f. No upward lights or vertical illumination of the building, vegetation or other structures
using lighting that shines into the sky to be used.
g. Where lighting is required for safety purposes (including all corridors above ground
level, stairwells, entry points etc.), the lighting of these areas must be activated by
proximity sensors or motion detectors with an associated deactivation of the lighting
after no more than 10 minutes during turtle nesting and hatching season (October –
May). For lighting in other areas, timers, proximity or motion activated light sensors
must be used wherever possible.
h. No decorative outdoor lighting is to be fitted to the buildings, open space or recreation
areas (e.g. Fairy/Christmas lights) during nesting and hatching season (October –
May).
i. Pool lighting must be switched off after 8:00pm during nesting and hatching season
(October – May).
j. All exterior lighting must be shielded by a minimum of 30 cm vertical shielding.
14. Prior to the commencement of the use, a minimum 5-metre-wide landscaped buffer must be
established and maintained along the seaward/rear boundary of the site. The landscaped
buffer must comprise a mix of locally native groundcovers, shrubs and trees, planted at
densities sufficient to provide a continuous vegetation buffer that protects and reinforces the
adjoining coastal dune system.
Plantings are sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
policy and maintained for the life of the use at the site.
Performance Bond
15. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the use. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining properties.
Damage to Services and Assets
17. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Earthworks and Retaining Walls
18. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be contained entirely within the subject site unless
written permission form the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
19. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
Page 14 of 17
Document Set ID: 24579140
Version: 9, Version Date: 31/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0146 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.