Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




23rd March 2015



Kane Constructions Pty Ltd
658 Church Street
Richmond
Vic 3121


Attention: Steve Brophy

Dear Steve


Re: Handover & Maintenance Manual



Fytogreen thank you for the opportunity of working with you.



We do not believe the completion of the project means the end of our working
relationship. To the contrary, we wish this to be the start of an ongoing relationship,
featuring support and assistance as and when required.



Fytogreen provide a comprehensive and client focused solution to all projects and this
continues beyond the traditional scope of the project.



Our mission statement heralds the message “greening the cities of the world” and we
trust you are more than satisfied with the results on this particular project.



We enclose a collection of relevant information that we suggest be retained for future
reference. It includes information on Fytogreen contact personnel, “As Built” drawings,
and Fytowall component specification literature, Care & Maintenance advice and
Warranties.




                   Project Handover & Maintenance Manual
Full text of the other 18 pages

Page 2

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




Fytogreen prides itself on the quality of projects we deliver and adhere strictly to the
guidelines and methods outlined in our Internal Quality Assurance System. Feedback
also allows our Quality Assurance system to evolve and improve over time.



We appreciate your selection of Fytogreen for this project and trust we have met if not
exceeded your expectations. Our commitment to your organisation is genuine and we
look forward to a long and enjoyable association.



If you can spare a few minutes, we would greatly appreciate it if you could provide a
written reference to add to our list of satisfied project referees.



Please do not hesitate to contact us with any query you may have.



Yours sincerely




Matthew Hazewinkel

General Manager

Fytogreen Australia Pty Ltd




                   Project Handover & Maintenance Manual

Page 3

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




CONTENTS


    1.

         Fytogreen Contact Personnel

    2.                                                                                   “
         Care and Maintenance” Information
             (a) Introduction
             (b) Operational Overview
             (c) Host Wall and Surrounds Inspection:
             (d) General Plant Maintenance
             (e) Irrigation System Maintenance & Requirements.
             (f) Fertigation System Maintenance & Requirements
             (g) Fytogreen Vertical Wall Garden Operating Components
             (h) Plant and Growing Modules Inspection and Maintenance Matrix
             (i) Drainage Irrigation and Fertigation System Inspection and Maintenance
                 Matrix
             (j) Drainage Irrigation and Fertigation Individual Components Inspection
                 and Maintenance Matrix

    3.

         Conditional Product and Service Warranty



    4.
         Appendices

             (a)

                   FytoWall Vertical Wall Garden As Built Drawings

             (b)
                   Fytowall Vertical Wall Garden component specification literature

             (c)
                   Fytowall Vertical Wall Garden Irrigation User Guide




                   Project Handover & Maintenance Manual

Page 4

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




                                           Fytogreen Contact Personnel




                   Project Handover & Maintenance Manual

Page 5

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




1. FYTOGREEN CONTACT PERSONNEL


Fytogreen appoint a team to manage and support each project and we confirm the key
personnel should you need to make contact in the future.                     Both general and site
specific contacts have been included herein.



General office contact details                                T         +61 (0) 3 5978 0511

                                                              F         +61 (0) 3 5978 0511

                                                              W         www.fytogreen.com.au

                                                              E         [email protected]




Maintenance Manager                                           Mr.       Erik Van Zuilekom

                                                              M         +61 (0)414 978 794

                                                              E         [email protected]



Victorian Maintenance                                         Mr.       Fergus Alexander-Allan

                                                              M         +61 (0)410 980 196

                                                              E       [email protected]



General Manager                                               Mr.       Matthew Hazewinkel

                                                              M         +61 (0) 438 361 496

                                                              E       [email protected]



Managing Director                                             Mr.       Geoff Heard

                                                              M         + 61 (0)409 787 656

                                                              E         [email protected]




                   Project Handover & Maintenance Manual

Page 6

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




                                     Care & Maintenance Information




                   Project Handover & Maintenance Manual

Page 7

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




2. CARE & MAINTENANCE INFORMATION

(a) Introduction

You can ensure the exceptional standard of the as installed Fytowall is maintained by
caring for it accordingly. The first year of a Fytowall’s life is it’s most important as the root
structure is further established and the Fytowall system settles with the pressures of the local
environment. With a soil-less growing medium and a fully automated irrigation and fertigation
system in place, the level of maintenance required on each installed Fytowall is usually
considered user friendly and manageable by the owner or managing agent.

(b) Operational Overview

Your Fytowall Vertical Wall Garden is controlled by an automatic fully integrated
irrigation system with a Web based reporting and control facility via GSM. The system
delivers water and the necessary nutrient levels on a daily basis to the garden to
maintain plant growth and health. It is essential that the system is fully operational at all
times and supplied with uninterrupted power and water to help ensure the overall
health of the garden. This system can be configured to issue diagnostic updates to the
mobile phones of the maintenance personnel. The Fytowall vertical wall garden installation
has 4 main categories of maintenance, namely host wall maintenance, general plant
maintenance, irrigation system maintenance and fertigation system maintenance.


(c) Host Wall & Surrounds Inspection / Maintenance

For any host wall structural / integrity inspection requirements we recommend that you contact
a structural engineer and have your host wall inspected at least once a year. Due to the
excellent design feature of the Fytowall, the only items in contact with the host wall are the
stainless steel hooked brackets. Therefore behind the growing panels is a 25mm gap / void
between the host wall and the growing module. This should be inspected monthly to be free of
obstruction and debris. Maintenance of the host wall structure should be in strict accordance
with the structural engineers requirements.




                   Project Handover & Maintenance Manual

Page 8

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




(d) General Plant Maintenance

Like any garden a Fytowall vertical wall garden requires routine and ongoing maintenance,
comprising of weeding, pruning, pest control and the occasional replacement of plants.


Weeding;-          Weeds can be summarised as plants that grow where they are not
                     generally wanted, the Fytowall vertical wall garden system utilises a
                     weed barrier system that makes it difficult to weeds to take root.
                     However there are areas of vulnerability at the base of each wall
                     plant, where weeds can take root having been transported to the wall
                     either by the wind or by birds that visit the wall garden. It is
                     recommended that the required weeding be undertaken by hand or
                     via the use of environmentally sustainable herbicides.


Pruning;-           Like all gardens, vertical gardens require pruning from time to time,
                     trimming back the overgrowth of the wall will ensure that all plants
                     have an equal opportunity to thrive and also promotes transpiration.


Pest & Disease;- Controlling pest infestation and disease is an important part of overall
                     wall garden maintenance, the Fytowall vertical wall garden system,
                     whilst utilising pest and disease resistant plant species is susceptible
                     to attack. The majority of pests and disease can be controlled using
                     environmentally sustainable treatments, if identified and remediated
                     early. It is important to note that if a disease has become established
                     it may be necessary to remove and replace the impacted plants.
                     Replacement plants should be from an alternative species as the
                     disease may still exist within the growing medium, even the impacted
                     plants have been removed.




                   Project Handover & Maintenance Manual

Page 9

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




(e) Irrigation System Maintenance & Requirements

The irrigation requirements will vary from site to site, subject to plant species and the
garden aspect. At the time of commissioning of each project, an irrigation program will
be set but will require adjustment based on the season and weather conditions.


Generally:

For an indoor garden, the approximate water budget will be as follows:
            Initial start program: 12 x 4 minutes – 13 lt per day/m2

The exact irrigation requirements will further vary depending on the climatic conditions
in the garden location. During extended periods of extreme climatic conditions (e.g.
heat wave or a prolonged wet period), it is strongly advised to monitor the gardens
condition closely and adjust irrigation requirements as necessary. All irrigation
adjustments should be in strict accordance with this manual read in conjunction with
the “Galcon” GSI Irrigation Controller user manual.

(f) Fertigation System Maintenance & Requirements

The fertigation requirements will vary from site to site, subject to plant species. At the
time of commissioning of each project, an fertigation program will be set, but may
require adjustment based on the how the wall is responding as a whole, as there will
be a variety of species with associated nutrient needs. The fertigation system
comprises a “Dosatron” Compact D injector, which doses the irrigation water with
nutrients from the two fertigation containers below, which accommodates the
hydroponic nutrient solution.


The Dosatron operates on water flow, and each time the irrigation system is on,
nutrient/fertiliser solution is being mixed with the irrigation water at 0.15% solution. The
quantity used will depend on the time of the year. It is strongly advised to monitor the
gardens condition closely and adjust % nutrient/fertiliser solution as necessary. All
fertigation adjustments should be in strict accordance with this manual read in
conjunction with the Dosatron user manual.




                   Project Handover & Maintenance Manual

Page 10

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




However general mixing Instructions are summarised as follows:


Generally
Tank A           Combi-sol 6+8+30+TE diluted at a rate of 40 grams per litre of water.
                 Mixed until Combi-sol is fully dissolved and a consistent solution is
                 achieved


Tank B           Calcium Nitrate diluted at a rate of 20 grams per lire of water
                 Place some water in tank B, then in a separate container, add 5 litres of
                 hot water, into the hot water place required amount of Calcium Nitrate.
                 Stir until dissolved to a uniform solution, and then add to tank B.

(g) Fytowall Vertical Wall Garden Operating Components

Components with moving parts on a Fytowall Vertical Garden are as follows:


             •    Galcon GSI Irrigation Controller
             •    Hunter Master Solenoid valve with Flow Control.
             •    Dosatron Compact D Fertigation injector.
             •    Caleffi Pressure Reducing valve with Pressure Gauge.
             •    MV80 Solenoid valves for each irrigation zone
             •    Dual check valve
             •    Y strainer
             •    Ball valves (as required)
             •    Swing check valves (as required)
             •    Water meter with pulse output


It is essential that all parts and components are fully operational, checked and
maintained on a regular basis.




                   Project Handover & Maintenance Manual

Page 11

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




(h) Plant and Growing Modules Inspection and Maintenance Matrix:

 Area of       Inspection Item                   Inspection     Inspection Procedure as                 Necessary Action
 Attention                                       Frequency      applicable to detailed/cursory       (Recommend contact
                                                                inspections                         Fytogreen Australia Pty
                                                                                                               Ltd)
                                                                Inspect each growing module
                                                                                                     If damage to panels or
                Check for physical damage to                    panel at close range for signs
                                                                                                   surrounding cage structure
                growing medium foam panels                      of damage to both the growing
                                                                                                    are affecting plant growth
                and any related adverse plant                   medium and surrounding cage
                                                                                                   then repair or replace panel
                      growth problems                           structure as applicable to visit
                                                                              type


                                                                   Look for any sagging or          Repair or replace panels
                 Check panel cages are well
                                                                drooping growing modules that        cage or stainless steel
                secured to vertical wall frame
                                                                 may not be properly secured       holding hooks if damaged
                                                                     to the vertical frame.
                                                   Cursory
                                                  Inspection     Push gently, using the index
                                                   required       finger, on the top third and
                                                 6 times year   bottom third of panel to see if
                                                                                                   Repair of replace irrigation
                                                  / from the     water comes out easily. The
                                                                                                     drip lines if damaged or
   General                                        ground or       medium should neither be
                 Check for water volume in                                                                    faulty
  gardening                                         ladder        saturated or dry, however
                      growing medium
  and review                                                          uniformly moist as
                                                                                                   Adjust levels of irrigation if
  of growing                                          &            demonstrated during the
                                                                                                    panels excessively wet or
   medium                                                       Fytogreen handover briefing /
                                                                                                         excessively dry
   modules                                         Detailed            training session
                                                 Inspections     (Refer to Fytogreen Irrigation
                                                  required 4             Users Guide)
                                                 times a year                                      Possibly remove struggling
                 Check general plant growth                      Cursory / detailed inspection
                                                                                                   plant species or overplant
                  condition – are all or only                   of all plant species growing in
                                                                                                   with another more suitable
                        some healthy                             panels as appropriate to visit
                                                                                                          plant species
                  Check for weeds growing                                 As Above                       Remove weeds
                                                                                                   Remove the defeated plant
                   Check for dead plants                                  As Above                  species and re-plant with
                                                                                                        different species
                                                                                                   Remove and clean affected
                Check for signs of disease or
                                                                          As Above                 species. If problem persists
                        pest damage
                                                                                                      spray with insecticide
                  Check for uncontrolled or
                                                                                                   Prune and remove excess
                         over-growth                                      As Above
                                                                                                         plant material.




                   Project Handover & Maintenance Manual

Page 12

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




(i) Drainage, Irrigation and Fertigation System General Inspection and Maintenance
Items:

                                                                                                      Necessary Action
                                               Inspection   Inspection Procedure as applicable    (Recommend contact
 Area of Attention     Inspection Item
                                               Frequency      to detailed/cursory inspections    Fytogreen Australia Pty
                                                                                                             Ltd)


                                                               Check all drainage points for
                                                              accumulation of fallen debris,
                     Check all drainage                                                              Remove and clean
                                                            leaves and weeds at all drainage
                            points                                                                     drainage points
                                                              points throughout the Fytowall
                                                                         system
    Automated                                Inspection
    Irrigation &                             required 10
                                                             Check for leaks or overflows of     Repair or replace drainage
  Fertigation unit      Drainage tray        times a year
                                                                      drainage trays              tray if damaged or faulty
   and System
    Generally         Irrigation drip-line                  Check for blocks or breaks in the
                     primary connection                       irrigation hose by conducting       Repair or replace faulty
                     points at low level                          general irrigation test              hose sections



                     Hydroponic nutrient                       Check levels of hydroponic          Replenish hydroponic
                           solution                                  nutrient solution           nutrient solution if required




                     Project Handover & Maintenance Manual

Page 13

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




(j) Drainage, Irrigation and Fertigation Individual Components Inspection and
    Maintenance Items:
                                                                                                              Necessary Action
      Area of                                Inspection      Inspection Procedure as applicable            (Recommend contact
                       Inspection Item
     Attention                               Frequency         to detailed/cursory inspections           Fytogreen Australia Pty
                                                                                                                      Ltd)
                                                            Check power / operation and run self             Repair / Replace as
                     Galcon GSI Irrigation                              diagnostic test                   required if faulty; Call the
                          Controller                        (Refer to Fytogreen Irrigation Users         Manufacturer for Technical
                                                                             Guide)                                support)
                        Hunter Master                           Check that the solenoid valve is             Repair / Replace as
                     Solenoid valve with                        regulating flow, (Listen for clicks             required faulty
                         Flow Control                             sounding) open on actuation                 valve/component
                                                                                                          Repair / Replace / clean
                                                              Checks leaking seals, suction tube
                                                                                                          as required faulty / dirty
                                                            connections (no leaks) and that filter are
                     Dosatron Compact D                                                                      valves/components
                                                             clean. Check bypass valve for correct
                      Fertigation injector   Inspections                                                       Call “Dosatron”
                                                             operation (Listen for clicking noise of
                                              required 6                                                 Manufacturer for Technical
                                                                    pump during operation)
                                             times a year                                                          support)
                                                            Check static / operational pressuring
                      “Caleffi” Pressure                                                                  Inspect / clean / replace as
    Automated                                                  on valve (should read 350kpa –
                     Reducing valve with                                                                       per manufactures
    Irrigation &                                            (Refer to Fytogreen Irrigation Users
                       Pressure Gauge                                                                             Instructions
  Fertigation unit                                                           Guide)
    individual         MV80 Solenoid                            Check operation and run self             Inspect / replace with equal if
   components          valves for each                           diagnostic test via Irrigation            damaged or faulty (Refer
                        irrigation zone                                    Controller                         specification sheet)
                                                             Check for correct operation during          Inspect / replace with generic
                      Dual check valve                       and after normal operation (should           valve if damaged or faulty
                                                                          be no leaks)                    (refer general spec sheet)

                          Ball valves                                      As above                                As above

                          Y strainer                          Unscrew, check port, check filter,
                                                                                                                   As above
                                                              should appear in clean condition

                     Swing check valves                                    As above                                As above

                                                             Check for leaks, correct readings /         Inspect / replace as required
                       Water meter with                        output by performing a general               damaged or faulty units
                         pulse output                        operations test (Refer to Fytogreen          (Call BES - Manufacturer
                                                                    Irrigation Users Guide)                for Technical support)




                     Project Handover & Maintenance Manual

Page 14

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




               Conditional Product and Service Warranty




                   Project Handover & Maintenance Manual

Page 15

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




3. CONDITIONAL PRODUCT & SERVICE WARRANTIES


Subject to Fytogreen Australia being awarded the ongoing maintenance of the vertical
wall garden, elements of your installation will be covered by Fytogreen’s warranty for a
period of 5 years from practical completion. These warranties include the following:
             •    Stainless steel fixing hooks
             •    Fytowall module galvanised mesh brackets
             •    Fytowall module fabric
             •    Fytowall foam growing media
             •    Drip irrigation lines, valves and associated fittings
             •    Irrigation control unit, and associated reticulation
             •    Dosatron control unit, sensors and associated reticulation
Unfortunately being a natural component the warranty does not include plant materials




                   Project Handover & Maintenance Manual

Page 16

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




                                                                      Appendices




                       Project Handover & Maintenance Manual

Page 17

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




APPENDIX A




FYTOWALL VERTICAL WALL GARDEN
AS BUILT DRAWINGS




                       Project Handover & Maintenance Manual

Page 18

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




APPENDIX B




FYTOWALL VERTICAL WALL
GARDEN    COMPONENT    SPECIFICATION
LITERATURE
            1. GALCON GSI IRRIGATION CONTROLLER
            2. HUNTER MASTER SOLENOID VALVE WITH FLOW CONTROL.
            3. DOSATRON COMPACT D FERTIGATION INJECTOR.
            4. CALEFFI PRESSURE REDUCING VALVE WITH PRESSURE GAUGE.
            5. DUAL CHECK VALVE
            6. Y STRAINER
            7. SWING CHECK VALVES (AS REQUIRED)
            8. WATER METER WITH PULSE OUTPUT




                       Project Handover & Maintenance Manual

Page 19

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




APPENDIX C

FYTOWALL VERTICAL WALL
GARDEN USERS IRRIGATION GUIDE


Irrigation Control Settings

Caleffi Pressure Reducer Settings                    -Static Pressure   240 kPa
                                 -                   Operating Pressure 180 kPa


Current Programmed Runtimes (mins)

Start Time    Zone 0     Zone 1     Start Time     Zone 0     Zone 1   Start Time   Zone 0   Zone 1
7.00          4 min      4 min      11.00          4 min      4 min    15.00        4 min    4 min
8.00          4 min      4 min      12.00          4 min      4 min    16.00        4 min    4 min
9.00          4 min      4 min      13.00          4 min      4 min    17.00        4 min    4 min
10.00         4 min      4 min      14.00          4 min      4 min    18.00        4 min    4 min

Site Notes

If litres per cycle start to drop dramatically during runtimes, immediately refer to
pressure gauge in irrigation cabinet to ensure correct readings. Run a program to
check operating pressure and general system. If operating pressure is low,
immediately contact site plumber.




                       Project Handover & Maintenance Manual

Used in these records

About this file

File size
301 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Green wall Handover Manual.2.pdf · 301 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.