Council archive · source document
OPW16/0021- Operational Works Application 2 of 4
Very large file (21.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
WBNM%–%Mitigated%Case%Catchment%2%%
(ADVANCED(INFERFACE(OUTPUT)%
%
%
%
%
% %
[OCR of page images]
WBNM - Mitigated Case Catchment 2
(ADVANCED INFERFACE OUTPUT)
Ss iWBNM
eee
[ntsiseup
Clear ALL
Project INI
Import
Folders.
Full Path for WBNMRun.exe:
Default Opening Directory:
[Build Edt Preamble™
Project ID: 2014022
Project Description: Proposed subdivision at Sunshine Beach - Developed Case
Comments: Project Location: 71 Seaview Tce, Sunshine Beach
_|s
Catchment Statistics
Total Area [ha]
Total impervious Percent [%]
No. of Subareas
No, of Subareas with WC Factor
Routing Options ‘Sort Subareas Import MidMif Populate Populate Continuing Loss Rate =I |
1.6 01 R 1 0 25 0
[Piisttereatiane 0S Subsrea [Area] COCoords (WGA) | Outet Coores WGA) [mpFracton] [CT Imlay |[ tye vate Pky ck | mt
na E u E " % om _mvhe om
D1a_Driveway SW_Tank 0.026] 0 0 0 0 100 149 01 R 1 10 25 0
OPW_Green_Ro SW_Tank 0.067] 0 0 0 0 100.0 149 04 R 1 10 25 0
OPW_Lower_A D2b 0.024) 0 0 0 0 0.0 149 01 R 1 10 25 0
OPW_Lower_B Basin 0.057] 0 0 0 0 480 149 01 R 1 10 25 0
SW_Tank Basin 0.001) 0 0 0 0 0 149 04 R 1 10 25 0
OPW_Roof Basin 0.022) 0 0 0 0 100.0 149 01 R 1 10 25 0
Basin D2b 0.003 0 0 0 0 00 149 01 R 1 10 25 0
D2b SINK 0.221 0 0 0 0 0.0 149 01 R 1 10 25 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0021- Operational Works Application 2 of 4Related documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.