Council archive · source document
Green wall Handover Manual.2 · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
CONTENTS
1.
Fytogreen Contact Personnel
2. “
Care and Maintenance” Information
(a) Introduction
(b) Operational Overview
(c) Host Wall and Surrounds Inspection:
(d) General Plant Maintenance
(e) Irrigation System Maintenance & Requirements.
(f) Fertigation System Maintenance & Requirements
(g) Fytogreen Vertical Wall Garden Operating Components
(h) Plant and Growing Modules Inspection and Maintenance Matrix
(i) Drainage Irrigation and Fertigation System Inspection and Maintenance
Matrix
(j) Drainage Irrigation and Fertigation Individual Components Inspection
and Maintenance Matrix
3.
Conditional Product and Service Warranty
4.
Appendices
(a)
FytoWall Vertical Wall Garden As Built Drawings
(b)
Fytowall Vertical Wall Garden component specification literature
(c)
Fytowall Vertical Wall Garden Irrigation User Guide
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.