3.3 Rational!Method!Calibration!
The! existing! scenario! WBNM! model! has! been! calibrated! to! the! Rational! Method!
derived!peak!flows!at!the!outlet!of!the!catchment!draining!to!northern!boundary!of!
the!site!(WBNM!catchment!node!‘Outlet’).!!The!adopted!calibration!parameters!are!
detailed!in!the!Section!3.1.!
A!summary!of!the!Rational!Method!calculation!input!parameters!is!provided!below!
in!Table!9!and!additional!details!of!the!Rational!Method!calculation!are!provided!in!
Appendix!2!of!this!report.!
Table!9:!Rational!Method!Calibration!Summary!(Total!Catchment)!
Parameter! Value!
Time!of!Concentration!(tc)! 6!min!
Catchment!Area! 1.1784!ha!
C10!Value! 0.48!
100!year!Rainfall!Intensity! 302.7!mm/hr!
!
A! comparison! of! peak! Rational! Method! flow! rates! compared! with! peak! WBNM!
model!flow!rates!are!provided!in!Table!10!below.!
Table!10:!Rational!Method!Peak!Flows!Versus!WBNM!Peak!Flows!!
2yr!ARI! 5yr!ARI! 10yr!ARI! 20yr!ARI! 50yr!ARI! 100yr!ARI!
Catchment! (m3/s)!
(m3/s)! (m3/s)! (m3/s)! (m3/s)! (m3/s)!
Rational! 0.24! 0.3! 0.33! 0.42! 0.54! 0.62!
WBNM! 0.298! 0.387! 0.437! 0.506! 0.536! 0.598!
%!Difference! 19%! 22%! 24%! 17%! Z1%! Z4%!
!
The!above!results!show!that!a!reasonable!peak!flow!calibration!has!been!achieved,!
particularly!for!the!larger!events!of!the!WBNM!model!when!compared!to!a!Rational!
Method! calculation.! ! The! WBNM! model! estimates! slightly! lower! peak! flows! in! the!
smaller! events,! however,! this! would! be! considered! acceptable! in! assessing! nonZ
worsening!of!flows.!
3.4 Developed!Scenario!
The! proposed! development! has! been! incorporated! into! the! WBNM! model! by!
adjusting! the! site! subZcatchments! and! the! fraction! impervious! values.! ! Fraction!
impervious! values! of! the! existing! and! proposed! scenarios! are! provided! in! Table! 11!
below.!!The!modelled!development!case!adopts!conventional!impervious!fractions!as!
a! conservative! estimate.! The! developed! scenario! WBNM! model! layout! is! shown! in!
Figure!6!of!this!report.!!!It!is!noted!that!the!catchment!area!reporting!to!C1!outlet!is!
significantly!reduced!by!the!proposed!development!(Existing!=!2265!m2;!Developed!=!
1550!m2).!!The!supplied!hydraulic!design!from!FLOTH!(Appendix!1)!is!based!on!the!
capture! of! all! runoff! up! to! and! including! a! 100yr! ARI! event! within! the! internal!
stormwater!collection!network.!!This!network!is!outlet!to!the!south!eastern!corner!of!
the!site!and!flows!to!Outlet!C2.!!Therefore,!it!is!expected!that!the!peak!flows!from!
! ! ! 16!
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0021- Operational Works Application 2 of 4Related documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.