Council archive · source document
SPA Decision Notice - 010.2010.00000783.001 [As Published] · 142010.783
2010/783 Page 7 of 9 [OCR of page images] 2010/783 10. 1k The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel clearance at all stages of tide, The ship must comply with any local restrictions placed on channel depths and draft restrictions. Any ships and equipment you or your agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004. Any ship moored at this jetty must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures, Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the jetty must not exceed the following sizes: Wet Berth Dry Berth Length Overall - 5 metres NA Beam - 2 metres The contractor must construct the jetty within two years from the date of approval. If construction is not completed, you will need additional or amended comments from the Regional Harbour Master. Maritime Safety Queensland does not need to be further consulted if all of the above conditions are met, The above conditions must be included in your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. Yours sincerely Captain Richard C Johnson Regional Harbour Master (Brisbane) Page 2 of2 Page 7 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000783.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 218 KB (small file)
- File type
No other editions are linked here.