                          - The removal of the 142 bay multilevel
   regard to the two stages. The approved
                                                              carpark with a 63 bay ground level carpark
   plans may be amended by these conditions.
                                                              (See Attachment 2).

                                                         Given current usage levels of the 18 existing
7. Secure bicycle racks shall be provided on site
                                                         bicycle bays, it is suggested that an additional 6
   to accommodate a minimum of: -
                                                         bays be provided, providing a total of 24 spaces.
   7.1 Stage A – a minimum of 18 bicycles for
       the increase in floor areas of the                Proposed Condition:
       Commercial Business uses of Office and            7. Secure bicycle racks shall be provided on site
       Medical.                                          to accommodate a minimum of 24 bicycles.
                                                         Should there be a demand for additional bicycle
   7.2 Stage B – a minimum of 35 bicycles for            racks the applicant shall provide a sufficient
       the increase in floor areas of the                number of racks to meet that demand on an
       Commercial Business uses of Office and
                                                         ongoing basis.
       Medical and Education use of Adult.
The proposed bicycle racks shall be identified on
the plans submitted for Operational Works
approval and shall be located to the reasonable
satisfaction of the Manager, Land Use.
                                                         The development currently provides for 4
8. End of trip facilities shall be provided within the
                                                         showers and 12 lockers.
   approved buildings at a minimum rate of:
   8.1 Stage A - a minimum of 9 lockers and 2            Proposed Condition:
       showers.                                          8. End of trip facilities shall be provided within the
                                                         approved buildings at a minimum rate of 12
   8.2 Stage B – a minimum of 18 lockers and 3           lockers and 4 showers. The applicant shall
       showers.                                          provide a sufficient number of lockers to meet
                                                         demand on an ongoing basis.
10. The proposed development shall not exceed
                                                         It is proposed to remove the multi storey carpark
   a maximum height of:-
                                                         and provide on ground parking.
   10.1 for buildings, 2 storeys and 10 metres
        above natural ground level, with the             Proposed Condition:
        exception of the Stage 2 building, which         10. The proposed development shall not exceed
        may be 3 storeys in height in accordance         a maximum height of 2 storeys and 10 metres
        with the approved plans.                         above natural ground level, with the exception of
                                                         Building B, which may be 3 storeys in height in
   10.2 for the car park structure, 8 metres above
                                                         accordance with the approved plans.
        natural ground level, with the exception of
        the rendered block work up stand (ie. lift
        overrun) adjacent to the driveway ramp
        which shall not exceed 10.5 metres
        above natural ground level.
11. A verification survey of the building is to be
    carried out by a Licensed Surveyor and a
    certificate lodged with Council at completion
    of work confirming compliance with the
    maximum allowable building height as
    required by either the conditions of approval
    or the Planning Scheme.




                                                                                                 Page 22 of 123

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           23 JUNE 2015


                                                     The applicant is keen to provide more flexibility
12. The development is permitted a total
                                                     within the approval and requests the condition be
     maximum use area of: -
                                                     amended as follows:
                      2
12.1 Stage A - 5954m with each individual use
     permitted the following maximum use             Proposed Condition:
     areas at any one time:-                         12. The development is permitted a total
                                                     maximum total use area of 6,054m². Some of the
   12.1.1 Commercial Business – Type 1 Office
                  2                                  approved uses on the site are to have maximum
          – 2420m
                                                     use areas as follows:
   12.1.2 Commercial Business       –   Type     2   - Commercial Business Type 2 Medical –
          Medical – 3000m2                              2000m²;
                                                     - Education Type 3 Adult (Student Contact) –
   12.1.3 Education – Type 3 Adult – 790m2              1,400m²;
   12.1.4 Retail Business – Type 1 Local –           - Retail Type 1 Local – 100m²; and
          100m2                                      - Retail Business Type 2 Shop and Salon and
                                                        Entertainment & Dining Business Type 1 Food
   12.1.5 Retail Business Type 2 Shop or                and Beverages – 236m² (including outdoor
          Entertainment and Dining Business             dining).
          Type 1 Food and Beverages – 236m2
          (includes 16m2 of outdoor dining).
                      2
12.2 Stage B - 6304m with each individual use
     permitted the following maximum use
     areas at any one time:-
   12.2.1 Commercial Business – Type 1 Office
                  2
          – 2420m
   12.2.2 Commercial Business       –   Type     2
                          2
          Medical – 3000m
                                            2
   12.2.3 Education – Type 3 Adult – 1600m
   12.2.4 Retail Business – Type 1 Local –
                2
          100m
   12.2.5 Retail Business Type 2 Shop or
          Entertainment and Dining Business
                                            2
          Type 1 Food and Beverages – 236m
                       2
          (includes 16m of outdoor dining).


                                                     The determining factor with respect to car park
15. The education use is permitted a maximum
                                                     generation for the Education use is use area and
    number of staff/employees at any one time: -
                                                     not staff or student numbers. This being the case,
 15.1 Stage A – a maximum of 7 staff/employees       the condition is of little relevance and should be
      and 70 students.                               deleted.
 15.2 Stage B – a maximum of                    14
      staff/employees and 140 students.




                                                     it is requested that condition 36 be amended as
36. The development shall provide car parking
                                                     follows:
    spaces on the site at a minimum rate of: -
 36.1 Stage A - a minimum of 316 car parking         Proposed Conditions:
       spaces, including six clearly defined         36. The development shall provide a minimum of
       disabled ca rparking spaces.                  355 car parking spaces on site, including six
                                                     clearly defined disabled car parking spaces.
 36.2 Stage B - a minimum of 393 car parking
       spaces, including six clearly defined
       disabled car parking spaces.



                                                                                          Page 23 of 123

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        23 JUNE 2015


38. Vehicular access to the site from Goodchap     38. Vehicular access to the site from Goodchap
    Street and car parking shall be generally in   Street and car parking shall be generally in
    accordance with Middap Ditchfiled Pty Ltd      accordance with the drawings prepared by
    Drawings: -                                    Middap Architiecture Pty Ltd, as follows:
                                                   - Overall Parking Layout – Drawing No. 0427
 38.1 Stage A – 0715 WD 01.1, 0427 DA01E,
                                                      DA01F, dated October 2014; and
      0427 DA02E, 0427 DA03E, 0427 DA04E,
                                                   - Working Drawings Carpark Layout – Drawing
      except as modified herein, the multilevel
                                                      No. 0715 WD01.1A, dated April 2008
      car park as shown on 0427 DA01E, 0427
      DA02E, 0427 DA03E, 0427 DA04E.
 38.2 Stage B - 0427 DA01E, 0427 DA02E,
      0427 DA03E, 0427 DA04E, 0427 DA10E,
      0427 DA11E and 0427 DA12E, except as
      modified herein.




                                                                                       Page 24 of 123

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015



         Attachment 2 – Existing and Proposed Plan Changes




                                                   Page 25 of 123

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                23 JUNE 2015




Attachment 2.1 – Existing Approved Carpark Layout Plans (395 spaces provided)




                                                                            Page 26 of 123

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA      23 JUNE 2015




Attachment 2.2 – Proposed Carpark Layout Plan (316)

                                                      Page 27 of 123

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA       23 JUNE 2015




Attachment 2.3 – Existing Approved Podium Level Plan


                                                       Page 28 of 123

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               23 JUNE 2015




Attachment 2.4 – Proposed Podium Level Plan (Note: Changes to tenancy sizes)




                                                                           Page 29 of 123

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA      23 JUNE 2015




Attachment 2.5 – Existing Approved Upper Level Plan



                                                      Page 30 of 123

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              23 JUNE 2015




Attachment 2.6 – Proposed Upper Level Plan (Note: Changes to tenancy sizes)


                                                                              Page 31 of 123

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              23 JUNE 2015


Attachment 3 – Proposed carpark plan including the use of Council Environmental Reserve




                                                                             Page 32 of 123

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               23 JUNE 2015


4                        DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
                         ANIMAL HUSBANDRY TYPE 1 (AQUACULTURE) AT 15 PRODUCTION ST,
                         NOOSAVILLE (MCU14/0096)
DOCUMENT INFORM AT ION




Author                          Development Planner, Jack Lewis
                                Planning & Infrastructure Department

Index                           ECM / Application / MCU14/0096

Attachments                     1.   Locality Plan
                                2.   Proposal Plans

         APPLICATION DETAILS

         Applicant                          Oceanic Technologies Pty Ltd

         Proposal                           Development Permit for Material Change of Use – Animal
                                            Husbandry Type 1 (Aquaculture)

         Properly Made Date                 19/12/2014

         Notification Period                29/04/2015 – 19/05/2015

         Decision Due Date                  07/07/2015

         Number of Submissions              1 Properly Made Submission


         PROPERTY DETAILS

         Property Address                   Lots 0, 3 & 4/15 Production Street, Noosaville

         RP Description                     Lots 0, 3 & 4 SP184294

         Land Area                          571m2

         Existing Use of Land               Industrial Units


         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Noosaville

         Zone                               Industry

         Overlays                           Natural Hazards (Potential Acid Sulfates and Bushfire)

         Assessment Type                    Impact




                                                                                              Page 33 of 123

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               23 JUNE 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 23 June 2015 regarding Application No. MCU14/0096 for a
Development Permit for Animal Husbandry Type 1 (Aquaculture) situated at 0, 3 & 4/15
Production Street, Noosaville and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
          When Conditions must be Complied With
     1.   Unless otherwise stated, all conditions of this Decision Notice must be complied
          with prior to the use commencing, and then compliance maintained at all times
          while the use continues.
          Approved Plans
     2.   Development undertaken in accordance with this approval must generally
          comply with the approved plans of development. The approved plans are listed
          in the following table unless otherwise amended by these conditions.

           Drawing No.         Plan/Document Name                            Date
           1                   Site Plan                                     8-3-2015
           2                   Floor Plan                                    8-3-2015
           3                   Floor Plan                                    8-3-2015

     3.   Development authorised by this approval must be undertaken generally in
          accordance with the Approved Plans listed within this Decision Notice.
          Water & Sewer Connections
     4.   An underground connection to reticulated water and sewerage must be provided
          to the development site in accordance with the standards and requirements of
          Northern SEQ Distributor–Retailer Authority (Unitywater).
     5.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground
          connection to reticulated water and sewerage has been provided to the
          development site.
     6.   All waste water should be disposed to sewer in accordance with requirements of
          Unitywater.
          Amenity
     7.   The development must not create detrimental impacts on the amenity of the area
          due to the creation of excessive noise, odour nuisance or other emissions.
     8.   The development shall incorporate suitable mechanical ventilation, filtration
          systems or the like to manage the risk of ingress airborne pollutants from any
          surrounding industrial uses.
     Advisory Notes
          Acoustic Advice & Design
     1.   It is highly recommended that the developer seek the advice and design input of
          a qualified acoustic consultant at the plan development stage to ensure the
          development does not cause a noise nuisance under the Environmental
          Protection Act 1994 or this Decision Notice. Attention should be given to the
          following (but not limited to):

                                                                              Page 34 of 123

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      23 JUNE 2015


                 building design and construction.
                 design, selection and installation of fixed plant and equipment.
                 the location of air conditioning and heating units, refrigeration plant,
                   pumps, mechanical exhausts and plant rooms etc.
                 the use of acoustic enclosures/screens around noisy plant and
                   equipment.
                 operating times.
           Environmental Protection
     1.    The development should be undertaken in a manner that causes no unlawful
           environmental nuisance under the Environmental Protection Act 1994 by the
           creation of excessive noise, lighting, waste, atmospheric pollutants (including
           dust or odours) or other releases to the environment.
     2.    In accordance with the Environmental Protection Act 1994, all sand, silt, mud,
           paint, cement, concrete, builder’s waste or other prescribed contaminants should
           not to be released to or be placed where it could reasonably be expected to
           move into a roadside gutter, storm water drain or a watercourse. On the spot
           fines apply for such offences.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1.    The aquaculture use is similar in nature to an industrial processing operation and
           appropriately located within an existing industrial premise.
     2.    The development will not negatively impact on the existing businesses in the
           area.



REPORT
1.   PROPOSAL
The application seeks approval for a Development Permit for a Material Change of Use for
Aquaculture (Animal Husbandry Type 1 – Traditional). The use is proposed within 2 existing
industrial units situated at 15 Production Street, Noosaville.

The proposal involves the internal fit-out of the existing 571m2 industrial units with various
sized tanks and filtration equipment. No external building works are proposed apart from the
storage of 2 tanks adjacent to the shed. The proposed aquaculture business includes:
   Growing Giant Grouper, Barramundi, Flowery Cod and Cobia for live delivery to
     market. When fully operational it is expected to produce approximately 60 tonnes per
     annum.
   Using a recirculated aquaculture system of 8 x 40,000L grow tanks, associated
     filtrations equipment and 2 x 22,500ltr seawater and waste water tanks located within
     common property adjacent to the industrial units.
   Wastewater discharges to the sewerage system. Approval has been obtained from
     Unity Water to discharge waste water.
The locality and proposal plans are included as Attachments 1 & 2. The application is
before Council because Agricultural uses are inconsistent within the Industry zone.




                                                                                      Page 35 of 123

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


2.    SITE DETAILS
The site includes 4 attached industrial units constructed in 2003. Access to the site is via a
shared driveway along the northern side of the industrial units. Tenancy 2 contains ‘Noosa
Spanner Crabs’ and is the only industrial unit currently occupied within the complex.

The site adjoins similar industrial lots to the south and north. To the east of the site is
Precinct E4 (Employment – Industry & Business) of the Shire Business Centre.

3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
   the Planning Scheme for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
The site is located within the urban footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Noosaville Locality and is zoned Industry. The proposed
use is identified as an inconsistent use within the zone and is required to follow an impact
assessable application process.
Locality Provisions
The Overall Outcomes of the Noosaville Industry zone seek for new uses to be compatible
with surrounding development, with land in this zone generally reserved for industrial uses to
the exclusion of incompatible uses including residential, community and office type
businesses.
The proposed aquaculture business does not require the use of expansive dams like other
aquaculture businesses found generally within the rural areas of Noosa. Rather, the
proposed development is generally confined to the use of large holding tanks within an
existing industrial building. As a result, the use is akin to an industrial processing business,
with the impacts contained and there is no visible evidence of the aquaculture tanks from the
street.
The development does not impact on the surrounding water quality, and will have similar
waste and traffic impacts compared to other surrounding industrial businesses found within
the locality.
Land Use, Works & Overlay Provisions
The following codes which regulate land use and design are most applicable to this
application:
    Agricultural Uses Code
    Business Uses Code
    Engineering Works Codes
    Natural Hazards Overlay Code

                                                                                    Page 36 of 123

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


The application has been assessed against each of the above applicable codes and
generally complies with each, with further discussion provided below.
Agricultural Uses Code
The Probable Solutions of the Agricultural Uses Code details minimum lot sizes and
setbacks for aquaculture ponds, however these solutions generally relate to open ponds in
rural areas which adjoin residential uses. The proposed aquaculture business is contained
within an existing industrial unit with minimal external impacts. The development is unlikely
to cause significant adverse impacts on adjoining industrial uses and is consistent with the
Outcomes of the code.
Business Uses Code
The applicant indicates that after the tanks and recirculation systems are installed, the
aquaculture use is not going to be labour intensive, with generally two employees at the
premises at any one time. There are 22 carparking spaces on the site, with 11 spaces
credited to the subject tenancies. The proposed development includes sufficient carparking
and driveway areas for small truck deliveries and pick up.
The use of the open areas adjacent to the sheds is within an existing concrete storage area
and does not impact on any existing landscaping on the site. General conditions are
recommended for appropriate on-site waste and chemical storage, and suitable mechanical
ventilation, filtration systems or the like to manage the risk of ingress legitimate airborne
pollutants from any surrounding industrial uses.

4.   CONSULTATION
4.1. IDAS Referral Agencies
The application was referred to the State Agency Referral Agency for the following matters:
Concurrence
Department of Agriculture, Forestry and Fisheries
The Department is a concurrence agency for certain aquaculture. The Department
responded on the 4 February 2015 with conditions to be attached to any development
approval. The conditions include limits on species type, pond size and management of the
aquaculture business.
4.2. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. One (1) properly made submission was received. The
following table provides a summary and assessment of the issues raised by the submitter.

 Issues                                          Comments

 Appropriate conditions should be applied to     Conditions are recommended for
 any approval in relation to waste, storage of   appropriate waste and chemical storage,
 hazardous material and odour management         similar to adjacent industrial development
 so as not to impact on the adjacent land.       approvals.




                                                                                  Page 37 of 123

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  23 JUNE 2015


5.     CONCLUSION
The proposed Agriculture Use - Type 1 (Aquaculture) within an existing industrial unit in the
Noosaville Industry zone is an inconsistent use within the zone, but does not raise any
significant planning concerns.

The holding tanks for the proposed aquaculture business are contained within an existing
industrial unit, and the development will have similar impacts to other industrial type
businesses within the locality. The application is recommended for approval, with grounds
identified to overcome the planning conflict included in the recommendation.

Departments/Sections Consulted:

     Community Services                     X   Planning & Infrastructure
     Disaster Management & Public Order         Building & Plumbing Services
     Waste & Environmental Health           X   DA Planning
     Community Facilities                   X   Strategic Land Use Planning
     Cultural Facilities                        Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

     Executive Office                           Corporate Services
     Community Engagement                       Finance
     Customer Service                           ICT
     Executive Support                          Procurement & Fleet
     Governance                                 Property & Facilities
     Human Resources                            Revenue Services




                                                                                 Page 38 of 123

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA      23 JUNE 2015



                                 Attachment 1 – Locality Plan




                                                      Page 39 of 123

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     23 JUNE 2015



                               Attachment 2 – Proposal Plans




                                                     Page 40 of 123

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




\



                                                   Page 41 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA         23 JUNE 2015

               ry
               ~     f      Shee                      AF   yt
                  OF         —   T                     ye
                      —                 3                    ‘
                    j                     ie                 QO
                  4            <        | ES            =>   |e)
                 J                      i Pe)       ze X
                                          _—        G3       g
        EEE ||                          Ea)          2
        een                             | sea mal    _ ||
           Se                           |        rs     :
        <8 La                                  Gras |
        > 3 fal                                      poet  ;
        °    u                                        a
        gue I                sa         | ES;   |      77
          133   ||                      el:      |     &
          g &                (3                 |
          3                                      |
          r                              ge              Se
                                          YS
                                          iG    iy
                                             ‘         2a
                                             BLE
                Kk                       boo
                                          Shy
                             2,               ~ AS    ae  al
                |                       Gy     WY on       |
                              CJ         |                 |
                |                             af \.       7
                                                      \ >    A
                                                    aw        lier
                                                              $F
                                                   [->]   4   bu
                Ke                                 PIL,
                                           :                 -
                                       re NE      °       | :
                            a          <   J]                6
                              f            7      a       |    on
                                          yt      i            :
                                            fey        be ||
    ekg                               aA
    | 3         |                   eels |S |
    wre                                 Dy
    ole         | @ 5)          Jo     tI                 |
    olf           cieenanel     Z                   RPE
    B
    Oy};
    " R

\

                                                         Page 41 of 123

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                23 JUNE 2015


5                        APPLICATION TO RECONFIGURE 1 LOT INTO 2 LOTS AT 38 PAVILION STREET,
                         POMONA REC15/0010
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM / Application / REC15/0010

Attachments                      Nil



         APPLICATION DETAILS

         Applicant                          Alisa Wythes C/- Max Watterson & Associates

         Proposal                           Development Permit for Reconfiguring of a Lot – 1 lot into 2
                                            lots

         Properly Made Date                 26 May 2015

         Information Request Date           Not Applicable

         Information Response               Not Applicable
         Date

         Decision Due Date                  2 July 2015

         Number of Submissions              Not Applicable


         PROPERTY DETAILS

         Property Address                   38 Pavilion Street, Pomona

         RP Description                     Lot 1 RP 196984

         Land Area                          1872m²

         Existing Use of Land               Dwelling and shed


         STATUTORY DETAILS

         SEQRP Designation                  Urban Footprint

         Locality                           Mary River Catchment

         Zone                               Detached Housing

         Overlays                           Not Applicable

         Assessment Type                    Code Assessable



                                                                                               Page 42 of 123

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 23 June 2015 regarding Application No. REC15/0010 for a
Development Permit for Reconfiguration of a Lot – 1 lot into 2 lots situated at 38 Pavilion
Street, Pomona and:
A.   Approve the application in accordance with the following conditions:
           When Conditions Must Be Complied With
     1.    Unless otherwise stated, all works required by the conditions of this Decision
           Notice must be completed prior to submission of the subdivision plan to Council
           for compliance assessment.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally
           comply with the approved plans of development. The approved plans are listed
           in the following table unless otherwise amended by these conditions.
            Plan No.          Rev.          Plan/Document Name                     Date
            15-3836AB                Plan of Proposed Reconfiguration of Lot     16-03-15
                                     1 on RP196894, prepared by Max
                                     Watterson & Associates

           Performance Bond
     3.    Security in the form of a cash bond or trading bank guarantee to the sum of
           $5,000 must be submitted to Council, to secure performance of all conditions of
           this approval, prior to the issue of a Development Permit for Operational Works.
           The cash bond or trading bank guarantee will be returned on performance of the
           conditions of approval less any costs incurred by Council in respect of enforcing
           performance of this permit. Council reserves the right to call upon the bond or
           guaranteed sum to effect compliance with conditions.
           External Works
     4.    The north eastern corner of the intersection of Pavilion Street and Tree Street
           must be upgraded. The works must be undertaken in accordance with an
           Operational Works approval and must include in particular:
           a.    provision of kerb and channel at the intersection and extending a minimum
                 of 6 metres along the Pavilion Street and Tree Street frontages
           b.    any associated widening of the existing pavement including suitable tapers
                 in Pavilion Street and Tree Street.
           c.    runoff from the kerb and channel directed to the existing table drain in
                 Pavilion Street
           This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
           being non-trunk infrastructure.
     5.    To minimise the amount of surface runoff from the Tree Street road verge
           entering the site, minor regrading of the verge area must be undertaken. The
           works must be undertaken generally in accordance with drawing number 1511-
           02A prepared by Callghan and Toth dated May 2015. The works must be
           undertaken in accordance with an Operational Works approval.
           Stormwater Drainage
     6.    Stormwater runoff from proposed Lot 1 must be discharged into Council’s
           existing drainage system in Pavilion Street

                                                                                Page 43 of 123

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015


    7.    Stormwater runoff from proposed Lot 2 must be disposed of on-site without
          causing scour or damage to the subject site or any adjoining property. The on-
          site system must be constructed generally in accordance with drawing number
          1511-01A prepared by Callaghan and Toth dated May 2015. The construction of
          the on-site system must be undertaken as part of a Building Permit.
          Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided
          to each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground
          connection to reticulated water and sewerage has been provided to each lot.
          Electricity and Telecommunication Services
    10.   Reticulated electricity and telecommunication services must be provided to each
          lot in accordance with an approval for Operational Works and the standards and
          requirements of the relevant service provider.
    11.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits
          and pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    12.   Certification must be submitted to Council from all relevant service providers
          which certifies that the development has met the requirements of this Decision
          Notice and all applicable legislation at the time of construction.
          Easements
    13.   Unless otherwise agreed in writing by the relevant service provider, any public or
          third party infrastructure located on the subject site must be placed within an
          easement registered against the title of the property.
    14.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the
          Grantee’s standard easement terms. Draft easement documentation must be
          submitted to Council for endorsement.
    15.   All works must be kept clear of any existing or proposed easements on the
          subject land, unless agreed otherwise in writing by the Grantee.
          Damage to Services and Assets
    16.   Any damage caused to existing services and assets as a result of the
          development works must be repaired at no cost to the asset owner at the
          following times:
          a.   where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
          b.   where otherwise, upon completion of the works associated with the
               development.
          Any repair work which proposes to alter the alignment or level of existing
          services and assets must first be referred to the relevant service authority for
          approval.




                                                                                Page 44 of 123

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      23 JUNE 2015


       ADVISORY NOTES:
           Building and Construction Industry (Portable Long Service Leave) Levy
     17.   The QLeave levy must be paid prior to the issue of a development permit where
           it is required. Council will not be able to issue a Decision Notice without receipt of
           details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or
           (07) 3212 6855.
           Preparation of a Preliminary Construction Management Plan
     18.   A preliminary Construction Management Plan must be submitted with the
           Operational Works application and must address the following:
           a.    appropriate traffic signage in accordance with the Manual of Uniform Traffic
                 Control Devices (MUTCD)
           b.    provision for safe pedestrian access across the frontage of the site both
                 during daily construction and after daily construction has ceased.
     PROPERTY NOTES:
     REC15/0010 - Stormwater
     The following notation applies to approved Lot 2:
     Private Certifiers, owners and prospective purchasers are notified that special
     stormwater requirements apply to this parcel of land. Contact Council's Planning
     Department for Details. (reference Council Approval REC15/0010).
B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1.    The lot sizes are sufficient to accommodate a dwelling and associated structures
           and are of a size that is consistent with the developed character of Tree and
           Pavilion Streets and the surrounding area.


REPORT
1.   PROPOSAL
The applicant seeks to subdivide a corner L shape lot into 2 lots, each lot being 938m². The
lot on the corner of Pavilion and Tree Streets contains a dwelling and a large shed. The
proposed western lot 1 fronting Pavilion Street contains the dwelling and the proposed
eastern lot 2 fronting Tree Street contains the large shed.

The applicant has provided preliminary plans for stormwater treatment. Both lots are or can
be serviced with sewer, water, power and telecommunications. The applicant proposes no
frontage works including a footpath or kerb and channelling to Pavilion or Tree Streets.
Figure 1 below shows the subject site outlined in purple and Figure 2 shows the proposed lot
layout.

The proposal is before Council because the lots do not meet the minimum lot size of 1000m²
for Pomona and no frontage works are proposed.




                                                                                     Page 45 of 123

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




Figure 1 - Locality Plan




Figure 2 - Lot layout and existing improvements




                                                   Page 46 of 123

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


2.   SITE DETAILS
2.1. Background
The proposed subdivision seeks to re-instate the original lots created in 1922 (Lot’s 6 & 35
RP 35073), which were amalgamated in 1984.
2.2. Site Description
The subject property is located at the north eastern intersection of Tree Street and Pavilion
Street. The proposed Lot 1 slopes slightly from the eastern boundary to Pavilion Street and
proposed lot 2 slopes slightly to the northern western boundary near the shed.
2.3. Surrounding Land Uses
Detached housing immediately surrounds the site, the eastern side and most of the western
side of Pavilion Street. The showground, caravan park and larger flood prone detached
housing lots are located on the western side of Pavilion Street.

3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   any Structure Plan or Master Plan in place for declared areas;
   any Preliminary Approval Overriding the Planning Scheme for the land;
   the Planning Scheme for the local government area; and
   any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.

3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal
is consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
   SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the
SEQ Regional Plan Regulatory Provisions.

3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Mary River Catchment Locality and is zoned Detached
Housing. Reconfiguration of a lot is required to follow a code assessable application
process.


                                                                                  Page 47 of 123

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


Locality Provisions
The proposal complies with the provisions of the Mary River Catchment Locality Code as the
proposal is located within a well-established area of Pomona.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this
application:
   Reconfiguring a Lot Code
   Engineering Works Codes
The application has been assessed against each of the above applicable codes. The
pertinent issues arising out of the assessment against the codes are discussed below:
Lot Size
Probable Solution S1.1 and Specific Outcome O1 of the Reconfiguring a Lot Code require a
minimum lot size of 1000m² for sewered lots in Pomona. The proposed lots do not meet the
required 1000m² being 938m² each. The lot size is therefore assessed against the most
relevant Overall Outcomes of the Code which read as follows:
The overall outcomes sought by the Reconfiguring a Lot Code are to ensure that any
reconfiguring of lots results in—
a)   lot sizes and dimensions that are appropriate for their intended use;
b)   compatible relationships between land uses;
c)   lots with suitable, safe and appropriate access;
d)   acceptable impacts on watercourses,             drainage    lines,   wetlands   and   other
     environmentally sensitive areas;
e)   an effective and efficient road network that is designed to integrate with the natural
     topography;
f)   provision of safe facilities for walking, cycling and public transport;
g    lots that avoid significant adverse effects on the natural environment and landscape
     and minimise the risk of hazards for people and property;
h)   effective and efficient provision of relevant infrastructure and community services that
     meet future needs;
i)   promotion of social interaction and community activity;
j)   provision of an accessible and useable network of open space for local communities;
k)   lots that are designed and orientated to accommodate energy efficient building design;
l)   residential development which is consistent with the developed character of its
     particular neighbourhood
The proposed lots are both sewered and suitably sized for their intended use being for
detached housing with Lot 1 accommodating an existing dwelling that complies with setback
provisions and Lot 2 sufficient for a dwelling, being 936m². The proposed lots are identical in
size to 21 of the 25 lots in Tree Street and similar to those in the surrounding area, some of
which are smaller than that proposed. The proposed lot size, being the reinstatement of the
original lots is consistent with the established character of the area. Access to the proposed
Lot 1 will remain unchanged and lot 2 will require a standard cross over similar to those
which exist in Tree Street.




                                                                                     Page 48 of 123

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          23 JUNE 2015


Frontage Works
Probable Solution S13.1 of the Transport, Roads and Drainage Code requires frontage
works be provided to the full frontage of the site. The applicant does not propose any
frontage works. The development is therefore required to be assessed against Specific
Outcome O13 which states:
Specific Outcome O13 - Development is provided with external roadworks along the full
extent of the frontage of the site to an appropriate standard having regard to the specified
function of the road.
Officers agree with the applicant that a footpath and, for the majority of the frontage, kerb
and channel is not necessary because:
    there is currently no frontage works in Tree Street and only disconnected sections of
      kerb and channel and no footpath on the eastern side of Pavilion Street
    there is no further potential for developments which would require frontage works in
      Tree Street and only limited subdivision opportunities on the western side of Pavilion
      Street where kerb and channel and a footpath already exist
    a lack of existing infrastructure to connect to (Pavilion and Tree Streets)
    the table drain located to the frontage is in good condition and generally functions well
      with only some minor reprofiling required in the Tree Street verge for stormwater
      management. Figure 3 below shows the corner and the condition of the table drain.
However, some kerb and channel is warranted as minor damage exists to the road
formation, by what appears to be caused by vehicles ‘cutting’ the corner. The damage can
be seen circled in Figure 3 below. To improve the road, it is recommended the applicant
construct a kerb return at the intersection extending for approximately 6 metres along each
frontage, which is consistent with other works nearby.




Figure 3 - Frontage of Pavilion Street on the left and Tree Street on the right. Road formation damage
circled in red.

Boundary truncation
Planning Scheme Policy PSP 5 – Engineering Design Standards for Roads, Drainage and
Earthworks requires a truncation to the corner of proposed Lot 1. In this instance, given the
wide road reserve and good sight lines; it is considered the truncation is not necessary.
Photo 3 above (image on the left) provides an indication of the sight lines from Tree Street.

                                                                                         Page 49 of 123

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


Stormwater quality and management
The existing dwelling currently discharges to Pavilion Street and no changes or
improvements are considered necessary as this is a lawful point of discharge. The applicant
has provided a plan prepared by a Registered Professional Engineer of Queensland
indicating an on-site absorption pit to address stormwater on proposed Lot 2, which meets
the provisions of the Planning Scheme. The absorption pit is proposed to be constructed as
part of a building approval. A property note advising prospective purchasers of the proposed
Lot 2 of the specific stormwater requirements is recommended.

4.     CONSULTATION
4.1. Other Referrals
The application was forwarded to the following internal Council specialists:
     Engineering Officer

5.     CONCLUSION
The proposed lot sizes do not meet the required minimum outlined in The Noosa Plan.
However, the proposal for fully serviced lots is a re-instatement of the original lot layout, is
consistent in size and shape to surrounding lots and the lots are suitable for their intended
use. Given that no kerb and channel or footpath exists in Tree Street and there is minimal
frontage works to the eastern side of Pavilion Street, only a kerb return on the corner is
considered necessary to improve vehicle safety. The proposal is recommended for approval
subject to conditions.

Departments/Sections Consulted:

     Community Services                      X   Planning & Infrastructure
     Disaster Management & Public Order          Building & Plumbing Services
     Waste & Environmental Health                DA Planning
     Community Facilities                        Strategic Land Use Planning
     Cultural Facilities                         Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

     Executive Office                            Corporate Services
     Community Engagement                        Finance
     Customer Service                            ICT
     Executive Support                           Procurement & Fleet
     Governance                                  Property & Facilities
     Human Resources                             Revenue Services




                                                                                    Page 50 of 123

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       23 JUNE 2015


6                        APPLICATION FOR A CONCURRENCE AGENCY RESPONSE FOR A DETACHED
                         HOUSE AT 1 OVERTON WAY, KIN KIN RAP15/0008
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Planning & Infrastructure Department

Index                            ECM / Application / RAP15/0008

Attachments                      1.   Proposal Plans



         APPLICATION DETAILS

         Applicant                           Axis Building Certification Pty Ltd

         Proposal                            Detached House

         Properly Made Date                  01/04/2015

         Information Request Date            15/04/2015

         Information Response                22/05/2015
         Date

         Decision Due Date                   02/07/2015

         Number of Submissions               Not Applicable


         PROPERTY DETAILS

         Property Address                    1 Overton way, Kin Kin

         RP Description                      Lot 1 SP 167230

         Land Area                           1688m²

         Existing Use of Land                Detached House under construction


         STATUTORY DETAILS

         SEQRP Designation                   Regional Landscape and Rural Production

         Locality                            Boreen Point , Kin Kin, and Cootharaba

         Zone                                Detached Housing

         Overlays                            None Applicable

         Assessment Type                     Concurrence Agency Referral




                                                                                       Page 51 of 123

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                23 JUNE 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 23 June 2015 regarding Application No. RAP15/0008 for a
Concurrence Agency Response for a detached house situated at 1 Overton Way, Kin Kin
and approve the application in accordance with the following conditions:

PLANNING
     When Conditions must be Complied With
1.   Unless otherwise stated, all conditions of this Concurrence Agency Response must be
     complied with prior to the use commencing, and then compliance maintained at all
     times while the use continues.
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following
     table unless otherwise amended by these conditions and annotations.
      Plan No.           Rev.   Plan/Document Name                          Date
      WD02               A      Site Plan, prepared by iphorm Building      May 2015
                                Designers
      WD03               A      Landscape Plan, prepared by iphorm          May 2015
                                Building Designers as annotated by
                                Council
      WD04               A      Ground Floor Plan, prepared by iphorm       May 2015
                                Building Designers
      WD05               A      Upper Floor Plan, prepared by iphorm        May 2015
                                Building Designers
      WD06               A      Elevations, prepared by iphorm Building     May 2015
                                Designers
      WD07               A      Elevations, prepared by iphorm Building     May 2015
                                Designers as annotated by Council
      WD08               A      Section 3, prepared by iphorm Building      May 2015
                                Designers
      WD09               A      3D, prepared by iphorm Building             May 2015
                                Designers
     Building Height
3.   The maximum height of the development must not exceed 8 metres above the finished
     ground level and the natural ground surface and 2 storeys.
     Performance Bond
4.   Security in the form of a cash bond or trading bank guarantee to the sum of $2,000
     must be submitted to Council within 28 days of the date of this Concurrence Agency
     Response to secure performance of all conditions of this approval. The cash bond or
     trading bank guarantee will be returned on performance of the conditions of approval
     less any costs incurred by Council in respect of enforcing performance of this permit.
     Council reserves the right to call upon the bond or guaranteed sum to effect
     compliance with conditions.




                                                                               Page 52 of 123

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  23 JUNE 2015


      Landscaping
5.    Existing trees on the site and within road reserves must be retained.
6.    Trees to be retained must be protected from construction activities by:
      a.   clearly marking vegetation to be retained with flagging tape
      b.   installing protective fencing around the drip line of the vegetation
      c.   restricting stockpiling, storage and vehicle parking to those areas which are
           already cleared
      d.   using low impact construction techniques around vegetation.
7.    Vegetation must be planted in accordance with the approved landscaping plan (and as
      annotated by Council) and in accordance with Council’s Planning Scheme Policy
      PSP3 Landscaping Plants and Guidelines. Additional landscaping consisting of
      Syzgium smithii, Syzgium francisii, Syzgium luehmanni or Brachychiton bella donna
      must be provided and include:
      a.   trees planted along both sides of the driveway from the house to the southern
           boundary at 2 metre centres
      b.   trees planted at 2 metre centres along the southern boundary starting from the
           driveway for the full length of the southern side of the house returning for a
           minimum of 3m to the north between the house and the shed, as annotated on
           the landscaping plan
      c.   three (3) Syzgium smithii planted along the northern boundary as annotated on
           the landscaping plans
      d.   minimum pot sizes of 200mm.
      Earthworks
8.    Earthworks required on site must be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
      ponding of water on any adjoining lands or concentrate or direct overland flow on to an
      adjoining property.
      External finishes
9.    Sunhoods (a minimum of 600mm deep) must be provided to all windows and doors not
      protected by the fly over verandah roof.
10.   Timber battening must be provided to the perimeter of the ground floor carparking area
      as annotated by Council on the approved plans.
11.   The house must be painted with muted environmental tones that blend with the natural
      environment, except for the corrugated iron which may remain as constructed.

      ADVICE
      Development Compliance Inspection
1.    Prior to the commencement of the use, please contact Council's Planning Assessment
      Department to arrange a Development Compliance Inspection.




                                                                                  Page 53 of 123

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               23 JUNE 2015


REPORT
1.    PROPOSAL
The applicant seeks an approval for a dwelling currently under construction. The dwelling
was pre manufactured in a Brisbane factory and transported to the site in halves then sited
on posts approximately 3m above the natural ground level. The dwelling is setback between
2.01m – 4.4m to the northern boundary and between 3.3 – 6.03m to the southern boundary
to Main Street.
The upper level consists of a kitchen, dining room, lounge room, 2 bathrooms and 3
bedrooms. The ground level includes a double carport, a bedroom, storeroom and lounge
area. The upper level covered 3 metre wide verandah runs along the length of the house
facing east with a set of split stairs centrally located. A small verandah accessed from the
laundry is located to the western (rear) side of the house. Eaves of approximately 0.35-
0.40m wide are present to 100% of the perimeter of the building together with 0.6m deep
window hoods. Figure 1 below shows the partially constructed dwelling from the east and the
west directions.




Figure 1 – The image on the left - view from the east and image on the right – view from the west.

The dwelling does not comply with the following self-assessable provisions of the Detached
House Code:
    S1.1- Setbacks
    S14.1 – Roof form (eaves)
    S15.1 – Streetscape and Character – Kin Kin village
The application is before Council because of the prominent location and the extent of the
setback relaxation sought and the concerns over the dwelling raised by the community.
2.    SITE DETAILS
2.1. Background
    The dwelling was granted a Building Approval on 11 September 2013.
    The Building Approval is unlawful as the dwelling does not comply with some of the
      self-assessable provisions of the Detached House Code.
    The pre-fabricated dwelling was transported and sited in accordance with the Building
      Approval.
    The dwelling remained onsite for a sometime prior to construction work commencing
    A complaint from a concerned resident led to an application to Council.
    Staff are currently preparing to lodge a complaint against the building certifier for the
      dwelling to the Queensland Building and Construction Commission.

                                                                                              Page 54 of 123

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                23 JUNE 2015


2.2. Site Description
The lot has a gentle slope from the west to the east toward the Overton Way frontage. There
is no vegetation on the land. A new shed is located in the south western corner of the lot.
2.3. Surrounding Land Uses
The site is located on the corner of Overton Way and Main Street Kin Kin. Overton Way
consists of large detached housing lots similar in shape and size to the subject site and
mostly developed with a range of ‘modern’ housing styles. Older well established
Queensland vernacular style buildings are located on the southern side of Main Street
including the Kin Kin school diagonally opposite the site.




Figure 2 - Subject Site highlighted in purple

3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   any Structure Plan or Master Plan in place for declared areas;
   any Preliminary Approval Overriding the Planning Scheme for the land;
   the Planning Scheme for the local government area; and
   any Temporary Local Planning Instrument in place for the local government area.

                                                                                Page 55 of 123

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    23 JUNE 2015


Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Regional Landscape and Rural Production area of the SEQ
Regional Plan and the proposal is consistent with the regional policies and Regulatory
Provisions of the SEQ Regional Plan.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Boreen Point, Kin Kin, and Cootharaba Locality and is
zoned Detached Housing. The proposed use is identified as a consistent use within the zone
and is required to undergo a code assessment application process, with Council acting as a
Concurrence Agency.
Land Use & Works Provisions
The Detached Housing Code regulates land use and design for this application. The
application has been assessed against the Code and the pertinent issues arising out of the
assessment are discussed below:
Setbacks
The dwelling is sited in accordance with the Building Approval providing a setback of
between 3.3m and 6m to Main Street. The Building Approval was unlawfully issued because
this setback distance does not comply with the Acceptable Solution, which requires a 6m
setback to street frontages. The encroaching part of the building is triangular in shape and is
shown in Figure 3 below.




Figure 3 – The red line shows the 6m setback and the purple outline shows the extent of the
encroachment.


                                                                                   Page 56 of 123

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


The dwelling does not comply with Acceptable Solution S1.1 and is therefore assessed
against Specific Outcome O1 which states:
Setbacks
O1 Buildings and other structures are appropriately designed and sited to —
a)      provide amenity for users of the premises as well as preserve the visual and acoustic
        privacy of adjoining and nearby land uses;
b)      preserve any existing vegetation that will buffer the proposed building from adjoining
        uses;
c)      allow for landscaping to be provided between buildings;
d)      maintain the visual continuity and pattern of buildings and landscape elements within
        the street;
e)      for class 10a structures, do not visually dominate the street;
f)      avoid any significant adverse impacts on the natural values of waterways and their
        foreshores, including those of the Noosa River and its lakes; and
g)      do not interrupt the natural cycles of erosion and accretion of waterways and
        foreshore areas.
Although the proposal creates overlooking of the northern neighbour, the building complies
with the required 2m side setback to that boundary.
The primary concern is the impact of the dwelling’s reduced setback will have on the Main
Street streetscape. The 2.7m encroachment into the setback is significant and the southern
building elevation (currently partially complete) provides a bulky and plain presentation to
Main Street and a poor built form outcome. Given the house has been erected in this
location, consideration must be given whether the setback relaxation is acceptable and the
works can be appropriately conditioned or if the house must be repositioned. Figure 4
provides an indication of the prominence of the building to Main Street.




Figure 4 - View from across Main Street.

                                                                                  Page 57 of 123

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  23 JUNE 2015


There are some aspects of the layout that are considered to support the proposal, being:
Orientated to comply
The gabled end (the shorter building elevation) is orientated towards Main Street being less
intrusive than if the building were orientated 90 degrees to comply with a 6m setback. The
90 degree orientation would present the rear or the full length of the building to face Main
Street (assuming the verandah would be orientated north). Figure 5 below shows the rear
elevation.
If the dwelling was rotated 90 degrees to comply, the living area and the whole verandah
would directly overlook the neighbouring property, whereas currently the orientation is
slightly less intrusive to the neighbour being a smaller portion of the verandah and 2
bedroom windows overlooking the neighbour.




Figure 5 - The rear elevation

Building encroachment
If the dwelling were setback 6m to comply (demolish the encroachment or a designed 2.7m
shorter building) the same gabled end elevation would present to Main Street. It is
considered this would only be a slightly better outcome because the same elevation would
present to Main Street but only setback a further 2.7m. Distinguishing this difference from
Main Street would be relatively difficult. Figure 6 below highlights the difficulty in
distinguishing the depth of the setback in relation to the streetscape.




                                                                                 Page 58 of 123

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015




Figure 6 - Boundary location and dwelling

Potential improvement to the elevation facing Main Street
The building is currently unfinished. Timber battening, window hoods and landscaping are
proposed to improve its appearance. The applicant has provided a landscape plan to
demonstrate planting will help soften the building appearance but the species list submitted
is not sufficient to effectively screen the building. Figure 7 and 8 below shows the as
proposed finished building.

                                                                                Page 59 of 123

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   23 JUNE 2015




Figure 7 - Proposed elevations




Figure 8 – Architectural rendering - 3D of the finished dwelling

                                                                   Page 60 of 123

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


Roof form
Acceptable Solution S14.1 b) of the Detached house Code requires 0.6m deep eaves to at
least 75% of the perimeter of the building. The dwelling has 100% eaves to the perimeter of
the building but only 34% being 0.6m deep or greater including the covered verandah. In
addition and in response to Councils Information Request, 0.6m deep window hoods were
included to all exposed windows.
Specific Outcome O14 seeks eaves to offer shading to the walls and provide attractive roof
forms.
The roof form (22 degrees) generally contributes positively to the skyline being a traditional
pitched roof with gable ends, but the narrow eaves to the west and south west provide
limited shading to the walls. The window hoods offer shading to the glass and provide some
solar benefit. Wider eaves would improve the dwellings appearance somewhat, but it is
considered removing the existing eaves and replacing them with wider eaves is not
warranted.
Streetscape and character –Kin Kin village
Acceptable Solution S15.1 states the following:
S15.1 If in Kin Kin village, buildings-–
a)     for the front elevation, have recessed or framed windows and doorways that are
       vertically proportioned and placed symmetrically in the building façade; and
b)     if more than 1 storey - have clearly defined floors by way of design features such as
       verandas or changes of materials or finishes.
The site has 2 frontages creating 2 front elevations. The elevation facing Overton Way when
finished meets most of the Code provisions except for recessed or framed windows. The
elevation facing Main Street does not comply having only 1 window and a blank corrugated
iron facade. Therefore it must be assessed against Specific Outcome O15 which states:
Streetscape & character–Kin Kin village
O15    For Kin Kin village, the predominant Queensland vernacular detached housing form
       is retained and enhanced by incorporating design elements reflecting or interpreting
       elements of this style of housing.
The Overton Way elevation has windows vertically proportioned and a set of traditional split
‘Queenslander’ type stairs, timber battening around the garage and corrugated iron as
external finishes which represent elements of the Queensland vernacular.
The Main Street elevation is devoid of any real design elements to reflect the Queensland
vernacular except for the use of corrugated iron and timber battening which also defines the
storeys. The presentation to Main Street, as discussed throughout the report, is currently
poor, but it is considered the elevation can be effectively screened and softened by
landscaping. Conditions are recommended accordingly.
4.    CONCLUSION
The dwelling, as currently constructed, presents poorly to Main Street and dominates the
streetscape. When finished, the house will provide an acceptable presentation to Overton
Way and with timber battening and landscaping will somewhat improve the Main Street
presentation. The as-constructed position is supported if screening vegetation is established
between the house and the Main Street boundary. The dwelling is therefore recommended
for approval subject to conditions.




                                                                                  Page 61 of 123

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            23 JUNE 2015


Departments/Sections Consulted:

   Community Services                   X   Planning & Infrastructure
   Disaster Management & Public Order       Building & Plumbing Services
   Waste & Environmental Health             DA Planning
   Community Facilities                     Strategic Land Use Planning
   Cultural Facilities                      Asset Design & Investigations
                                            Asset Planning
                                            Civil Operations
                                            Environment

   Executive Office                         Corporate Services
   Community Engagement                     Finance
   Customer Service                         ICT
   Executive Support                        Procurement & Fleet
   Governance                               Property & Facilities
   Human Resources                          Revenue Services




                                                                            Page 62 of 123

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 63 of 123

eS SS                                                                                                                                      U
                                         r.p.d.                                                                                                                                                                                                                         >
                                         lot 01 DP 1198266                                                                                                                                                                                                              =
                                         CNR OVERTON WAY AND MAIN STREET                                                                                                                                                                =                                Zz
                                         KIN KIN                                                                                                                                                                                                                         oO
                                                                                                                                                                                                                                   ’          500   |                   Qo
                                          .                                                                                                                                                                                                    \    {]
                                         site area 1688.5 SQ.M                                    540                         53.0                                520                                          -                                \                        oO
                                         site cover 205 SQ.M      11.9%                           v                            \                                   \                                            s                                ¥ |                    U
                                                                                                                                y                                                                                                                  i
                                             os                         -                         ‘                             \   8          72887 1023550        \                                           \                                  Vso                  ©
                                           ‘                                                                                      =                                  \                                                                             h                    >
                                               !                                                     _             :             1+               ‘
                                             |                            |                     a             peek                A                                     \                                         \                                   \                 wo
                                             /                            |                         4     ee     —                  i                !                   S                                         \                               |}  \                >
                                                                                           ESSER                                                      \                    \                     f                 \                                 >|                 +
                                            }                             |               /      oe                                     FILL          \                      \                   SEPTIC             \                              | =                  —=
                                            :                             !               Ren         \                                                                       \                   TRANSPIRATON                                     _                    9°
                                            |                             |               f       ,    4                                        _                               \                 a                  ‘                               Fa                 <
                                                                                            WWXA        _S                                   at \                                   \                                  \                                                 oO
                                                                           '                Be      iw                                   i      a                                    %                                  i       o>               |]                     =
                                                       .                   1  SOXBOSHED      (Ny                                                  a                                     \                 *               \     #8                                      =
                                                                           |                 <>, T'\__           PROPOSED RESIDENCE            ms          :                             \                                 \                      |                     4
                                                                            |                  es    )   1 \       FFL83 700                   ‘Sek       g                               \                                 \
                                                                                              K—KKA, oly     \     PAD LEVEL 53500          be       :     s. * >                          \                                 \                    |                     mn
                                                               ¢3          |                   DASA       1)                                    PROPOSED DRIVEWAY                          \                                   \                                        =
                                                                  Bi                          RES          1  |                              he             4m     at\                                                         \
                                                                a”         |                    RSs {      \                                  Ais 22 :    -       3   \                                                         \                                       m
                                                                 a         |                    KAS        1                                    2           aoe            ‘           92.767                   .              \     |            |                     m
                                                                                                 BRA            ;                              i             pga ee                           }                                   \                                     a
                                                                          |                         G Y,    \   a                               3            4    44: a                      /                                      a            |                      S
                                                                          |                          SQEAA                                        P                                         /
                                                                         |                                      a                                              Ee]                         /                                                    I                       >
                                                                                                             \<e3          ~       53599        1)            a                  WD      Z          an            _*%                |                                  o
                                                                        )                                   7                      2B   15"                Pe                    done) 7                                                                                @
                                                                       /                                    /                                   \                                      /                                                                                =
                                                                      /                   ~               ff                                    |                                     |                                                                                 S
                                                                     i                  EXISTING TREE     /         EXISTING TREE               \                         EXISTING TREE |
                                                                                                  }     ;       I                               Aeustins race          ff            \
                                                                                                      /                                        /
                                                                                          —                           —                      x             CROSS OVER       —
                                                                                                                                                                                                                                                           >
                                          SITE PLAN                                                                                                                                                                                                        cat
                                          SME bee                                              MAIN STREET                                                                                                                                                 =
 U                                                                                                                                                                                                                                                         oO            nN
 »                                                                                                                         ,
                                                                  PRINCIPAL DESIGNER LUKE STEPHENS            THIS DRAWING REMAINS THE PROPERTY. OF IPHORM Scale 1:200 C/O AXIS CERTIFICATION                                                     Sheet No, ae          o
°                                   fip hor mM                    eee                                        os movberan Nese 1S DCAD VE         me               LOT 1 OVERTON WAY KIN KIN                       SITE LAYOUT                    WD02      =            a
 °                                              Building Designers | M-ouasa7 58                              OM   PART WITHOUT WRITENPERUSSON   me      MAvaarS                                                                                           m            Cc
                                                                  A: 200 Daringion Drive Banora Point                           =               Issue   A         Job rumber                                                                               Z            >
 °                                                                                                                                                                                                                                                         =|           8
 =                                                                                                                                                                                                                                                         _            ho
 -                                                                                                                                                                                                                                                                      S
oo                                                                                                                                                                                                                                                                      o

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 64 of 123

z
                                                                                                                                                                                                                                                                                                                            >
                                                SPECIFICATION NOTES                                                                                               ‘6000                                                                            RA                                                                       =
                                                TEDOWINAND BRACING AS PER STRUCTURAL                       |                                                                                                                 1                     LX _ Iealacess panel                                                     =
                                                ENGINEERS’ DETAILS.                                                                                                                                                                                 s       indicates smoke detector                                        =
                                                WALL FRAMING                                              8                 5896                7B                5896                8                 5896                78                                                                                               za
                                                WALL FRAMING TO FRAMING                                    |                                    |                                     il                                    (|                    notes                                                                     oO
                                                NANUFACTUERES SPECIFICATIONS                                                                                                                      i           in            *                     {ito dor tobe fed owe
                                                INTERNAL LININGS                                                                                                                                                            tf                    2, smoke alarms to comply with BCA class 1810                            Qo
                                                ALLINTERNAL WALL AND CEILING LININGS                                                                            Go                                1                                                 patt’72and wth AS. 3786                                                 Oo
                                                GENERALLY TO BE PLASTERBOARAD.
                                                VILLABOARD TO WET AREAS TO BE TILED                                                                                        .        .                                                             8. bathroom windows fo be glazed obscure                                  0
                                                                                                                                                                                                                                                                                                                            >
                                                                                                                                                                                                                                                                                                                            =
                                                                                               |                                                                                                                                         |

                                                                                               5                                                                                                    STORE                                a                                                                                  °o
                                                                                                                                                                                                                                                                                                                            =
                                                                                                                                                                                        |                                                                                                                                   O
                                                                                        20     2—                                                                                      Bg } ——_|                                       =e.      &                                                                            Oo
                                                                                                                        CARPORT                            LOUNGE                                 a)                        |                                                                                               =
                                                                                                                                                                                                                                                                                                                            =
                                                                                               8                                                                                                     BED 04                 !            s                                                                                   |
                                                                                           ae                                                    Dt                                                                                      2k                                                                                 =
                                                                                                           !                                           “one                                                 “iow                                                                                                            m
                                                                                               z                                                                                                                                                                                                                            m
                                                                                                                                                                                                                                                                                                                            a
                                                                                                i                                                                                                                                                                                                                           >
                                                                                               g
                                                                                               -                                                                                                                                                                                                                            q)
                                                                                                 \         .                                     .                  ee                :                                     .                                                                                               >
                                                                                                           |                                     |             c-t-4                                                                                                                                                         Q)
                                                                                                                                                               rot-
                                                                                                          7                 5895                7                sie 4                7                 5885                B                                                                                               m
                                                                                                          f                                                    —                      m                                     m                                                                                               5
                                                                                                                                                              is   4   -                                                                                                                                                    0
                                                                                                                                                                                                                                                                           GROUND FLOOR AREA                                >
                                                                                                                                                                                                                                                                           GARAGE 47.7SQ.M
                                                                                                                                                                                                                                                                           GROUND FLOOR 96.3SQ.M
                                                GROUND                  FLOOR              PLAN                                                                                                                                                                            a
                                                                                                                                                                    DOB                                                                                                     144SQ.M
                                               SCALE 1:100
                                                                                                                                                                                                                                                                                                            >
                                                                                                                                                                                                                                                                                                            4
u                                                                                                                                                                                                                                                                                                           5
»                                                                                                                                                                            Scale   1: 100                                                                                                                                Pe
eo                                                                            PRINCIPAL DESIGNER LUKE STEPHENS                     TH DRANG FEMANS THE PROPERTY OF HOR                           C/O AXIS CERTIFICATION                                                                           sna, | oo
°                                            flehorm                          22=                                                  woe ee                     ee             me                  LOT VOVERTON WAVE Kn                                       GROUND FLOORPLIN                     wns        =|
                                                                .   J                                                             ANDO MAY NOT BE USED OR REPRODUCED IN WHOLE OR, Date MAY 2015,                                                                                                            m               Cc
o                                                       Building Designers    se enaen bl ,    Poid                                  ANY PART WITHOUT WRITTEN PERMISSION    Issue     A           Job number        .                                                                                       z
B                                                                                   ington Drive Banora Poin             |                                                                                                                                                                                  =               2
°                                                                                                                                                                                                                                                                                                           =               m
 >                                                                                                                                                                                                                                                                                                                          No
ND                                                                                                                                                                                                                                                                                                                          &
o                                                                                                                                                                                                                                                                                                                           oOo

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 65 of 123

U
                                                                                                                                                                                                                                                              i=
                                                                                                                                                                                                                                                              >
                                                                                              \                                           18000                                                                                                               S
                                                                                              a     2800    8                 154                78  1600 i 1000 78 1900 i      3000    i                                                                     2
                                                                                              #             +                                    #       if    +         t               4                                                                   QQ
                                                                                              8   1900 78        4000       78
                                                                                              #         {                   +            &                 ee                                                                                                Qo
                                                                                                                                           Dos                                                                                                                 oO
                                                                                                                                                                                                                                                              a
                                                                                                                                                                                                                                                              Q
                                                           1  eh                            pf    Ed                                                                                              ek—                                                         5
                                                                                               a             |               TM.                            Jol                          |                                                                    5
                                                                                                  (LJ                                                       GS                                                                                                =
                                                              g                                 _ |   KITCHEN                                       |      fF  Lt      Sl      Be        |        g                                                           4
                                                                                                                            DINING                    0                                                                                                       Oo
                                                              Br                                                                                                                   _                                                                          za
                                                         g|   =                                             ~                               |                            a                 |    8.     8                                                      QO
                                                              “                                   wR                                                                                                                                                          Q
                                                              re—                                                                                                    -                                                                                        =
                                                                                                     (4       MASTER BED                  LOUNGE                            BED 02                4                                                           =
                                                              g                            |     ENS                                                                                                                                                          4
                                                                                                                                                                                                                                                              m
                                                                                            Het El
                                                                                                                                       VERANDAH                                                                                                               m
                                                                                                                                                                                                  2                                                           m
                                                                                              |                                                                                          |                                                                    a
                                                                                              |                                                 a                                                                                                             z
                                                                                                                                        PS                                                                                                                    ©
                                                                                                                                      [i                                                                                                                      >
                                                                                              hom                 3600      78                ha                   78,50      $500      i                                                                     q)
                                                                                                                                        | ie   |                                                   VN     fool access panel                                   2
                                                                                                                                _        yp    ,      _                                             5     indicates smoke detector                            oO
                                                                                                                               |    |          HH       ue                                        tl                                                          >
                                                                                                                                 111i            1}   1}                                          1. liftoff doors to be fitted to we
                                                                                                                                         & 8                                                       part 3.7.2 and with AS, 3786.
                                                                                                                                                                                                  2. smoke alarms to comply with BCA class 1810
                                                                                                                                                                                                  3. bathroom windows to be gazed obscure
                                           UPPER FLOOR PLAN                                                                                                                                                                                     >
                                                   :                                                                                                                                                                                            4
                                           SCALE 1: 100                                                                                                                                                                                         4
 0                                                                                                                                                                                                                                              5     |       x
 »                                                                                                                                                :
©                                                              PRINCIPAL DESIGNER LUKE STEPHENS           Te ens teeene Wout               a 5   '         C/O AXIS CERTIFICATION                                                        sheet, | oo          ©
 ®                                  lip horm)                  2s:                                       meee                              |e      tam                                                    UPPERFLOOR PLAN =             WDO5.                 S
                                                                                                                                            awn            LOT 1 OVERTON WAY KIN KIN
 oO                                           Building Designers M4257 SE soma?                            ANY PART WITHOUT WRITTEN PERMISSION issue A      Job number    :
 a                                                                  ingion Drive Banora Point    |                                                        |                                                                           .         4             =
 °                                                                                                                                                                                                                                              a             m
 >                                                                                                                                                                                                                                                            N
 —_                                                                                                                                                                                                                                                            So
 NO                                                                                                                                                                                                                                                           —_
oO                                                                                                                                                                                                                                                            o1

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 66 of 123

uU
                                                                                                                                                                                                       rc
                                                                                                                                                                                                       >
                                                                                                                                                                                                       =
                                                                                                                                                                                                       =
                                                                                                                          =         r            600 deep window hoods                                 =
                                                                                                                 ZL                                                                                   q)
                              FOL                                  q                       eI =                                       Ss                                              :                20
                                                                                            L_E_'SST<CSCCxC£==————                     |                                                               ©
                                                                  8                                         SS                         |                                             §
                                                                  ~                                                            es    ——                                              ~
                               FFL                                 J                     Zi} === ==          SSSSSSSaa_=_——_a           SS SSS)                                       J                >
                              FO                                                   ge          [--—.— 1.                                            Jo                                                 a
                                                                               a4                              ro                                                                                      x
                                                                                    ZEA                        q
                                                                  g            |   IF                                                                                                z                 4
                                                                               it                             | |                                    _                                                 oO
                               FFL                                 I           =                               —                                    |                                 1                <
                               EAST ELEVATION                                             ave                                                                                                          g
                               “                                                                                                                         SersacacoaNNS                                 =
                                                            600 deep window hoods                                                                         ER  STRIPS WITH APPLIED PAINT FISH.          =
                                                            to all windows with no eaves                                                                  rue                                          |
                                                                                                                                  > SELECT COLORBOND C.G.), ROOF SHEETING                              m
                                                                                                                                                                                                       =
                                                     PC ALUM SLIDING DOORS &                                                                                                                           m
                                         FCL                                                                                           EY                                               J              za
                                                                    L              |__| SS =                 a         Ls            —       LJ                                                        q@
                                                                                   || |                     |                        Lt                                               g                >
                                                                                          Sis                                                                                                          q
                                         FFL                                      |       S|                “                                                                                          m
                                                                         ee              St                    tC                         —|                                            T              za
                                        FO                                 ys                  I                                            a                                                          oO
                                                                                                                                                                                      &
                                         n                            Pit] | | ft                                                                                                       |
                                                                      a |                                               ee
                              NORTH ELEVATION                                                                                                                                               >
                                                                                                                                                                                            4
 0                            SCALE 1: 100                                                                                                                                                  >
 »                                                                           .                              ;            ;                                 ;                         .      QO         nN
                                                  PRINCIPAL DESIGNER LUKE STEPHENS THS DRAWING REMAINS THE PROPERTY OF IPHORM Saale 1100 C/O AXIS CERTIFICATION                        sheet,          oo
‘®                          lip hocm ) 22:                                         vosmompremeccicases       om    S|     LOT 1 OVERTON WAY KIN KIN           ELEVATIONS              Woo =            cj
                                       Z          E:biotifemcomm                  ANO MAY NOT BE LSED OR REPRODUCED IN WHOLE OR Date MAY 2015                                               m          c
  oO                                Building Designers : Soe hive Banora Paid        ANY PART WITHOUT WRITTEN PERMISSION Issue A Job number .                                               z
 o                                                    :                                                                                                                                    Ss          za
 °                                                                                                                                                                                        am           m
  “=                                                                                                                                                                                                   nN
 ND                                                                                                                                                                                                    &
 oo                                                                                                                                                                                                    o

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 67 of 123

U
                                                                                                                                        rm
                                                                                                                                        >
                                                                                                                                        a
                                                                                                                                        =
                                                                                                                                        5
                       oes            AS                                                                                               oo
                                               a                      [+P         A   TO                                    a           Oo
                                              =                       +           |                                                     :
                                              —                                    §                               §                    QQ
                                             —————                    PT eReesesSesSsSs=i‘“‘(‘( i‘                                      5
                                              {ft} _} _                         aN SS
                                              |     SS         ee                   SC        ee                                        o
                                                      ee                                Qq_U                                            >
                                                     fe                                 sO   |                     2                    a
                                                     —S—S—S SSS                         SS
                                                     fe                                   h—H                                           Oo
                                                              a | ee      |                ;
                                                                     == TTT               fF                                            Q
                    WEST ELEVATION                                                              :                                       =
                    SCALE 1: 100                                                                                                        =
                                                                                                                                        m
                                                                                                                                        m
                                                                     nl                                                                 =
                                                                                                                                        m
                        FCL                                                                         ll            q                     m
                                                  Cy}                                                                                   5
                                                                 SSS ES      =——=    SS eS     So           * &  ~
                        FFL                       pa =                      = SSS                            °    |                     >
                                                  —                      eeSSSSMTSESsSesesesSses—‘i‘“‘i<                                q)
                                                  =                   Ya                                                                Z
                                                  SSS                   —
                                                 _————               ZA  ==N
                                               ——                   fb =I NCR.            Po                                            >
                        re <<                                        aA                            of
                                                               oT       I—      Se
                                                                    A    [I      N

                                                                                                                                 >
                    SOUTH ELEVATION                                                                                              =
0                   SCALE 1:100                                                                                                  3
                                                                                                                                        nN
9                                                                                                                                x
©                                 PRINCIPAL DESIGNER LUKE STEPHENS THIS ORANG FEMARS THE PROPERTY OF PHOFM = 1: 100 C/O AXIS CERTIFICATION Steet Na oO
®                  lip horm       #=                    orem,             [js  vers                        ELEVATIONS       wor m | &
                                                                           aunty = LCS. LOT 1 OVERTON WAY KIN KIN                =
o                       Building Designers u pean Dl senora Point ANY PART WITHOUT WRITTEN PERMISSION Issue A Job number .       z
 NX                               A220 igton Drive Banora Poit |          |                               |                |     4      a
°                                                                                                                                =      m
=n                                                                                                                                      ND
ND                                                                                                                                      &
o                                                                                                                                       o1

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           23 JUNE 2015


7                        DEVELOPMENT ASSESSMENT - UPDATE REPORT TO 31 MAY 2015
DOCUMENT INFORM AT ION




Author                             Manager, Planning & Environment, Kerri Coyle
                                   Planning & Infrastructure Department

Index                              ECM/Subject/ Branch Management /Planning and Infrastructure

Attachments                        Nil


EXECUTIVE SUMMARY
Not Applicable.

RECOMMENDATION
That Council note the report by the by the Manager, Planning & Environment to the Planning
& Organisation Committee Meeting dated 23 June 2015 providing an update on the activities
undertaken by the DA Planning Team for the period from 1 July 2014 to 31 May 2015.

REPORT
The purpose of this report is advise Councillors of activities undertaken by the DA Planning
Team for the period from 1 July 2014 to 31 May 2015.
The DA Planning Team undertake a range of activities primarily in relation to the
implementation of The Noosa Plan with requirements largely governed by the Sustainable
Planning Act 2009 (SPA). These activities include:
                       Provide Expert Planning & Engineering Advice
                       Manage the Assessment of Development Applications
                       Manage Appeals
                       Development Construction Compliance
                       Development Audit & Compliance
                       Provide Written Searches, Certificates & Advice
                       Local Law Signage
                       Infrastructure Planning and Charges

1.                       FINANCE
The budget for Development Assessment includes three major revenue streams including
development application fees, searches and infrastructure fees, with infrastructure charges
being a capital contribution.
For 2014-15, revenue from applications and searches exceeded budget by $122,341 as at
31 May 2015. Expenditure also exceeded budget by $57,995 at 31 May 2015 primarily due
to legal costs for appeals and compliance matters which is difficult to anticipate and forecast.
The net result being $64,346 favourable against budget.




                                                                                          Page 68 of 123

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           23 JUNE 2015


Development Assessment

                   Development Assessment Year to Date 31 May 2015

                                    Actual       Budget       Variance       Budget Full
                                     YTD           YTD         (YTD)            Year
Total Revenue                     $1,054,424     $932,082      $122,341          $990,607
Total Expenditure                 $1,974,919    $1,916,924      -$57,995       $2,073,036
Net Operating
Surplus/Deficit                    -$920,495     -$984,841        $64,346     -$1,082,429
Internal Charges                    $420,511      $421,446           $935        $459,759
                                           -             -
Total Surplus/Deficit             $1,341,006    $1,406,287        $63,411     -$1,542,188



                    Development Assessment May 2015
 $2,500,000
 $2,000,000
 $1,500,000
 $1,000,000
                                                                              Actual YTD
   $500,000
                                                                              Budget YTD
         $0
  -$500,000       Total Revenue      Total Expenditure   Net Operating
                                                         Surplus/Deficit
 -$1,000,000
 -$1,500,000


Infrastructure Charges


               Infrastructure Planning Assessment Year to Date 31 May 15

                                                 Budget      Variance       Budget Full
                              Actual YTD          YTD         (YTD)            Year
Total Revenue                      $4,253              $0        $4,253              $0
Total Expenditure                $136,615        $143,925        $7,311        $157,973
Net Operating
Surplus/Deficit                    -$132,362    -$143,925       $11,564       -$157,973
Internal Charges                     $31,179      $31,179            $0         $34,013
Capital Revenue                   $1,564,721   $1,733,668     -$168,947      $1,887,260
Total Surplus/Deficit             $1,401,180   $1,558,564     -$157,384      $1,695,274




                                                                                           Page 69 of 123

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            23 JUNE 2015



                 Infrastructure Planning Assessment May 2015
     $200,000
     $150,000
     $100,000
      $50,000
                                                                              Actual YTD
           $0
                   Total Revenue   Total Expenditure   Net Operating          Budget YTD
     ($50,000)
                                                       Surplus/Deficit
 ($100,000)
 ($150,000)
 ($200,000)

Overall the Development Assessment budget for 2014/15 is in a sound position as at 31 May
2015. In the future, it is proposed to develop this financial reporting further to include cost
revenue analysis of each activity undertaken for Development Assessment. This will identify
whether generally Council is achieving full cost recovery for services for which Council can
reasonably apply a charge. It will also identify the community service obligation component
of the budget being activity for which no revenue is received such as general enquiries,
compliance action against breaches of development approvals and the planning scheme,
development appeals, infrastructure charges planning etc.
Waiver or Partial Waiver of Development Application Charges
Council’s adopted Fees and Charges include a provision for the Director, Planning and
Infrastructure to “partially or wholly waive a development fee where strict application of the
schedule fee is obviously unreasonable for the type of application being received.”
The tables below set out a summary of each application where a partial waiver of the
development application fees was granted for the period 1 January 2015 to 31 May 2015.
There were 6 fee variations in this period.

Application No      Applicant            Application Details        Fees & Charges         Fee
                                                                    Policy                 proposed

MCU15/0005          Northern             Application for            $23,760                $7920
                    Property Group       Industrial Business
                                         Type 1 Warehouse
                                         and Type 2
                                         Production
                                         11/100 Rene St
                                         Noosaville
The applicant requested a fee variation for an Industrial Use application, specifically
requesting that the inconsistent fee multiplier of 3 not be applied.
The multiplier was considered excessive for the following reasons:
   A proposed amendment to the planning scheme will make the use a consistent use in
     the E3 precinct of the Shire Business Centre. The site is in Rene St adjacent to Noosa
     Civic and the existing industrial area.
   The site, prior to subdivision has approval for Industrial use, however, the approval for
     this specific site is for Adult Education, requiring this application.
Under the circumstances it was recommended that the fee variation be approved.

                                                                                           Page 70 of 123

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015




Application No     Applicant        Application Details     Fee & Charges      Fee
                                                            Policy             proposed

MCU15/0026         Lend Lease RL    Application for         $17,163            $3,587
                   (Noosa           Multiple housing Type
                   Outlook) Pty     3 – Retirement and
                   Ltd              Special Needs

The applicant requested changes to an existing development to create a total of 38
additional bedrooms within 15 existing duplex dwellings in the Noosa Outlook retirement
village. The proposed changes were well below the population density established under
the planning scheme for the site. The proposal would be a permissible change to an existing
approval under normal circumstances, however, as the site was the subject of several
rezoning approvals there was no development approval to change.
The applicant was therefore required to lodge an impact assessable Material Change of Use
where the application fee under the Fees & Charges Schedule would be $17,163. The fee
for a Permissible Change (more substantial matter) to a development approval is $3587 and
was considered the appropriate fee in this instance.
Under the circumstances it was recommended that the fee variation be approved.


Application No     Applicant        Application Details     Fees & Charges     Fee
                                                            Policy             proposed

MCU15/0025         Pi Home Pty      Multiple housing Type   $19,665            $6555
                   Ltd              4 – Conventional 3
                                                            Inconsistent
                                    units
                                    41 Belmore Tce
                                    Sunshine Beach

The site contains an older 3 unit development and the application seeks to make extensive
changes to one of the existing units only. The other two remain unchanged. It does not
constitute a permissible change and the application was required to be lodged as an
inconsistent impact assessable application with a fee of $19,665.
The proposed extension to the unit would increase the Gross Floor Area (GFA) on site and
this may be out of character with the surrounding development given the scheme now only
supports duplex dwellings in the area. However, review of the existing development in the
area will be required to determine the extent of any impacts.
Under the circumstances the fee for a multiple dwelling is excessive and it was considered
that the fee for 1 unit $2185 x 3 for inconsistent use apply ($6555)




                                                                                 Page 71 of 123

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      23 JUNE 2015



Application No      Applicant         Application Details         Fees & Charges     Fee
                                                                  Policy             proposed

OPW15/0056          ET Cheetham       Earthworks for filling      $1575              $834
                                      803 Cooroy Noosa Rd
                                      Lake Macdonald

The application is for earthworks on a vacant rural property where the owner will fill for a
future house site and shed pad. Council has no detailed flood data for the site and the
proposal is to fill approximately 1m to achieve the 100m AHD (the code states that building
or structures not be located below 98.5m).
It is apparent that limited assessment of the filling is required and the inclusion of conditions
relating to truck movement and sediment & erosion control are considered to be sufficient.
Under the circumstances it was recommended that the base fee of $834 be applied in this
instance.


Application No      Applicant        Application Details        Fees & Charges     Fee
                                                                Policy             recommended

REC13/0094          R & M Bourne     OPW application to         $1688 + 2 lots     $1688
                                     be lodged (only for        @ $505
                                     Access)

The Reconfiguring a Lot approval was for a 2 staged development creating a total of 3 lots (1
full frontage and 2 from an access handle) The approval called for an Operational Works
application for Electrical reticulation and access only. The applicant has completed Stage 1
and is preparing to lodge an application for the Access component in conjunction with Stage
2. The applicant has indicated they have the relevant Energex clearance for Stage 2.
The applicant requested a fee variation. The relevant fee for OPW for all works (i.e. drainage,
stormwater, landscaping etc.) in conjunction with a REC is as above. As the assessment will
be limited to the access requirements only, it was recommended that the base flat fee apply,
which provides a waiver of $1010 for the 2 lots.


Application Nos     Applicant         Application Details      Fees & Charges    Fee
                                                               Policy            recommended

132007.742.05 &     Wolter            Request to extend        $2303 x 2         $2303 x 1 plus
132008.1779.01      Consulting        relevant period of                         $166 x 1
                    Group             both applications                          administration
                                                                                 fee
The original approvals are for Visitor Accommodation Type 4 (Stage 1 & 2 Beach Rd
Retreats) and the applications seek to extend the relevant period of a Development Permit
for Stage 1 and a Preliminary Approval for Stage 2 by 4 years in each case. Both approvals
are similar in terms of content and associated issues and can be assessed concurrently.
The applicant has requested a fee reduction so only one fee applies for assessment of the
two applications. Under the circumstances it was recommended that only one fee apply to
the two applications and an administration fee of $166 apply for the second one for the
additional administration involved. This administration fee is the fee specified to cover
administration of refunds where an application is withdrawn.

Based on these variations to the development charges, a review of the fees and charges is
not considered warranted at this time.

                                                                                     Page 72 of 123

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   23 JUNE 2015


2.   CUSTOMERS
Application & Search Numbers
The following table identifies the total number of applications and searches lodged as at 31
May 2015. It also includes an estimate of the number of counter and phone enquiries taken
for this period, which is based on recording the number of enquiries over a 2 week period.

DESCRIPTION                                           JULY 14 – MAY 15
Applications
Material Change of Use                                68
Reconfiguring a Lot                                   18
Operational Works                                     86
Operational Works (Veg Removal)                       109
Preliminary Approval for Building Works               22
Referral Agency                                       40
Pre-lodgement Meetings                                35
Plan Sealing                                          37
Searches/Certificates/WA
Flood Search                                          411
Planning & Development Certificates                   170
Written Advice                                        53
Property Development Notes                            179
General Enquiries – based on 2 week period
Counter Enquiries                                     234 counter enquiries
Phone Enquiries                                       12,320 calls
Appeals
Since de-amalgamation there have been a total of 13 appeals over development matters in
the Noosa area, a number of which commenced with Sunshine Coast Regional Council.
Four appeals have been settled, including Sundale Garden Village’s proposal at McKinnon
Drive, Tewantin, with 2 appeals including Makepeace Island and the Multispan’s proposal for
Peregian Beach Bowls Club withdrawn.
There have been four matters go to trial since 1 January 2014 including the compensation
claim relating to Settlers Cove land, Masters proposal at the Shire Business Centre and 2
housing matters with the Building & Development Committee. Three appeals remain
current, including:
   Northbrook Corporation Pty Ltd - Noosa on Weyba development
   DW Neate – Application to extend the relevant period of a development approval for
     Attunga Heights, Noosa Heads
   Sharpe – Application for Self Storage Units and Signage in Rene Street, Noosaville

Appeals            Appeals       Appeals         Appeals that        Current Appeals with
Lodged             Settled       Withdrawn       went to Trial       Council
13                 4             2               4                   3
Development Audit and Compliance
The table below identifies the number of development related compliance matters that were
investigated up to 31 May 2015. An estimate of the number of audits carried out on newly
completed developments is also highlighted.
Notably, an audit of the Noosaville Industrial Estate is currently underway and at the time of
writing this report over 340 property visits had been completed, being more than 50% of the
Noosaville Industrial Area.

                                                                                  Page 73 of 123

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                               23 JUNE 2015


                     July to Sept          Oct to Dec 2014       Jan to Mar 2015        April to May
                     2014                                                               2015
COM*                 13                    4                     18                     6
RM*                  29                    27                    38                     15
Audits               25 (estimate)         25 (estimate)         25 (estimate)          25 (estimate)
* COM is the Tech 1 reference used for compliance/breach matters
* RM is the Tech 1 reference used for management of customer requests. RMs recorded here are only those
enquiries received which relate to compliance breaches.

3.    PEOPLE
The Development Assessment Area currently has 15.5 equivalent persons in the team to
deliver the range of activities, including 3 planners, 2 engineering officers and 1
infrastructure plan and charges officer.
The activities undertaken by Development Assessment are currently delivered
predominantly internally with specialist consultants engaged dependant on the application
assessment requirements including hydrology, economic, environmental (odour) and noise.
Staff are currently fully engaged in the team’s activities with some lag time experienced
during times of leave and difficulties in completing new initiatives. Towards the end of this
calender year one planner will be commencing long service leave for 3 months and during
this time it is proposed to engage a planning consultant on as needs basis to maintain
reasonable service levels.

4.    SYSTEMS & PROCESSES
A Service Review of the DA Planning team was undertaken in 2014-15 and completed in
February this year. This Service Review developed an Action Plan which identified up to 30
recommendations, including the development of customer friendly information on regular
development enquiries, development of key performance indicators and regular reporting,
use of planning staff as expert witnesses on minor appeal matters, improved practices for
involving infrastructure officers in assessment and on and off maintenance inspections,
improved procedures for acting on non-compliances with construction activities and
investigation into the use of infringement notices for development offences.
As part of this review feedback was sought from the DA Consultants Group on the team’s
performance and from staff. Feedback from the DA Consultants group indicated generally a
high level of satisfaction; time frames for assessment were good and the Council was seen
as very approachable and communicating well with applicants. However, both the DA
consultants and officers considered the current corporate technology systems required
improvement and were impacting on customer service generally and efficiencies. Some
general internal improvements were also identified such as refining Operational Works
conditions, clearer process for provision of draft conditions (considered highly desirable by
the DA Consultants Group) and updating of standard drawings for civil works.
Work on the Service Review Action Plan has commenced with review of the Operational
Works conditions expected to be completed in July, involvement of infrastructure officers in
assessment and pre on maintenance inspections underway and attendance as an expert
witness by officers at the Building & Development Committee appeal hearings already
occurring.
Previous Council Consideration
Nil
Finance & Risk
Refer to Section 1 - Finance



                                                                                              Page 74 of 123

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               23 JUNE 2015


Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Management Accountant - Finance

Departments/Sections Consulted:

      Community Services                   x   Planning & Infrastructure
      Disaster Management & Public Order       Building & Plumbing Services
      Waste & Environmental Health         x   DA Planning
      Community Facilities                     Strategic Land Use Planning
      Cultural Facilities                      Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

      Executive Office                     x   Corporate Services
      Community Engagement                 X   Finance
      Customer Service                         ICT
      Executive Support                        Procurement & Fleet
      Governance                               Property & Facilities
      Human Resources                          Revenue Services




                                                                               Page 75 of 123

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                             23 JUNE 2015


CORPORATE SERVICES DEPARTMENT REPORTS
Finance
8                     MAY 2015 FINANCIAL PERFORMANCE REPORT
UMENT INF ORM ATION




Author                        Manager Financial Services, Wayne Jensen
                              Corporate Services Department

Index                         ECM / Subject / 22.09 – Monthly Exception Report

Attachments                   1.    Statement of Comprehensive Income
                              2.    Statement of Financial Position
                              3.    Capital Works Schedule


EXECUTIVE SUMMARY
Overall financial performance for the 11 months to 31 May 2015 shows a positive
year-to-date variance against budget, with both operating revenue and expenditure above
and below year to date (YTD) budget respectively. There will be changes to some forecasts
associated with the third quarterly review, shown as Forecast Budget in the attached reports.
There have also been minor changes to the capital works program in the review, and there
are some projects expected to carry forward into the first part of the 2015/16 financial year
for completion.

         Financial Performance Summary
                               Current                YTD       Variance       Variance    Status
                                  YTD               Actual           $m            YTD
                               Budget                  $m                            %
                                   $m
         Recurrent Revenue       $81.7               $83.0            $1.3        1.6%    On track
         Recurrent Expense       $74.4               $71.3            $3.1        4.2%    On track

         Capital Revenue                  $4.0        $3.8            $0.2        4.5%    On track
         Capital Expenditure             $17.6       $11.9            $5.7       32.3%     Watch

Interim financial statements including Statement of Comprehensive Income and Statement
of Financial Position are included as attachments for information of Council.

Figure 1: Actual Performance Compared to YTD Budget
                $90
                $80
                $70
                $60
                $50
                $40
                $30
                $20
                $10
                 $-
                             YTD Budget ($m)                 YTD Actual ($m)

                               Operating Revenue   Operating Expenditure



                                                                                            Page 76 of 123

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


RECOMMENDATION
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 23 June 2015 providing the May 2015 monthly
financial performance report for the 2014/15 financial year.

REPORT
Recurrent Revenue
Council has received 97% ($83 million) of its recurrent revenue budget of $85 million as at
the end of May 2015. Note that reporting category changes have been made to satisfy audit
requirements, with some elements previously included as Fees and Charges now shown
under Sale of Goods and Major Services. Commentary on each recurrent revenue type is
provided below:

        Rates and Levies – $59.3m (99.8%) of the annual revenue budget of $59.4m has been
          recognised now the July 2014 and January 2015 rates and levies have been issued
          (note that there are minor changes to waste charges included in the March Quarter
          Budget Review).
        Fees and Charges – Fees and charges earned ($4.3m) totals 94% of the full year
          budget (compared to the YTD benchmark of 92%). Development related fees,
          cemetery fees and search fees remain ahead of forecasts, but this is offset by revenue
          under recovery in some other fee lines. Significant variances have been identified and
          included in the March quarter budget review.
        Interest Received – Remains ahead of forecast due to higher levels of cash available
          for investment and has been amended with the budget review.
        Dividend and Tax – Dividends and the payment of tax equivalent from Unitywater are
          in line with budget forecasts.
        Other Revenue – Generally in accordance with budget predictions, with sale of
          recyclables continuing to track above budget. Significant variances have been included
          in the quarterly budget review.
        Grants and Subsidies – Overall receipts to date for operational grants are in
          accordance with budgeted levels.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)
 $10
     $9
     $8
                                        YTD Budget ($m)
     $7
     $6                                 YTD Actual ($m)

     $5
     $4
     $3
     $2
     $1
     $0
                                                          Other
               Fees




                                                                     Grants
                          Dividend




                                                  Tax
                                     Interest




                                                                                    Page 77 of 123

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     23 JUNE 2015


Recurrent Expenditure
YTD operating expenditure is currently 86% of fully year budget spend compared to the YTD
benchmark of 92%. Detailed commentary for significant items appears below.
 Employee Costs – YTD actuals of $23.8m equates to 86% of the full year budget being
   expended, compared to the YTD benchmark of 92%. A number of current staff vacancies
   in addition to training costs lagging YTD budgeted expenditure are contributing to the
   positive YTD variance of $1.1m.
 Materials and Services – 77% of YTD budget ($29.4m) has been expended compared to
   the YTD benchmark of 92% ($31.4m). Contract services costs are behind YTD budget
   levels, with a number of significant variances adjusted as part of the March budget
   review.
 Finance Costs – generally in accordance with budget, and with the credit card surcharge
   applying from January, there has been a favourable impact on the net cost of merchant
   fees, which is reflected with adjustments in the budget review.
 Depreciation expenses are currently running in accordance with budget forecasts.
 Other Expenses – generally in accordance with budget.

Figure 3: Recurrent Expenditure Position by Type
 $35

 $30
                                                      YTD Budget ($m)
 $25
                                                      YTD Actual ($m)
 $20

 $15

 $10

  $5

  $0
                         Materials




                                      Finance Costs




                                                              Depreciation
            Employees




                                                                             Other




Capital Works Program
Year to date actual capital expenditure (excluding commitments) is $11.9 million against a
revised YTD budget of $17.6 million. Detailed discussion of progress in the delivery of the
capital works program is provided periodically to the Infrastructure and Services Committee.
The attached schedule of capital works shows the financial performance detail for each
program and project for actual costs incurred. The report to the Infrastructure and Services
Committee will also include committed costs (i.e. purchase orders) which as at 31 May 2015
totalled $15.4 million.

Cash Management and Investment Performance
Council funds are invested in accordance with the adopted Investment Policy. Total cash on
hand as at 31 May 2015 was $58.2 million (year-end cash holdings are projected at
approximately $33 million, though this will be increased by any unexpended funds from the
capital works program and operating budget including special levies).




                                                                                     Page 78 of 123

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        23 JUNE 2015


Council’s investment portfolio is balanced across a number of agencies, as shown in the
graph on the left. The graph on the right shows the current risk profile using industry credit
ratings.

Suncorp    Bendigo                                                           A2
 10%         3%                                                              4%
   Westpac
                                                                                   A1
     4%
                                                                                  10%
                                           QTC                                            A1+
                                           43%                                           (QTC)
               NAB                                                                        43%
               14%

                                                                              A1+
                                                                             (Other)
                         CBA                                                  43%
                         26%




The actual interest revenue for the month was $143,780 with a weighted average yield of
2.80% against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 2.38%.

Previous Council Consideration
Nil

Finance & Risk
The budget review undertaken after the 3rd quarter has resulted in an improved operating
result, with the forecast surplus increasing from $50k to $103k. This conservative forecast is
expected to be surpassed with special levies unlikely to be fully expended within the year,
with any unspent funds being quarantined in restricted cash reserves for future expenditure.

Consultation

External Consultation - Community & Stakeholder
Nil

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

x     Community Services                         x   Planning & Infrastructure
      Disaster Management & Public Order             Building & Plumbing Services
      Waste & Environmental Health                   DA Planning
      Community Facilities                           Strategic Land Use Planning
      Cultural Facilities                            Asset Design & Investigations
                                                     Asset Planning
                                                     Civil Operations
                                                     Environment

x     Executive Office                           x   Corporate Services
      Community Engagement                           Finance
      Customer Service                               ICT
      Executive Support                              Procurement & Fleet
      Governance                                     Property & Facilities
      Human Resources                                Revenue Services

                                                                                        Page 79 of 123

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     23 JUNE 2015


                                                   Attachment 1




                                                    Page 80 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                           23 JUNE 2015

                                                                                                                      Attachment 1

    Noosa Council
    Statement of Comprehensive Income
    For the Year Ended 30 June 2015
    As at 31-May-2015
                                                             Current          Forecast          Current
                                                             Budget            Budget            Budget            Actual         Percentage
                                                              2015              2015              YTD               YTD          Annual Budget
                                                                $                 $                 $                 $                %

    Revenue
         Recurrent Revenue
         Rates, levies and charges                             59,447,555        59,447,555        59,447,555        59,337,897             100%
         Fees and charges                                       4,601,334         4,601 334         4,187,291         4,346,597              94%
         Dividend income                                        2,065,092         2,065,092           920,288          920,288               45%
         Interest received                                      4,707,000         4,707,000         3,902,833         4,164,190              88%
         Tax equivalents                                          775,526           775,526          475,712           516,649               67%
         Sale of Goods and Major Services                       6,724,128         6,724,128         6,239,397         6,606,861              98%
         Sale of Contract & Recoverable Works                      87,054            87,054            86,721           113,101             130%
         Rental & Lease Income                                  1,097,810         1,097,810          999,709          1,047,304              95%
         Other income                                             649,396           649,396         486,879            941,936              145%
         Grants, subsidies, contributions and donations         4,976,512         4,976,512         4,921,812         4,998,144             100%
                                                               85,131,406        85,131,406        81,668,198        82,992,968              97%
    Expenses
         Recurrent Expenses
         Employee benefits                                     27,690,256        27,690,256        24,889,838        23,794,694              86%
         Materials and services                                38,007,891        38,007,891        31,427,814        29,417,639              711%
         Finance costs                                          2,524,711         2,524,711         2,335,885         2,252,299              89%
         Depreciation and amortisation                         16,079,160        16,079,160        14,971,094        14,974,600              93%
         Other expenses                                           779,000           779,000           773,433          821,776              105%
                                                               85,081,019        85,081,019        74,398,063        71,261,007              84%

    Operating Result                                               50,387            50,387         7,270,135        11,731,960
    Capital Revenue
         Capital contributions and donations                    1,843,100         1,843,100         1,689,508         1,670,561              91%
         Grants, subsidies, contributions and donations         3,458,610         3,458,610         2,091,599         1,923,360              56%
         Other capital revenue                                    318,000           318,000          226,417           232,768               73%
    Capital Expenses
         Capital Expenses                                               -                 -                 -          358,034
    Net Result                                                  5,670,097         5,670,097        11,277,659        15,200,616
    Other Comprehensive Income
      Increase / (decrease) in asset revaluation surplus                -                 -                 -                 -
      Other Comprehensive Income                                        -                 -                 -                 -
    Total Other Comprehensive Income                                    -                 -                 -                 -
    Total Comprehensive Income                                  5,670,097         5,670,097        11,277,659        15,200,616

                                                                                                                          Page 80 of 123

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     23 JUNE 2015


                                                   Attachment 2




                                                    Page 81 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                     23 JUNE 2015

                                                                                                                 Attachment 2

             Noosa Council
            Statement of Financial Position
            For the Year Ended 30 June 2015

                                                                                                Consolidated
                                                                                       2015                     2014
                                                                                         $                       $
            Current Assets
                  Cash and cash equivalents                                               55,807,639              28,893,011
                  Trade and other receivables                                              6,648,706              16,112,118
                  Inventories                                                                105,259                 103,425
                  Other current assets                                                       509,080                2,789,285
                                                                                          63,070,685              47,897,840
                  Non Current Assets held for sale                                                  -                       -
            Total Current Assets                                                          63,070,685              47,897,840

            Non Current Assets
                  Trade and other receivables                                             49,217,517              49,217,517
                  Other non current Assets                                                          -                       -
                  Investments                                                             60,978,225              60,978,225
                  Investment property                                                               -                       -
                  Property, plant and equipment                                          869,943,507             873,447,529
                  Intangible assets                                                        2,341,848                2,268,600
            Total Non Current Assets                                                     982,481,097             985,911,871

            Total Assets                                                               1,045,551,782            1,033,809,711

            Current Liabilities
                  Trade and other payables                                                 5,419,164                6,764,915
                  Borrowings                                                               2,682,149                2,600,397
                  Provisions                                                               4,424,103               4,358,384
                 Other                                                                     1,575,182                 831,040
            Total Current Liabilities                                                     14,100,597              14,554,735

            Non Current Liabilities
                  Trade and other payables                                                          -                       -
                  Borrowings                                                              35,721,627              38,576,627
                  Provisions                                                               8,216,341                8,216,341
            Total Non Current Liabilities                                                 43,937,969              46,792,969

            Total Liabilities                                                             58,038,565              61,347,703

            Net Community Assets                                                         987,513,217             972,462,008
                                                                                 q—~K_i—~{<&<&{qJ &—*—K*z&=—a—&<*—*——eEEEZS[ q—_q—=~«q~—D—RX—<——$—£<—aSEK=—E
            Community Equity
                  Asset Revaluation Surplus                                                         -                       -
                  Retained Surplus / (Defeciency)                                                   -                       -
                  Shire Capital                                                          972,312,601                        -
                  Current Year Net Earnings                                               15,200,616             972,462,008
            Total Community Equity                                                       987,513,217             972,462,008

                                                                                                                    Page 81 of 123

Section 82

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA     23 JUNE 2015


                                                   Attachment 3




                                                    Page 82 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                23 JUNE 2015

                                                                                                                                           Attachment 3

                   Noosa Council
                   Capital Works Schedule
                     As at: 31-May-2015
                                                                                                  Original     Current        Future    Year To Date      % of Annual
                        Project                                                                     Budget     Budget        Budget           Actual    Budget Spent
                   Bridges
                         100718 - Forward design for bridge rehab program                                  0       10,500      10,500           11,300         107.62%
                         100719 - Noosa Parade Munna Point Bridge - Investigations and interim             0      185,100     185,100           17,301           9.35%
                         500002 - Whole of Shire - annual bridge inspect                              20,000       20,000      20,000           20,756         103.78%
                         500003 - Noosaville - Munna Point Bridge Stage 2                          1,401,000    1,401,000    1,401,000          22,632            1.62%
                         500204 - Girraween Bridge Joint Replacement                                       0      50,000      50,000           41,065           82.13%
                                                                                  Total Bridges    1,421,000    1,666,600    1,666,600         113,054           6.78%
                   Coastal Canals and Waterways
                         100721 - Gympie Terrace and William Street Revetment wall and pathway             0       37,100      37,100           29,073          78.36%
                         100725 - Noosa Waters revetment walls - Stage 2a                                  0     46,910        46,910         46,910           100.00%
                         500004 - Noosaville - Gympie Tce / Williams St                               40,000      60,000       60,000            7,681          12.80%
                         500005 - Sunshine Beach - beach access 35                                    65,000      35,696       35,696          36,249          101.55%
                         500006 - Teewah Beach - southem dunal restore                                20,000       14,656      14,656           15,010         102.42%
                         500007 - Noosaville - Gympie Tce Foreshore                                   80,000     80,000        80,000           62,089          77.61%
                         500008 - Noosa Main Beach - Sand pumping pipe                               50,000      50,000        50,000           27,421          54.84%
                         500071 - Noosa Waters - scour protection stage 2b                         1,250,000    1,400,000    1,527,932       1,532,608         109.47%
                         500109 - Munna Point Foreshore Stabilisation                                      0      105,000     105,000           37,400          34.71%
                                                             Total Coastal Canals and Waterways    1,505,000    1,829,363    1,957,295       1,794,841          91.70%
                   Cemeteries
                         500069 - Pomona Cemetery - niche wall                                         7,500        7,500       7,500            3,936          52.48%
                         500070 - Tewantin Cemetery - concrete beam                                    5,500        5,500       5,500            3,565          64.82%
                                                                               Total Cemeteries       13,000       13,000      13,000           7,501           57.70%
                   Commerical Land and & Property
                         500102 - Peregian Beach Land Acquistion                                           0     788,771      788,771         789,382          100.08%
                         500111 - Rufous St Precinct Redevelopment                                         0      130,000     130,000          144,290         110.99%
                         500207 - Rufous St Design & Development Phase                                     0           0      50,000             4,500           0.00%
                                                          Total Commerical Land and & Property             0     918,771      968,771         938,172           96.84%
                   Community Facilities
                         100726 - Peregian Surf Club Public Amenities - Planning & Design                  0       14,800      14,800               0            0.00%
                         500009 - Noosa Leisure Centre — design and detail                            10,000       10,000      10,000            4,966          49.66%
                         500010 - Kookaburra Park Public Amenities                                    55,000       55,000      55,000           27,766          50.48%
                         500011 - Mill Place Boiler House - stage 2                                  100,000      100,000     100,000           2,700            2.70%
                         500012 - Noosa Aquatic Centre - pool cleaner                                 20,000       13,352      13,352           13,352         100.00%
                         500013 - Noosa Leisure Centre - concertina door                              25,000           0        9,464            9,464           0.00%
                         500014 - Noosa Library and NLC Plumbing                                      40,000      40,000       40,000            2,285           5.71%
                         500015 - Sunshine Beach Skate Park - block wall                              22,500       26,499      26,499           27,533         103.90%
                         500016 - Whole of Shire - community light poles                             155,000       75,000      75,000               0            0.00%
                         500017 - Whole of Shire- public toilet / sewerage                            35,000           0            0               0            0.00%
                         500018 - Cooroy Butter Factory - condition assess                             5,000           0            0               0            0.00%
                         500019 - Noosa Leisure Centre -upstairs flooring                             60,000           0            0               0            0.00%
                         500020 - Noosa Regional Gallery - access                                     45,000     48,460        48,460           10,000          20.64%
                         500021 - Noosa Respite Centre - internal refurb                             150,000      150,000     250,000           11,134           7.42%
                         500072 - Noosa Heads - lifeguard storage survey                              75,000           0            0            4,209           0.00%
                         500073 - Tait Duke House - relocation                                       80,000       80,000       80,000           19,980          24.97%
                         500088 - Noosa Aquatic Centre 50m Pool Blanket Winch                              0       9,457       9,457             9,457         100.00%
                         500104 - Cooroy Library Tactile Marker Placement                                  0       9,339        9,339               0            0.00%
                         500110 - Tewantin Spray Park Shade Sail                                           0        1,210      2,893             2,893         239.13%
                         500119 - Bicentennial Community Hall- School Toilet additional                    0       24,000      24,000           19,500          81.25%
                         500205 - NAC learn to swim pool - pool cover rep!                                 0       18,000      27,630            5,526          30.70%
                         500208 - NAC 25m pool Retile and Regrout                                          0           0       30,000               0            0.00%
                                                                      Total Community Facilities    877,500      675,116      825,893          170,764          20.68%

                                                                                                                                               Page 82 of 123

Section 83

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 83 of 123

Noosa Council
Capital Works Schedule
  As at: 31-May-2015
                                                                                 Original      Current       Future    Year To Date       % of Annual
     Project                                                                     Budget       Budget       Budget             Actual    Budget Spent
Corporate Buildings
      500022 - Tewantin Council Office - roof rehab                                 30,000        30,000      30,000                0            0.00%
      500074 - Noosaville Depot - replace generator                                 60,000        60,000      60,000           22,000           36.67%
                                                     Total Corporate Buildings      90,000        90,000      90,000           22,000           24.44%
Environmental Assets, Bushland, Tracks and Trails
      500023 - Cudgerie - Cedar Gully Pk water feature                              22,000       49,332       49,332           49,332          100.00%
      500024 - Noosa Trail Network 4 - bridge refurbish                             40,000       40,000       40,000            6,016           15.04%
      500025 - Noosa Trail Network 4 - Ringtail Creek                                7,000        7,000         7,000           3,050           43.57%
      500026 - Weyba Creek - bank erosion restoration                              220,000        20,000      20,000            8,679           43.40%
                       Total Environmental Assets, Bushland, Tracks and Trails     289,000      116,332      116,332           67,077           57.66%
Fleet - Plant Replacement
      500027 - Whole of Shire - replace council fleet                             1,735,000    1,735,000    1,735,000         806,730           46.50%
                                                Total Fleet- Plant Replacement    1,735,000    1,735,000    1,735,000         806,730           46.50%
Gravel Road Network
      500028 - Whole of Shire - gravel resheeting                                  410,000      410,000      410,000          422,091          102.95%
                                                    Total Gravel Road Network      410,000      410,000      410,000          422,091          102.95%
Holiday Parks
      100727 - Noosa Nth Shore Holiday Park - Upgrade Septic treatment                   0        11,700       11,700          11,668           99.73%
      500029 - Boreen Point Campground - wastewater                                 60,000        64,201      69,201           69,010          107.49%
      500030 - Noosa River Holiday Pk- Internal refurb                              75,000        15,000       15,000           1,135            7.57%
      500101 - Boreen Point Tennis Courts Renewal Stage |                                0         9,834      21,945           22,061          224.33%
      500113 - Cooroy RV Stopover                                                        0      45,000       45,000            12,051           26.78%
                                                           Total Holiday Parks     135,000      145,736      162,847          115,925           71.19%
Information Technology
      100728 - IT Major Projects                                                         0      128,100      128,100          123,208           96.18%
      500075 - Whole of Shire - Tech One HR module                                 167,500      132,500      132,500           26,510           20.01%
      500076 - Whole of Shire - Mobile Mapping                                     220,000      220,000      220,000          212,895           96.77%
      500077 - Whole of Shire - corporate website                                  125,000        12,240       12,240          12,239           99.99%
      500078 - Whole of Shire - replace failed UPS                                   12,600       12,600       12,600          4,177            33.15%
      500082 - Civil Engineering Design Software                                         0        15,019       15,019          15,019          100.00%
                                                 Total Information Technology      525,100      520,459      520,459          394,048           75.71%
Parks & Playgrounds
      500031 - Noosa Botanical Gardens- Pathway renewal                              10,000       10,000       10,000           4,352           43.52%
      500032 - Noosaville - Munna Pk basket ball court                               6,000             0            0               0            0.00%
      500033 - Noosaville -Gympie Tce Foreshore BBQs                                55,000       43,942       43,942           46,509          105.84%
      500034 - Noosaville Lions Park- Pirate Playground                            100,000      160,000      160,000            6,789            4.24%
      500035 - Peregian Beach - Victory Park table                                    3,000        2,700        2,700           2,967          109.88%
      500036 - Peregian Beach Pk - 3 phase switchboard                               12,000       11,633       11,633          12,433          106.88%
      500037 - Tewantin - Martin Park skate facility                                60,000        65,334      65,334           67,417          103.19%
      500038 - Whole of Shire - BBQ renewal                                          18,000       13,047       13,047          14,781          113.29%
      500039 - Whole of Shire - park shelters                                      40,000         37,631      37,631          40,732           107.89%
      500040 - Whole of Shire - playground renewal prog                             20,000        30,000      30,000            6,845           22.82%
      500041 - Whole of Shire - playground softfall                                  10,000       20,000      20,000           10,500           52.50%
      500105 - Botanical Gardens Park Furniture Renewal                                  0        24,500      24,500           11,640           47.51%
                                                    Total Parks & Playgrounds      334,000      418,786      418,786          224,966           53.72%

                                                                                                                              Page 83 of 123

Section 84

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 84 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                 23 JUNE 2015

                    Noosa Council
                    Capital Works Schedule
                     As at: 31-May-2015
                                                                                                   Original      Current       Future    Year To Date      % of Annual
                        Project                                                                    Budget       Budget       Budget            Actual    Budget Spent
                   Pathways & Enabling Facilities
                         100736 - Weyba Creek Boarwalk Rehab Stage 1                                       0       19,600       19,600             583            2.97%
                         100737 - Gibson Road (Eumindi Noosa Rd to Thomas St) - On road cycle              0      430,800      430,800         689,024          159.94%
                         100738 - Sunshine Beach State School Safety Improvements2                         0       19,387       19,387           19,387         100.00%
                         500042 - Tewantin - pathway upgrade and lighting                            270,000      270,000      270,000         43,255            16.02%
                         500043 - Noosa Heads - Park Road boardwalk design                           200,000      200,000      200,000           27,828          14.03%
                         500044 - Noosa Heads - Main Beach boardwalk                                 500,000            0            0               0            0.00%
                         500045 - Noosa Heads - Park Rd boardwalk stage 3a                           850,000            0            0               0            0.00%
                         500099 - Eenie Creek Pathway Stage 1 Signage                                      0      40,000       40,000             1,092           2.73%
                         500100 - Wallace Park Shared Path Construction                                    0      400,000      400,000         202,425           50.61%
                         500103 - Cooroy Noosa Road Corridor Improvement                                   0      230,000      230,000           30,340          13.19%
                         500115 - Tewantin State School Precinct Pathways                                  0      210,000      210,000           93,120          44.34%
                         500116 - Noosaville State School Precinct Pathways                                0       85,000       85,000          40,518           47.67%
                         500117 - Sunshine Beach State School Precinct Pathway                             0       25,000       25,000             584            2.34%
                         500201 - Pomona Road Footpath Renewal                                             0       80,000       80,000            4510            0.00%
                                                             Total Pathways & Enabling Facilities   1,820,000    2,009,787   2,009,787        1,152,667          57.35%
                   Planning Scheme
                         500079 - Noosa Design Manual                                                115,000      115,000      115,000            3,449            3.00%
                         500080 - Standards Review - Standard Drawings                                50,000       25,000       25,000            4,904          19.62%
                         500081 - Whole of Shire Traffic Study                                       100,000      100,000      100,000            7,699           7.70%
                         500106 - Noosa River Flood Mitigation Strategy                                    0       50,000       50,000             889             1.78%
                         500107 - Noosa River Hydraulic Model                                              0      300,000      300,000            9,681            3.23%
                         500203 - Business Distribution and Land Needs Project                             0       50,000       50,000           16,560          33.12%
                                                                          Total Planning Scheme      265,000      640,000      640,000          43,183             6.75%
                   Public Transport Infrastructure
                         500001 - Electric Bus Feasibility Study                                     100,000      100,000      100,000           93,368          93.37%
                         500046 - Noosa Heads - Noosa Parade Stop 114                                 50,000       50,000       50,000           18,539          37.08%
                         500047 - Noosa Heads - Noosa Parade Stop 26                                  40,000       40,000       40,000           18,872          47.18%
                         500048 - Noosa Heads - Noosa Parade Stop 27                                  40,000       40,000       40,000           18,990          47.47%
                         500049 - Noosa Heads - Noosa Parade Stop 28                                  65,000       65,000       65,000           25,232          38.82%
                         500050 - Noosa Junction Transit Centre - improve                             40,000       40,000       40,000               0            0.00%
                         500051 - Peregian Beach - David Low Way Stop 87                             125,000      125,000      125,000            3,036           2.43%
                         500052 - Sunrise Beach - Wollomia Way Stop 11                                40,000       40,000       40,000            1,171           2.93%
                         500053 - Whole of Shire - bus shelter DDA                                    20,000       20,000       20,000           29,694         148.47%
                         500083 - Noosa Bus Station Safer Streets Program                            175,500      117,900      117,900           21,953          18.62%
                         500089 - Noosa Heads - Noosa Parade Translink 700596                              0       40,000       40,000           19,132          47.83%
                         500090 - Noosa Heads - Noosa Parade Translink 700584                              0       50,000       50,000           21,752          43.50%
                         500091 - Tewantin - Butler St Translink 700490                                    0       50,000       50,000            1,957            3.91%
                         500092 - Tewantin - Butler St Translink 700491                                    0       35,000       35,000            3,173           9.07%
                         500093 - Noosaville - Weyba Rd Translink 700585                                   0       40,000       40,000            7,198          18.00%
                         500094 - Noosaville - Weyba Rd Translink 700521                                   0       65,000       65,000             411            0.63%
                         500095 - Noosaville - Weyba Rd Translink 700522                                   0       40,000       40,000            1,111           2.78%
                         500096 - Noosaville - Weyba Rd Translink 700456                                   0       50,000       50,000            1,971           3.94%
                         500097 - Noosaville - Weyba Rd Translink 700523                                   0       40,000       40,000            7,193          17.98%
                         500098 - New Noosa Bus Shelters - Design                                          0       60,000       60,000           75,119         125.20%
                         500209 - Electric Bus Charging Station and Installation                           0            0      100,000               0            0.00%
                                                             Total Public Transport Infrastructure   695,500     1,107,900   1,207,900         369,872           30.62%
                   Sealed Roads Network
                         100742 - Sealed Road Pavement surveys and Investigations                          0       51,600       51,600            8,304          16.09%
                         500054 - Whole of Shire - pavement surveys                                   60,000       60,000       60,000           39,847          66.41%
                         500055 - Whole of Shire - reseal and rehab                                 5,000,000    5,553,610   5,553,610        3,709,840          66.80%
                         500061 - Noosa Heads - Noosa Parade Master Plan                             100,000            0            0               0            0.00%
                         500062 - Noosaville - Eumundi Noosa Road corridor                            20,000       79,085       79,085            1,200            1.52%
                         500065 - Emergent all infrastructure renewal                               2,951,898    1,003,039     807,219               0            0.00%
                         500118 - Dr Pages - Kinmond Creek Rd Initial Planning & Design                    0      150,000      150,000           35,253          23.50%
                         500206 - Tewantin Cooroy Noosa Rd Stages 2-6 Design Only                          0      150,000      150,000           26,139          17.43%
                                                                     Total Sealed Roads Network _— 8,131,898     7,047,335   6,851,515        3,820,583          55.76%

                                                                                                                                                Page 84 of 123

Section 85

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 85 of 123

Noosa Council
 Capital Works Schedule
  As at: 31-May-2015
                                                                                Original      Current       Future    Year To Date       % of Annual
     Project                                                                     Budget       Budget      Budget             Actual    Budget Spent
Sports Ground and Facilities
      500056 - Girraween Sports Ground irrigation                                   28,000       15,583       15,583          16,884          108.35%
      500108 - Girraween Sports Complex Lighting                                         0       10,000       10,000               0            0.00%
                                            Total Sports Ground and Facilities      28,000       25,583       25,583          16,884           66.00%
Stormwater Drainage
      100745 - Gympie Terrace Pipe Rehabilitation - Investigation & Design               0       11,300       11,300             537            4.75%
      100747 - Seaview Ck - open drain civil works                                       0       41,633       41,633          44,829          107.68%
      500057 - Gympie Terrace pipe rehabilitation                                  200,000      200,000     200,000            3,025            1.51%
      500058 - Re-lining of Ben Lexcen stormwater                                   50,000       50,000       50,000          10,726           21.45%
      500059 - Whole of Shire - stormwater CCTV                                     10,000       10,000       10,000           3,639           36.39%
      500060 - Whole of Shire - stormwater structures                              150,000      150,000      150,000          21,948           14.63%
      500084 - Whole of Shire - Flood mitigation stage                           2,802,970    2,802,970    2,852,970         426,084           15.00%
      500202 - Marcus Beach Tristania Dve Stormwater Pipe Renewal                        0       18,000       18,000               0            0.00%
                                                   Total Stormwater Drainage   = 3,212,970    3,283,903    3,333,903         510,787           15.32%
Streetscapes and Road Corridors
      100749 - Forward Planning for Streetscape and Road Corridor improveme              0        1,715        1,715           1,833          106.88%
      500085 - Peregian Beach - precinct planning                                   50,000       50,000       50,000          13,415           26.83%
                                        Total Streetscapes and Road Corridors       50,000       51,715       51,715          15,247           29.48%
Transport and Infrastructure Management
      100750 - Eenie Creek Road / Langura Street Intersection safety upgrad              0       16,503       16,503          16,510          100.04%
      100751 - Eenie Creek Road / Walter Hay Drive Intersection safety upgr              0      109,100      109,100          30,509           27.96%
      100752 - Weyba Road Reef Street Intersection Improvements - PIP                    0      118,500      118,500          14,020           11.83%
      100899 - Noosa Junction Disabled Parking CBA Frontage                              0       20,000       20,000          19,391           96.96%
      500063 - Whole of Shire - On Road Cycle Network                              125,000            0            0               0            0.00%
      500064 - Sunrise Beach - Ben Lexcen Dr school                                 70,000       80,000       80,000          20,662           25.83%
      500086 - Whole of Shire - Road Directional Signs                              40,000            0            0               0            0.00%
      500087 - Cooroy Noosa Road - Beckmans Rd Intersec                            110,000      110,000       44,000          24,837           22.58%
                                Total Transport and Infrastructure Management      345,000      454,103     388,103          125,929           32.45%
Waste Management
      500066 - Noosaville Landfill - bio basin                                     446,900      403,077     403,077          451,479          112.03%
      500067 - Noosaville Landfill - sediment control                              297,000      514,758     514,758          316,067           61.40%
      500068 - Noosaville Landfill - stormwater                                     50,000            0            0               0            0.00%
      500112 - Noosaville Landfill - Dosing & Monitoring Equipment                       0      120,000      120,000               0            0.00%
                                                     Total Waste Management        793,900    1,037,835    1,037,835         767,546           73.96%

                                                                Grand Total 22,676,868 24,197,323 24,431,323             11,899,827           48.71%

                                                                                                                             Page 85 of 123

Section 86

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 86 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                   23 JUNE 2015

               Noosa Council
               Capital Works Schedule
                 As at: 31-May-2015
                                                                              Original  Current     Future  Year To Date  % of Annual
                   Project                                                     Budget    Budget   —_ Budget      Actual Budget Spent
               Capital Works Program
                    YTD Actual Expenditure                                   $11,899,827
                    Remaining Capital Expenditure                            $12,531,496
                    Full Year Budgeted Expenditure                           $24,431,323

                     Remaining Capital
                             ¢                              D>                  Actual
                       Expenditure
                        51.29%

                                                                              Expenditure
                                                                               48.71%

                                                                                                                  Page 86 of 123

Section 87

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                23 JUNE 2015


9                        MARCH 2015 QUARTERLY BUDGET REVIEW REPORT
DOCUMENT INFORM AT ION




Author                           Manager Financial Services, Wayne Jensen
                                 Corporate Services Department

Index                            ECM / Subject / 7.06 – 2014-15 Budget

Attachments                      1.   Budget Financial Statements
                                 2.   Summary of Operating Adjustments
                                 3.   Summary of Capital Adjustments


EXECUTIVE SUMMARY
Overall budget performance for the 9 months to 31 March 2015 is positive, but there are a
number of material variances that have been addressed with this budget review.

Budget adjustments to capital projects have been made to account for jobs completed either
under or over original estimates, and to account for new projects or where tenders exceed
the original bids.

Proposed increases in expenditure have been fully funded through either allocated savings,
or from additional revenue. As such the forecast operating surplus has increased from $50k
to $103k.


RECOMMENDATION
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 23 June 2015 and approve the requested changes
to the budget for the 2014/15 financial year, as outlined in the attached Budget Financial
statements.



REPORT
A full review of budget performance of all activity areas has been undertaken based on
actual income and expenditure for the 9 months to 31 March 2015, and including additional
information that has come to light since the last budget review.

In summary, the forecast operating position has improved by $52,661, plus proceeds from
the sale of assets in which Council has an interest to provide net revenue of $280,600. The
capital program has increased by $234,000. The proposed changes have no significant
impact on any of Council’s 3 long term financial sustainability indicators.

Note also that there have been re-classification of accounts within the report made in
accordance with advice from the Queensland Audit Office which makes direct comparison
with earlier reports difficult.

Recurrent Revenue

Details of the proposed changes are outlined in the attached statements, with summary
information provided below for significant categories:




                                                                                Page 87 of 123

Section 88

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    23 JUNE 2015


 Rates and Levies – $169k net reduction in revenue – primarily to account for fewer new
   waste charges than originally budgeted.
 Fees and Charges – net reduction in revenue forecast of $68k comprising a downward
   revision of revenue from animal registration and parking infringements, partially offset by
   increases in green waste fees, lodgement fees and revenue from park and ride facilities.
 Interest Received – increased by $150k.
 Dividend and Tax – no changes made against these items.
 Sales & Other Revenue – $279k additional revenue primarily from searches, and sale of
   recyclable material.
 Grants and Subsidies – additional operational grant funding of $80k, offset by increases
   in expenditure.
 Sale of Assets (non-recurrent) - $281k – sale of land by the State Government in which
   Council held an interest.

Recurrent Expenditure

Operating expenses increases by $220k.

 Employee Costs – overall reduction of $55k.
 Materials and Services – increase of $315k to account for expenditure of grants
   received; additional projects to be undertaken; additional legal costs; and cost
   adjustments to a range of budgets (as outlined in the attachments).
 Finance Costs – reduced by $40k to account for changes in the merchant arrangements.
 Depreciation – no changes made.
 Other Expenses – generally in accordance with budget.


Capital Works Program

Changes to the capital works program amount to an increase of $234k overall. This includes
additional costs for a range of renewal and refurbishment projects (primarily financed from
uncommitted emergent works funds), with $100k funded from Noosa Community Care
reserves. Provision has also been made for $100k to fund the establishment of a charging
station for the electric bus trial (funded from the Public Transport levy), plus $50k strategic
planning for the redevelopment of the Peregian Beach Bowls Club site (funded from general
revenue).

Previous Council Consideration

Nil.

Finance & Risk

The revised budget forecast forms the basis for the development of a revised long term
financial plan, commencing with the 2015/16 budget. All financial sustainability indicators
remain within target ranges.

Consultation

External Consultation - Community & Stakeholder

Nil.




                                                                                   Page 88 of 123

Section 89

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015


Internal Consultation

All areas of Council are consulted as part of the budget review.

Departments/Sections Consulted:

x   Community Services                       x   Planning & Infrastructure
    Disaster Management & Public Order           Building & Plumbing Services
    Waste & Environmental Health                 DA Planning
    Community Facilities                         Strategic Land Use Planning
    Cultural Facilities                          Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

x   Executive Office                         x   Corporate Services
    Community Engagement                         Finance
    Customer Service                             ICT
    Executive Support                            Procurement & Fleet
    Governance                                   Property & Facilities
    Human Resources                              Revenue Services




                                                                                 Page 89 of 123

Section 90

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                                    Attachment 1




                                                   Page 90 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 23 JUNE 2015

                                                                       Attachment 1

       Rea ee eee ee                            en
     ee       SENG Cee     Nol    te     aS

                          FINANCIAL STATEMENTS
                                 2014/2015
                             BUDGET REVIEW 4
                           March Quarterly Review

                                               Page 90 of 123

Section 91

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 91 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                              23 JUNE 2015

                Noosa Shire Council
               2014/15 Budget Statements
               For the period ending 30 June
            | Annual Result-TotalCouncil,                    | Original | BRS | BRA |                                                           orecast,
                                                                   2015       2015       2015       2016       2017       PAE}        2019       2020       2021      Ply)         2023       2024
               Statement of Comprehensive Income                  $,000       $,000      $,000      $,000      $,000      $,000       $,000      $,000      $,000      $,000       $,000      $,000
               Revenue
                  Recurrent revenue
                  Net rates, levies and charges                     60,515     58,748                61,128      62,720     64,513     66,521     68,419     70,545      72,554     74,806     76,933
                  Fees and charges                                   9,577      9,951                9,386       9,620      9,861      10,107     10,360      10,619     10,885     11,157     11,436
                  Rental income                                      1,114      1,153                  1,125      1,153      1,182      1,212      1,242       1,273      1,305      1,338      1,371
                  Interest received                                  4,467      4,709                 4,519       4,702      4,897      5,026      5,278       5,435,     5,618      5,810      6,024
                  Other income                                       4,708      4,970                 6,104       6,255      6,409      6,567      6,728       6,895      7,065      7,239      7,418
                  Grants, subsidies, contributions and donations     5,322      4,977                  5,059      5,061      5,118      5,175      5,232       5,289      5,347      5,404      5,461
                  Total recurrent revenue                           85,702     84,506                87,321      89,512     91,979     94,608     97,260    100,056     102,774    105,753    108,643
                  Capital revenue                                                    p
                  Grants, subsidies, contributions and donations     4,588      5,079                  1,500      3,500      6,500      6,500      6,500       6,500      6,500      6,500      6,500
                                                                                     pO
                  Total revenue                                     90,291     89,585                88,821      93,012     98,479    101,108    103,760    106,556     109,274    112,253    115,143
                  Capital income                                                     p
                  Total capital income                                427         318                     -          -           -          -          -          -           -          -          -
                                                                                     p
               Total income                                         90,718     89,903                88,821      93,012     98,479    101,108    103,760    106,556     109,274    112,253    115,143
                  Recurrent expenses                                                 p
                  Employee benefits                                27,743      27,690                28,378      29,088     29,917     30,665     31,539     32,328      33,249     34,080     35,051
                  Materials and services                            33,179     38,072                39,317      40,300     41,307     42,340     43,398     44,485      45,595     46,735     47,904
                  Finance costs                                      2,525      2,531                 2,326       2,156      1,981      1,796      1,604       1,393      1,173        940        695
                  Depreciation and amortisation                     17,523     16,079                16,583      16,851     17,093     17,337     18,054      18,606     19,467     19,993     20,256
                  Other expenses                                     4,674         84                    89          91         94         96         98        101         103        106        108
                  Total recurrent expenses                                                           86,693      88,485     90,393     92,234     94694      96911       99,587    101,855    104,014
                                                                                     po
               Net result                                            5,074      5,447                 2,128       4,527      8,086      8,874      9,066       9,645      9,687     10,398     11,129

                                                                                     po
               Recurrent revenue                                    85,702     84,506                87,321      89,512     91,979     94,608     97,260    100,056     102,774    105,753    108,643
               Recurrent expenses                                                                    86,693      88,485     90,393     92,234     94,694     96,911      99,587    101,855    104,014
               Operating result                                                                         628       1,027      1,586     2,374      2,566        3,145     3,187      3,898       4,629

                                                                                                                            Page 91 of 123

Section 92

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 92 of 123

Noosa Shire Council
 2014/15 Budget Statements
 For the period ending 30 June
 Annual Result                                  | original | BR3 | BRAT                                                                        recast
                                                     2015         2015        yA E          2016        AV           2018         2019         2020         2021         2022        2023         yiiy2.
 Statement of Financial Position                     $,000        $,000        $,000       Ex           $,000        $,000        $,000        $,000       $,000        $,000        $,000        SAT
Assets                                           pT
   Current assets                                                          P|
   Cash and cash equivalents                           33,794       32,898                   31,575       30,315       30,974       31,306       32,464      34,547       36,571       39,402       42,318
   Trade and other receivables                         11,626        7,615)                    7,904       8,118        8,339        8,583       8,791         9,074        9,320       9,593        9,826
   Inventories                                            101          103)         103         103          103          103          103          103          103         103          103          103
   Other current assets                                     -          422         422         433          444           455          466          478         490          502          514          527
   Total current assets                               45,521        41,039                   40,015       38,981       39,870       40,459       41,837     44,214        46,496       49,612       52,774
   Non-current assets
   Investments                                         60,978      111,234      111,234     111,234      111,234      111,234      111,234      111,234      111,234     111,234      111,234      111,234
   Property, plant & equipment                        962,724      902,594                  925,622      951,679      979,859    1,009,498    1,038,378    1,067,516    1,097,038    1,126,790   1,157,535
   Other non-current assets                             2,928        3,020                     3,591       3,252        2,726        2,163        2,112        1,743        1,447        1,130         821
                                                                          po
   Total non-current assets                         1,026,630    1,016,849                 1,040,448    1,066,166   1,093,819    1,122,895    1,151,724    1,180,493    1,209,720    1,239,155   1,269,590
                                                                          po
   Total assets                                     1,072,151    1,057,887                 1,080,463    1,105,146   1,133,689    1,163,354    1,193,561    1,224,707    1,256,216    1,288,767   1,322,364

   Current liabilities                                                    fp
   Trade and other payables                             4,161        4,214                     4,325       4,445        4,559        4,673        4,780        4,913        5,040       5,165        5,284
   Borrowings                                           2,802        2,766                     2,962       3,136        3,321        3,514        3,725        3,944       4177         4,423        4,685
   Provisions                                           1,023        4,467        4,467        4,579       4,693        4,811        4,931        5,054        5,181        5,310       5,443        5,579
   Other current liabilities                                -          852         852          873          895          917          940         964          988         1,013        1,038       1,064
   Total current liabilities                            7,986       12,299                    12,738      13,169       13,609       14,058       14,523       15,026       15,540      16,069       16,613
   Non-current liabilities
   Trade and other payables                                 -            -                        -            -            -            -            -            -           -            -            -
   Borrowings                                          35,976       36,613                   33,625       30,489       27,168       23,654       19,930       15,985       11,808      7,385         2,700
   Provisions                                           2,747        8,421        8,421        8,630       8,844        9,064        9,289        9,520        9,757       10,000      10,249       10,504
   Total non-current liabilities                       38,723       45,033                   42,255       39,333       36,232       32,944      29,450        25,742      21,808       17,634       13,203
                                                                          po
   Total liabilities                                  46,709        57,332                   54,993       52,503       49,841       47,002       43,973     40,769        37,348       33,703       29,816
                                                 —_—_—_
 Net community assets                               1,025,442    1,000,555                 1,025,470    1,052,644   1,083,849    1,116,353    1,149,588    1,183,939    1,218,868    1,255,064   1,292,548

   Asset revaluation surplus                          204,624       21,798       21,798      44,228       67,078       90,404      114,246      138,633      163,563     189,035      215,067      241,663
   Retained surplus                                   820,818      978,757                 981,242       985,566      993,445    1,002,106    1,010,954    1,020,376    1,029,833    1,039,997   1,050,885
                                                                           pd
   Total community equity                           1,025,442    1,000,555                 1,025,470    1,052,644   1,083,849    1,116,353    1,149,588    1,183,939    1,218,868    1,255,064   1,292,548

                                                                                                                                 Page 92 of 123

Section 93

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 93 of 123

Noosa Shire Council
2014/15 Budget Statements
For the period ending 30 June
Annual Result                                   | Original | BRS | BRA |                                                             recast
                                                     2015       rT         PAE)        2016      rl)          2018       2019        2020      rid         ri7)        2023        riz)
PEL me) mer COW)                                    $,000       Salt)      $,000       $,000      $,000       $,000      $,000       $,000      $,000      $,000       $,000      $,000
Cash flows from operating activities      PO
                                                                       po
   Receipts from customers                            66,362     71,088                 73,508      75,400     77,510     79,822      82,091     84,491      86,889     89,475      92,012
   Payments to suppliers and employees              (62,750)}   (68,452)               (67,794)   (69,401)    (71,243)   (73,024)    (74,961)   (76,809)    (78,847)   (80,818)   (82,963)
   Dividend received                                   2,841      2,841       2,841      2,912       2,984      3,059       3,136      3,214       3,294      3,377      3,461       3,548
   Interest received                                   4,467      4,709                  4,519       4,702      4,897       5,026      5,278       5,435      5,618      5,810       6,024
   Rental income                                       1,067      1,156                  1,123       1,151      1,180       1,209      1,240       1,270      1,302       1,335      1,369
   Non-capital grants and contributions                5,101      4,991                  5,049       5,049      5,102       5,159      5,217       5,272      5,330      5,386       5,445
   Borrowing costs                                   (2,235)     (2,269)    (2,269)     (2,157)    (1,987)     (1,812)    (1,627)     (1,435)    (1,224)     (1,004)      (771)      (526)
   Net cash inflow from operating activities          14,853     14,063                 17,160      17,898     18,693      19,702     20,644     21,729      22,665     23,878      24,909
Cash flows from investing activities                                    |       |
                                                                       po
   Payments for property, plant and equipment       (21,884)}   (23,146)               (16,588)   (19,488)    (21,321)   (22,471)    (21,846)   (22,096)    (22,871)   (23,296)   (23,996)
   Payments for intangible assets                      (790)     (1,032)                  (867)      (230)       (100)      (100)       (650)      (350)      (350)       (100)      (100)
   Proceeds from sale of property, plant and equipm¢     427        318                      -           -          -           -          -          -           -          -           -
   Grants, subsidies, contributions and donations      4,588      5,079                  1,500       3,500      6,500       6,500      6,500       6,500      6,500      6,500       6,500
   Other cash flows from investing activities        (2,230)     10,522      10,522         21          22         22          23         24         24          25         25          26
   Net cash inflow from investing activities        (19,890)     (8,260)               (15,934)   (16,196)    (14,899)   (16,048)    (15,972)   (15,922)    (16,696)   (16,871)   (17,570)
Cash flows from financing activities                                    |       |
   Proceeds from borrowings                              794        794         794          -           -          -           -          -          -           -          -           -
   Repayment of borrowings                           (2,626)     (2,593)    (2,593)     (2,792)    (2,962)     (3,136)    (3,321)     (3,514)    (3,725)     (3,944)    (4,177)     (4,423)
   Net cash inflow from financing activities         (1,832)     (1,799)    (1,799)     (2,792)    (2,962)     (3,136)    (3,321)     (3,514)    (3,725)     (3,944)    (4,177)     (4,423)
Total cash flows
                                                 ee EE
Net increase in cash and cash equivalent held        (6,869)| 4,005]                    (1,566)    (1,260)        658        333       1,158      2,083       2,024      2,830       2,916
Opening cash and cash equivalents                     40,662     28,893      28,893     33,141      31,575     30,315     30,973      31,306     32,464      34,547     36,571      39,401
Closing cash and cash equivalents                     33,794     32,898                 31,575      30,315     30,973     31,306      32,464     34,547      36,571     39,401      42,317

                                                                                                                   Page 93 of 123

Section 94

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 94 of 123

Noosa Shire Council
 2014/15 Budget Statements
 For the period ending 30 June
 Annual Result                                 | original | oBRs | BRA Precast
                                                     2015        2015         2015         2016         2017        YAU)         2019         2020        2021         2022         2023         2024
 Statement of Changes in Equity                     $,000        $,000       $,000         $,000      $,000         $,000        $,000        $,000      $,000         $,000        $,000        $,000
Asset revaluation reserve                        PT
   Opening balance                                    181,256           -            -       21,798     44,228        67,078      90,404       114,247     138,634      163,563      189,035     215,067
   Increase in asset revaluation surplus              23,368      21,798        21,798      22,430      22,850       23,326        23,843      24,387      24,929        25,472      26,032        26,596
   Internal payments made                                  na          na           na           na          na           na           na           na          na           na           na           na
   Internal payments received                              na          na           na           na          na           na           na           na          na           na           na           na
   Closing balance                                   204,624       21,798       21,798       44,228      67,078       90,404      114,247      138,634     163,563      189,035      215,067     241,663
 Retained surplus
   Opening balance                                   815,744      973,501      973,501      979,312     981,242      985,566      993,445    1,002,106    1,010,954   1,020,376    1,029,833    1,039,996
   Net result                                           5,074       5,255                     1,930       4,324        7,879        8,661        8,848       9,422        9,457       10,163       10,888
   Increase in asset revaluation surplus                   na          na |        nal           na          na           na           na           na          na           na           na           na
   Closing balance                                   820,818      978,756                   981,242     985,566     993,445     1,002,106    1,010,954    1,020,376   1,029,833    1,039,996    1,050,884

   Opening balance                                   997,000      973,501      973,501    1,001,110    1,025,470    1,052,644   1,083,849    1,116,353    1,149,588   1,183,939    1,218,868    1,255,063
   Net result                                           5,074       5,255                     1,930       4,324        7,879        8,661        8,848       9,422        9,457       10,163       10,888
   Increase in asset revaluation surplus              23,368      21,798        21,798      22,430      22,850       23,326        23,843      24,387      24,929        25,472      26,032        26,596
   Closing balance                                  1,025,442]   1,000,555                1,025,470    1,052,644    1,083,849   1,116,353    1,149,588    1,183,939   1,218,868    1,255,063    1,292,547

                                                                                                                             Page 94 of 123

Section 95

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   23 JUNE 2015




                                                   Page 95 of 123

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                               23 JUNE 2015

              Noosa Shire Council
              2014/15 Budget Statements
              For the period ending 30 June
           | AnnualResuit                                      Budget |                                                   recast
                                                                 2015        2016       yA  Wd     yA0KT:}     2019       2020       2021        WP         2023       PAIL
              Financial Sustainability Ratios                    PAO)        $,000      $,000      $,000      $,000       $,000      $,000      $,000       $,000      $,000
              Operating Surplus Ratio                               0.1%        0.7%       1.1%       1.7%       2.5%        2.6%       3.1%       3.1%        3.7%       4.3%
              Net Financial Liabilities Ratio                      18.8%       17.2%      15.1%      10.8%       6.9%        2.2%      -3.4%       -8.9%     -15.0%     -21.1%
              Asset Sustainability Ratio                           96.1%      96.4%      103.1%      99.1%     104.7%       97.0%      95.5%      94.9%      93.4%       95.6%

              Operating Surplus Ratio
              Measures the extent to which revenues raised cover operational expenses
              only or are available for capital funding purposes or other purposes.
              Calculation: Net result divided by total operating revenue, expressed as a %.
              Target: between 0% and 10%

              Net Financial Liabilities Ratio
              Measures the extent to which the net financial liabilities of Council can
              be repaid from operating revenues.
              Calculation: (total liabilities less current assets) divided by
              total operating revenue, expressed as a %.
              Target: not greater than 60%.

              Asset Sustainability Ratio
              This ratio reflects the extent to which the infrastructure assets managed by Council
              are being replaced as they reach the end of their useful lives.
              Calculation: capital expenditure on the replacement of infrastructure assets
              (renewals) divided by depreciation expense, expressed as a %.
              Target: greater than 90%.

                                                                                                              Page 95 of 123

The text continues on section 96.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.