Decision Letter - Change to an Existing Approval - 010.2007.00001173.03 [As Published] · 142007.1173.03
2007/1173
10. The mooring facility shall not be utilised for live-aboard purposes.
11. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $42
PSP16 – Sewerage Headworks Contributions $241
PSP17 – Water Supply Headworks Contributions $134
PSP20 – Pathway Trunk Network Contributions $42
TOTAL Contribution Amount = $ 459
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from September 2008 until the date of payment.
All contributions must be paid prior to the commencement of the use.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the paid contributions and/or the trading bank guarantee will be returned.
12. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
13. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
14. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
15. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
16. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. Also any
approval granted does not warrant that such plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of said works. The Council does not
accept any responsibility for the accuracy of such plans and specifications as approved.
Page 3 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2007.00001173.03 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 837 KB (small file)
- File type
No other editions are linked here.