PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 23 JUNE 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 23 June 2015 regarding Application No. MCU14/0096 for a Development Permit for Animal Husbandry Type 1 (Aquaculture) situated at 0, 3 & 4/15 Production Street, Noosaville and: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Drawing No. Plan/Document Name Date 1 Site Plan 8-3-2015 2 Floor Plan 8-3-2015 3 Floor Plan 8-3-2015 3. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Water & Sewer Connections 4. An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). 5. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. 6. All waste water should be disposed to sewer in accordance with requirements of Unitywater. Amenity 7. The development must not create detrimental impacts on the amenity of the area due to the creation of excessive noise, odour nuisance or other emissions. 8. The development shall incorporate suitable mechanical ventilation, filtration systems or the like to manage the risk of ingress airborne pollutants from any surrounding industrial uses. Advisory Notes Acoustic Advice & Design 1. It is highly recommended that the developer seek the advice and design input of a qualified acoustic consultant at the plan development stage to ensure the development does not cause a noise nuisance under the Environmental Protection Act 1994 or this Decision Notice. Attention should be given to the following (but not limited to): Page 34 of 123
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.