SUPERSEDED - Minor Change Existing Approval 51983 3225 15 [As Published]
- Landscape Concept Design document -
including site plan and perspective, cross
sections, look and feel and design, prepared
by Louise Custance
Approved Plans – 21 October 2021 Units 9-10 (Lot 30 SP307674)
Plan No. Plan, prepared by Date
SD.102 Proposed Holyman Unit 3D perspectives, N/D
prepared by Gerard Smith Design
Iss P2
SD.104 Site / Roof Plan, prepared by Gerard Smith Aug 2018
Iss P10 Design
SD.201 Floor Plans, prepared by Gerard Smith Design Aug 2018
Iss P9
SD.501 Elevations proposed, prepared by Gerard Aug 2018
Iss P9 Smith Design
SD.601 Cross Sections – Sheet 2, prepared by Gerard Aug 2018
Iss P2 Smith Design
SD.951 Overviewing Diagrams – Level 1, prepared by Aug 2018
Iss P9 Gerard Smith Design
SD.952 Overviewing Diagrams – Level 2, prepared by Aug 2018
Iss P9 Gerard Smith Design
3 Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council prior to
obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site for
pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with the
proposed construction works that need to be onsite or in proximity to the site at
any time during the phases of the construction works. Where relevant, time slots
and off-peak hours should be indicated. All efforts must be made to prevent or
minimise adverse impact on public parking availability in the local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the final
Construction Management Plan and the Traffic Management Plan.
Page 6 of 14
Document Set ID: 22058500
Version: 4, Version Date: 04/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.