Residential driveway design plans

Attached to the e-mail FW MCU220086 - Council information request.msg.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
             GENERAL NOTES                                                                                         EROSION AND SEDIMENT CONTROL                                                                             EARTHWORKS                                                                                                                         PAVEMENT NOTES
             1.    REFER TO CIVIL GEOTECHNICAL CONSULTANTS (CGS) SLOPE STABILITY REPORT NO.                        1.     ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE IN ACCORDANCE WITH                            1.   GENERAL                                                                                                                        1.    GENERAL
                   CGC-SR-2022-011-R02-REV01 FOR SITE CONSTRAINTS, PRECAUTIONS AND                                        'BEST PRACTICE EROSION AND SEDIMENT CONTROL' PUBLISHED BY INTERNATIONAL                           1.1  ALL EARTHWORKS AREAS SHALL BE STRIPPED OF GRASS, SHRUBS, RUBBISH,                                                              1.1   ALL EXISTING SERVICES SHALL BE LOCATED PRIOR TO COMMENCEMENT OF ANY
                   CONSTRUCTION RECOMMENDATIONS.                                                                          EROSION CONTROL ASSOCIATION, AUSTRALASIA, 2008.                                                        DELETERIOUS MATERIAL AND UNSUITABLE TOPSOIL. ALL SUCH MATERIALS SHALL BE                                                             WORKS.
             2.    ROAD DESIGN IN ACCORDANCE WITH THE UNSEALED ROADS MANUAL, ROAD                                  2.     STOCKPILES, BORROW PITS, STORAGE AREAS TO BE CONSTRUCTED IN                                            DISPOSED IN A SUITABLE MANNER ON-SITE AS PER ENVIRONMENTAL PROJECT                                                             1.2   THE PROPOSED SUBGRADE SHALL BE PROOF ROLLED IN THE PRESENCE OF THE
                   CLASSIFICATION 4C ACCESS. VERTICAL GRADE IN ACCORDANCE WITH AUSTRALIAN                                 ACCORDANCE WITH PRINCIPLES DETAILED IN 'BEST PRACTICE EROSION AND                                      SPECIFICATIONS.                                                                                                                      SUPERINTENDENT PRIOR TO ANY FILLING WORKS. SOFT AND OR COMPRESSIBLE
                   STANDARD AS2890.1 AND NOOSA COUNCIL STD. DRAWING RS-056.                                               SEDIMENT CONTROL' PUBLISHED BY INTERNATIONAL EROSION CONTROL                                      1.2 ALL EXISTING SERVICES SHALL BE LOCATED PRIOR TO COMMENCEMENT OF ANY                                                                   ZONES SHALL BE REMOVED AND REPLACED WITH SELECT SITE MATERIAL AND
             3.    CONSTRUCTION WORKS TO BE COMPLETED IN DRY WEATHER ONLY AS                                              ASSOCIATION, AUSTRALASIA, 2008.                                                                        WORKS.                                                                                                                               COMPACTED.
                   RECOMMENDED IN THE GEOTECHNICAL REPORT.                                                         3.     IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DEFICIENT                           1.3 THE CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS OF LEVELS TO FULLY                                                               1.3   PLACE PAVEMENT IN LAYERS OF LOOSE THICKNESS APPROPRIATE TO THE TYPE OF
             4.    ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER ENGINEERING                                      OR FAILED IN SERVICE, DUE TO UNFORESEEN CIRCUMSTANCES, CORRECTIVE                                      COMPLY WITH 'AS CONSTRUCTED' INFORMATION REQUIREMENTS.                                                                               COMPACTION EQUIPMENT BEING USED. COMPACT EACH FILLING LAYER TO THE
                   DRAWINGS AND PROJECT SPECIFICATIONS. THE CONSTRUCTION NOTES SHALL                                      ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                               TOPSOIL SHALL BE STOCKPILED ON SITE AS DIRECTED BY THE SUPERINTENDENT.                                                               MINIMUM DENSITY SPECIFIED. THE MOISTURE CONTENT OF PAVEMENT MATERIAL TO
                   APPLY UNLESS OTHERWISE VARIED BY THE DRAWINGS OR PROJECT                                               AMENDMENTS/ADDITIONS TO THE ORIGINAL APPROVED PLANS. SUCH ADDITIONS ARE                                                                                                                                                                     BE MAINTAINED.
                                                                                                                                                                                                                            1.4 BULK EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH LOCAL
                   SPECIFICATIONS.                                                                                        TO BE APPROVED BY THE CONTRACTOR.                                                                                                                                                                                                     1.4   PAVEMENT PROFILES ARE TO BE TRANSITIONED UNIFORMLY.
                                                                                                                                                                                                                                 AUTHORITY STANDARDS, THE REQUIREMENTS OF AS3798 AND THE PROJECT
             5.    REFER ANY DISCREPANCY TO THE SUPERINTENDENT BEFORE PROCEEDING WITH                              4.     THE SEQUENCE OF OPERATIONS SHALL BE AS FOLLOWS:                                                                                                                                                                                       1.5   FOLLOWING COMPLETION OF BASE COURSE PAVEMENT THE CONTRACTOR IS TO
                                                                                                                                                                                                                                 SPECIFICATIONS.
                   THE WORK.                                                                                       4.1    DELINEATION OF BUFFER AREAS AND DRAINAGE RESERVES, ERECTION OF BARRIER                                                                                                                                                                      NOTIFY THE SUPERINTENDENT THE DESIGN SURFACE IS TO BE PROOF ROLLED IN
                                                                                                                                                                                                                            1.5 THE PROPOSED FILL AREA SUBGRADE SHALL BE PROOF ROLLED IN THE PRESENCE                                                                 THE PRESENCE OF THE SUPERINTENDENT PRIOR TO WEARING COURSE PLACEMENT.
             6.    DO NOT OBTAIN DIMENSIONS BY SCALING FROM THE DRAWINGS. ALL DIMENSIONS                                  FENCING.
                                                                                                                                                                                                                                 OF THE SUPERINTENDENT PRIOR TO ANY FILLING WORKS. SOFT AND OR                                                                  1.6   IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT THE PAVEMENT FROM
                   ARE IN METRES AND ALL LEVELS IN METRES, UNO.                                                    4.2.   LOCATION OF TOPSOIL STOCKPILES, STOCKPILES, AND ERECTION OF DOWNHILL
                                                                                                                                                                                                                                 COMPRESSIBLE ZONES SHALL BE REMOVED AND REPLACED WITH SELECT SITE                                                                    DAMAGE RESULTING FROM STORMWATER RUNOFF. TEMPORARY DIVERSION DRAINS
             7.    VERIFY SETTING OUT DIMENSIONS SHOWN ON THE DRAWINGS BEFORE                                             SEDIMENT FENCE.
                                                                                                                                                                                                                                 MATERIAL AND COMPACTED.                                                                                                              AND OR OTHER DRAINAGE CONTROL DEVICES ARE TO BE IMPLEMENTED BY THE
                   CONSTRUCTION IS COMMENCED.                                                                      4.3.   THE CONSTRUCTION OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
             8.    ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE                                          (E.G. SEDIMENT FENCES, SEDIMENT BASINS).                                                          1.6 PLACE FILL IN LAYERS OF LOOSE THICKNESS APPROPRIATE TO THE TYPE OF                                                                    CONTRACTOR DURING CONSTRUCTION TO MINIMISE THE EFFECTS OF WEATHER.
                   REQUIREMENTS OF THE STANDARDS ASSOCIATION OF AUSTRALIA CODES AND LOCAL                          4.4.   LAND CLEARING AND TOPSOIL STRIPPING.                                                                   COMPACTION EQUIPMENT BEING USED AND IN ACCORDANCE WITH THE                                                                     1.7   ALL PAVEMENT MATERIAL PLACED ON THE SITE SHALL COMPRISE ONLY OF GRAVELS
                   COUNCIL SPECIFICATIONS.                                                                         4.5.   CONSTRUCTION OF STORMWATER DRAINAGE FACILITIES.                                                        SPECIFICATION. COMPACT EACH FILLING LAYER TO THE MINIMUM DENSITY                                                                     AS PER THE SPECIFICATION AND IS TO BE FREE OF CONTAMINANTS (AS DEFINED BY
             9.    UNO - UNLESS NOTED OTHERWISE.                                                                   4.6.   LAND SHAPING.                                                                                          SPECIFIED. THE MOISTURE CONTENT OF FILL MATERIAL SHOULD BE MAINTAINED                                                                SECTION 11 OF THE ENVIRONMENTAL PROTECTION ACT 1994), NOXIOUS, HAZARDOUS,
             10.   ALL SERVICES TO BE LOCATED PRIOR TO COMMENCEMENT OF WORKS.                                      4.7.   CONSTRUCTION OF ROADS AND ACCESS WAYS, INSTALLATION OF SERVICES.                                       WITHIN THE RANGE OF +/- 2% OF THE OPTIMUM MOISTURE CONTENT.                                                                          DELETERIOUS AND ORGANIC MATERIALS.
             11.   FOR DESIGN SURFACE TREATMENT OTHER THAN PAVEMENT REFER TO LANDSCAPE                             4.8.   FINAL REHABILITATION AND LANDSCAPING.                                                             1.7 EARTHWORKS PROFILES ARE TO BE TRANSITIONED UNIFORMLY BETWEEN
                   ARCHITECTS DRAWINGS.                                                                            4.9.   MAINTENANCE.                                                                                           PRESCRIBED SLOPES.
             12.   CONTOURS DISPLAYED ARE A COMBINED SURFACE OF EXISTING AND DESIGN. MAJOR                         5.     SEDIMENT BASIN IS TO BE DEWATERED WHEN REQUIRED. TO ENSURE AVAILABLE                              1.8 FOLLOWING COMPLETION OF BULK EARTHWORKS OPERATIONS THE CONTRACTOR IS
                   INTERVAL 1m MINOR INTERVAL 0.25m                                                                       VOLUME IS MAINTAINED WITH A WATER LEVEL NO GREATER THAN THE TOP OF THE                                 TO NOTIFY THE SUPERINTENDENT. THE DESIGN SURFACE IS TO BE PROOF ROLLED IN
                                                                                                                          SEDIMENT STORAGE ZONE. PRIOR TO DEWATERING ENSURE WATER IS                                             THE PRESENCE OF THE SUPERINTENDENT.
                                                                                                                          FLOCCULATED TO ACHIEVE 90TH/ PERCENTILE <50mg/l PRIOR TO DISCHARGE. INLET                         1.9 STOCKPILED TOPSOIL IS TO BE SPREAD TO AN EVEN THICKNESS OVER ALL BATTERS
                                                                                                                          BAFFLES TO BE FORMED FROM WOVEN GEOFABRIC. PROVIDE 50mm DIAMETER                                       AND SURROUNDING AREAS DISTURBED BY CONSTRUCTION ACTIVITIES. THE
             EXISTING FEATURES AND CLEARING                                                                               HOLES AT 300 CRS ACROSS THE FULL WIDTH AND DEPTH. SPACING OF POSTS IS 0.5m                             CONTRACTOR IS TO DISPOSE OF EXCESS TOPSOIL OFF SITE.
                                                                                                                          - 1.0m.                                                                                           1.10 IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT THE SITE AND SURROUNDING
             1.    EXISTING VEGETATION TO REMAIN IS TO BE CLEARLY IDENTIFIED AND PROTECTED
                                                                                                                   6.     ALL SEDIMENT FENCES ARE TO BE INSTALLED PARALLEL TO CONTOURS UNLESS                                    AREAS FROM DAMAGE RESULTING FROM STORMWATER RUNOFF. TEMPORARY
                   PRIOR TO ANY CONSTRUCTION ACTIVITIES OCCURRING ON SITE.
                                                                                                                          SHOWN OTHERWISE.                                                                                       DIVERSION DRAINS AND OR OTHER DRAINAGE CONTROL DEVICES ARE TO BE
             2.    EXISTING TREES ARE NOT TO BE REMOVED UNLESS NOTED OTHERWISE. TREES TO
                                                                                                                   7.     SEDIMENT FENCES ARE TO BE INSTALLED DOWNHILL AND DIVERSION BANKS UPHILL                                IMPLEMENTED BY THE CONTRACTOR DURING CONSTRUCTION TO MINIMISE THE
                   REMAIN ARE TO BE CLEARLY IDENTIFIED AND PROTECTED IN ACCORDANCE WITH
                                                                                                                          OF STOCKPILES.                                                                                         EFFECTS OF WEATHER.
                   AS4970 PRIOR TO ANY CONSTRUCTION ACTIVITIES OCCURRING ON SITE.
                                                                                                                   8.     TOPSOIL STOCKPILES ARE TO BE MULCHED OR TEMPORARILY VEGETATED IF THEY
             3.    ALL MATERIALS TO BE DEMOLISHED/REMOVED ARE TO BE DISPOSED OFF SITE IN                                                                                                                                    1.11 EXCESS SPOIL MATERIAL GENERATED DURING CONSTRUCTION IS TO BE DISPOSED
                                                                                                                          ARE TO REMAIN FOR MORE THAN 30 DAYS.
                   ACCORDANCE WITH THE RELEVANT LOCAL AUTHORITY, STATE AND COMMONWEALTH                                                                                                                                          OF.
                                                                                                                   9.     MOVEMENT OF CONSTRUCTION EQUIPMENT SHALL BE LIMITED TO THE AREA OF
                   REQUIREMENTS.                                                                                                                                                                                            1.12 ALL FILL MATERIAL PLACED ON THE SITE SHALL COMPRISE ONLY OF NATURAL EARTH
                                                                                                                          WORK AND EXISTING ROADS. CONTRACTOR TO CONSTRUCT ENTRY/EXIT SEDIMENT
             4.    EXISTING SERVICES ARE TO BE RETAINED UNLESS NOTED OTHERWISE.                                                                                                                                                  AND ROCK IS TO BE FREE OF CONTAMINANTS (AS DEFINED BY SECTION 11 OF THE
                                                                                                                          TRAP, REFER IECA STANDARD DRAWINGS. LOCATION TO BE CONFIRMED BY
                   CONTRACTOR TO TAKE DUE CARE TO PROTECT EXISTING SERVICES DURING                                                                                                                                               ENVIRONMENTAL PROTECTION ACT 1994), NOXIOUS, HAZARDOUS, DELETERIOUS AND
                                                                                                                          SUB-CONTRACTOR.
                   CONSTRUCTION.                                                                                                                                                                                                 ORGANIC MATERIALS. SUITABLE FILL MATERIAL IS DEEMED TO COMPLY WITH THE
                                                                                                                   10.    ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED AND
             5.    IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM LOCATION OF EXISTING                                                                                                                                    REQUIREMENTS OF CLAUSE 4.3, AS3798.
                                                                                                                          MAINTAINED AFTER EACH STORM EVENT AND AT REGULAR INTERVALS.
                   SERVICES PRIOR TO UNDERTAKING SITE WORKS.                                                                                                                                                                1.13 SETOUT POINTS ARE DESIGN SURFACE LEVELS AND DENOTE THE LOCATION AND
                                                                                                                   11.    ALL SEDIMENT CONTROL DETAILS SHOWN ARE INDICATIVE ONLY AND FINAL
             6.    CONTRACTOR TO CONFIRM ALL LEVELS AND SETOUT POINTS FROM ESTABLISHED                                                                                                                                           LEVEL OF SPECIFIC SITE FEATURES TO THE TOP OF THE SURFACE TREATMENT OF
                                                                                                                          LOCATIONS ARE TO BE DETERMINED ONSITE AS CONSTRUCTION PROGRESSES BY
                   BENCH MARKS.                                                                                                                                                                                                  SUCH FEATURE (I.E. LEVELS SHOWN AT TOP OF BATTERS INCLUDE TOPSOIL, TURFING
                                                                                                                          THE SUB-CONTRACTOR.
             7.    IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE RELEVANT                                                                                                                                            AND/OR LANDSCAPING).
                                                                                                                   12.    MAINTAIN SEDIMENT CONTROL DEVICES UNTIL NEW GROUND IS ESTABLISHED
                   AUTHORITY TO CONFIRM THE LOCATION AND DEPTH OF ALL EXISTING SERVICES                                                                                                                                     1.14 ALL FINISHED WORKS ARE TO BE FREE DRAINING. WHERE REQUIRED EARTHWORKS
                                                                                                                          AND/OR REVEGETATED, OR UNTIL WRITTEN NOTICE FROM THE CONTRACTOR.
                   PRIOR TO COMMENCEMENT OF WORKS.                                                                                                                                                                               CAN BE MODIFIED LOCALLY TO MAINTAIN A FREE DRAINING CONDITION.
                                                                                                                   13.    BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT DEVICES SHALL BE
             8.    EXTENT OF WORKS BOUNDARY GENERALLY POSITIONED BY EARTHWORKS AND
                                                                                                                          MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION.                                 2. ENVIRONMENTAL CARE
                   ROADWORKS INTERFACE BETWEEN PROPOSED AND EXISTING SURFACE UNLESS
                                                                                                                          SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED BY 25%.                            2.1 PROTECT MATURE "TREES TO REMAIN" WITHIN 3m OF OPERATIONS BY PROVISION OF
                   SHOWN OTHERWISE.
                                                                                                                   14.    ALL DEVICES SHOWN ARE TO BE LOCATED INSIDE THE PROPERTY BOUNDARIES                                     TREE GUARDS COMPRISING 1.8m RUBBER OR HARDWOOD GIRDLES ARRANGED
                                                                                                                          EXCEPT WHERE APPROVED.                                                                                 VERTICALLY.
                                                                                                                   15.    WORK AREAS SHALL BE KEPT DAMP BY USE OF A WATER TRUCK TO CONTROL DUST                             2.2 FILLING AROUND MATURE "TREES TO REMAIN" TO BE CARRIED OUT ONLY AFTER
                                                                                                                          ON SITE.                                                                                               PLACEMENT OF COARSE GRAVEL ENTIRELY SURROUNDING THE TREE AND
                                                                                                                   16.    TOPSOIL AND EXCAVATED MATERIAL SHOULD BE STOCKPILED SEPARATELY.                                        EXTENDING 500mm FROM TRUNK TO FULL DEPTH OF FILL.
                                                                                                                   17.    CARE SHOULD BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE                                        2.3 IN THE EVENT OF ROOT DAMAGE TO MATURE "TREES TO REMAIN," MAKE A CLEAN
                                                                                                                          STORMWATER SYSTEM. PLACE APPROPRIATE SEDIMENT CONTROLS INCLUDING                                       CUT ABOVE THE SEVERED ROOT AND TREAT THE ROOT WITH A SUITABLE FUNGICIDE.
                                                                                                                          SEDIMENT FENCES AROUND STOCKPILES.
                                                                                                                                                                                                                            2.4 LIMIT CONSTRUCTION ACTIVITY OVER AREAS WHICH ARE NOT TO BE DISTURBED BY
                                                                                                                   18.    EARTHWORKS SHALL BE UNDERTAKEN IN ACCORDANCE WITH TECHNICAL
                                                                                                                                                                                                                                 FENCING OFF WITH REGULARLY SPACED POSTS AND COLOURED PLASTIC TAPE.
                                                                                                                          SPECIFICATION AND AS3798.
                                                                                                                   19.    APPROPRIATE SEDIMENT CONTROLS SHOULD BE USED TO PREVENT SEDIMENT FROM                             2.5 ACCESS SHALL BE RESTRICTED TO PRE-EXISTING TRACKS OR THE PATH OF
                                                                                                                          ENTERING THE DOWNSTREAM WATERWAYS AND/OR STORMWATER SYSTEM.                                            DISTURBANCE.
                                                                                                                   20.    PRE-DISTURBANCE SOIL PROFILES AND COMPACTION LEVELS ARE TO BE                                     2.6 CARE FOR STOCKPILES SO AS TO PREVENT EROSION AND SOIL LOSS. AVOID ENTRY
                                                                                                                          REINSTATED. E.G. REINSTATEMENT OF EXISTING FOLLOWING USE OF TEMPORARY                                  OF SEDIMENTS INTO STORMWATER SYSTEM.
                                                                                                                          DEVICES                                                                                           2.7 ENSURE DISTURBED AREAS REMAIN STABLE THROUGHOUT ESTABLISHMENT OF
                                                                                                                   21.    EARTHWORK PROFILES ARE TO BE TRANSITIONED UNIFORMLY BETWEEN                                            VEGETATION AS PER LANDSCAPE ARCHITECTS DRAWINGS.
                                                                                                                          PRESCRIBED SLOPES.                                                                                2.8 SEDIMENT AND EROSION CONTROL MEASURES TO BE IN PLACE PRIOR TO BEGINNING
                                                                                                                                                                                                                                 OF EARTHWORKS OPERATIONS.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Registered Professional
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Registration
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            RPEQ
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Registration Discipline
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            CIVIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Signature                 No.  27812
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            C.BASE                   Date 08.09.22




                                                                                                                                                                                                                                                                                                            145 Ann St Brisbane QLD 4000 Australia
                                                                                                                                                                                                                                                                                                                                                                                                  Client
                                                                                                                                                                                                                                                                                                                                                                                                            MATT BRADLEY DESIGNS PTY LTD                   Drawing
                                                                                                                                                                                                                                                                                                                                                                                                                                                           Title     GENERAL NOTES                                          Size

                                                                                                                                                                                                                                                                                                            GPO Box 668 Brisbane QLD 4001                                                                                                                                                                                   A1
                                                                                                                                                                                                                                           R   THIS DRAWING INCLUDES                                        T 61 7 3316 3000 F 61 7 3319 6038
 B ISSUE FOR DA                                              CB      MG    08.09.22                                                                                                                                                            COLOURED INFORMATION                                         E [email protected] W www.ghd.com
                                                                                                                                                                                                                                       G       COPIES OF THIS DRAWING MUST BE
                                                                                                                                                                                                                                                                                                                                                                                                  Project
                                                                                                                                                                                                                                                                                                                                                                                                            411 BLACK PINCH ROAD DRIVEWAY
 A ISSUE FOR REVIEW                                          CB      MG    05.09.22                                                                                                                                                                                                                                                                                             www.ghd.com
Rev Description                                            Checked Approved Date
                                                                                                                                                                                                                                           B        PRODUCED IN COLOUR

                                                                                                                                                                                                                                                                                                                                                                                                            DESIGN
Author     N. BIRINDWA          Drafting Check D. SIPPEL                                                                                                                                                                                                                                                                                                                            Project No.                                                                                                               Drawing No.   Rev
                                                                                                                                                                                                                                                                                Conditions of Use. This document may only be used by GHD's client (and any other
Designer   C. BASE              Design Check   R. ORTIZ                                                                                                                                                                                                                         person who GHD has agreed can use this document) for the purpose for which it was
                                                                                                                                                                                                                                                                                prepared and must not be used by any other person or for any other purpose.
                                                                                                                                                                                                                                                                                                                                                                                  12592247
                                                                                                                                                                                                                                                                                                                                                                                                  Status
                                                                                                                                                                                                                                                                                                                                                                                                            ISSUE FOR DA                          Status
                                                                                                                                                                                                                                                                                                                                                                                                                                                   Code                                       12592247-C011                 B
Plot Date: 8 September 2022 - 8:36 PM     Plotted by: Cenn Base                        File Name:   C:\12d\SW\data\P-00-12D-001\41-12592247 - 411 Black Pinch Road - Driveway Design_2099\CADD\Drawings\12592247-C011.dwg
Log in to download the original file

Residential driveway design plans.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.