                                                                                           2010/783



4.    The jetty shall be constructed such that no part of the jetty stands less than 3.0 metres from
      the prolongation of the side boundary lines of the subject site as described in section 1.1 of
      Council’s Planning Scheme Policy 4 – Domestic Marine Uses Outside of Noosa Waters
      Estate.
5.    Structures shall be designed and constructed such that they are free standing within the
      waterway and are not connected to or behind the revetment wall or rock wall.
6.    A rigid handrail shall be fitted on one side of the walkway.
7.    No posts or vertical supports of the proposed jetty shall extend vertically from the structure unless
      they provide support for the handrail.
8.    No boatlifting devices shall be attached or moored at the jetty structure for the purpose of
      elevating a vessel above the water without Council approval.
9.    The jetty shall be constructed in a manner to render the underside area vermin proof.
10.   There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
      the revetment wall.
11.   Lighting associated with the use shall be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
12.   The jetty shall be used for private purposes only with no commercial operations are to be
      undertaken.
13.   Boat repair activities are not permitted on site.
14.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
15.   The mooring facility shall not be utilised for live-aboard purposes.
16.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
      1994 and the Environmental Protection (Water) Policy 1997.
17.   The approval or conditions do not constitute a ruling on structural safety and the applicant
      must make their own arrangements to ensure adequacy of design and work. Also any
      approval granted does not warrant that such plans and specifications have been checked in
      detail, nor does it absolve the owner of the land from complying with all the conditions of this
      approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
      statutory regulations in the execution and/or performance of said works. The Council does not
      accept any responsibility for the accuracy of such plans and specifications as approved.
18.   Certification by a Registered Professional Engineer of Queensland must be submitted to
      Council prior to the return of any bond monies held by Council. The certification must state
      that the jetty has been constructed in accordance with best practice methods, is in accordance
      with Coastal Protection and Management Act 1995, is structurally sound and will have no
      detrimental affect on the existing revetment walls.
19.   A final inspection and approval of the structure by Council’s Inspector is also required prior to
      the return of any bond monies held by Council. Please contact Council’s Planning Assessment
      Section to arrange the inspection.
20.   The jetty shall be licensed with the Council upon completion of the structural work and must be
      licensed annually thereafter.
21.   No construction work is to be undertaken until separate approval is granted by the
      Environmental Protection Agency (Coastal Management Branch) and any requirements of the
      Department of Transport and Department of Primary Industries have been met.
Relevant Period
22.   The Development Permit for Operational Works (Jetty) lapses if the works have not been
      completed by 3 August 2012, unless an application to extend the relevant period is approved
      by Council.1
                                                                                         Page 2 of 9

Used in these records

About this file

File size
218 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000783.001 [As Published].pdf · 218 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.