IDAS Form 6

Attached to the e-mail OPW15/0134 Application for Operational Works - 60 Hofmann Dr Noosaville.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

IDAS form 6—Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)


This form must be used for development applications for building work or operational work assessable against a
planning scheme.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

For all development applications, you must:
     complete IDAS form 1—Application details
     complete any other forms relevant to your application
     provide any mandatory supporting information identified on the forms as being required to accompany your
     application.
Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.

This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.

This form can also be completed online using MyDAS at www.dsdip.qld.gov.au/MyDAS

Mandatory requirements

1.      What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
        boxes.)

             Building work—complete Table A                          Operational work—complete Table B

Table A
a)     What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
       building)?




b)     Are there any current approvals associated with this application? (e.g. material change of use.)
             No                 Yes— provide details below

     List of approval reference/s                            Date approved (dd/mm/yy)    Date approval lapses (dd/mm/yy)
Log in to download the original file

IDAS Form 6.pdf · 75 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 4 pages

Page 2

Table B
a)    What is the nature of the operational work? (Tick all applicable boxes.)
            Road works                       Stormwater              Water infrastructure

            Drainage works                   Earthworks              Sewerage infrastructure

            Landscaping                      Signage                 Clearing vegetation under the planning scheme

            Other—provide details

b)    Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
           No          Yes—specify the number of lots being created

c)    Are there any current approvals associated with this application? (E.g. material change of use.)
           No          Yes—provide details below

     List of approval reference/s                   Date approved (dd/mm/yy)          Date approval lapses (dd/mm/yy)
     MCU11/0254 (SCRC)                              20/08/12                          20/08/16




2.      What is the dollar value of the proposed building work?                                       $
        (Inc GST, materials and labour.)

3.      What is the dollar value of the proposed operational work?                                    $286,500
        (Inc GST, materials and labour.)

Mandatory supporting information

4.      Confirm that the following mandatory supporting information accompanies this application

Mandatory supporting information                                                    Confirmation of       Method of
                                                                                    lodgement             lodgement

All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are                    Confirmed         Email
recommended scales) which shows the following:
     the location and site area of the land to which the application relates
     (relevant land)
     the north point
     the boundaries of the relevant land
     the allotment layout showing existing lots, any proposed lots (including the
     dimensions of those lots), existing or proposed road reserves, building
     envelopes and existing or proposed open space (note: numbering is
     required for all lots)
     any existing or proposed easements on the relevant land and their
     function
     any access limitation strips
     all existing and proposed roads and access points on the relevant land.


                                                                           IDAS form 6—Building or operational work assessable
                                                                                                    against a planning scheme
                                                                                                      Version 3.0—1 July 2013

Page 3

A statement about how the proposed development addresses the local                      Confirmed         Email
government’s planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development                    Confirmed
Assessment Provisions (SDAP).                                                           Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are                     Confirmed
recommended scales) which show the following:                                           Not applicable
    the north point
    the intended use of each area on the floor plan (for commercial, industrial
    or mixed use developments only)
    the room layout (for residential development only) with all rooms clearly
    labelled
    the existing and the proposed built form (for extensions only)
    the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are                     Confirmed
recommended scales) which show plans of all building elevations and                     Not applicable
facades, clearly labelled to identify orientation (e.g. north elevation).
Plans showing the size, location, proposed site cover, proposed maximum                 Confirmed
number of storeys, and proposed maximum height above natural ground level               Not applicable
of the proposed new building work.
Plans showing the extent of any demolition that is assessable development.              Confirmed
                                                                                        Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing:                                                                       Confirmed         Email
   existing and proposed contours                                                       Not applicable
   areas to be cut and filled
   the location and level of any permanent survey marks or reference
   stations used as datum for the works
   the location of any proposed retaining walls on the relevant land and their
   height
   the defined flood level (if applicable)
   the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing:                                                                       Confirmed
   existing and proposed contours                                                       Not applicable
   the centreline or construction line showing chainages, bearings, offsets if
   the construction line is not the centreline of the road and all intersection
   points
   information for each curve including tangent point chainages and offsets,
   curve radii, arc length, tangent length, superelevation (if applicable) and
   curve widening (if applicable)
   kerb lines including kerb radii (where not parallel to centreline) and
   tangent point changes (where not parallel to centreline)
   edge of pavement where kerb is not constructed
   position and extent of channelisation
   location and details of all traffic signs, guideposts, guardrail and other
   street furniture
   pavement markings including details on raised pavement markers

                                                                            IDAS form 6—Building or operational work assessable
                                                                                                     against a planning scheme
                                                                                                       Version 3.0—1 July 2013

Page 4

   catchpit, manhole and pipeline locations
   drainage details (if applicable)
   cross road drainage culverts (if applicable)
   concrete footpaths and cycle paths
   location and details for access points, ramps and invert crossings
   changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing:                                                                      Confirmed         Email
   existing and proposed contours                                                      Not applicable
   drainage locations, diameters and class of pipe, open drains and
   easements
   manhole location, chainage and offset or coordinates and inlet and outlet
   invert levels
   inlet pit locations, chainage and offset or coordinates and invert and kerb
   levels.
Applications for operational work involving water reticulation
Drawings showing:                                                                      Confirmed
   kerb lines or edge of pavement where kerb is not constructed                        Not applicable
   location and levels of other utility services where affected by water
   reticulation works
   pipe diameter, type of pipe and pipe alignment
   water main alignments
   water supply pump station details (if applicable)
   minor reservoir details (if applicable)
   conduits
   location of valves and fire hydrants
   location of house connections (if applicable)
   location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing:                                                                      Confirmed
   location of all existing and proposed services                                      Not applicable
   location of all existing and proposed sewer lines and manhole locations
   location of all house connection branches
   kerb lines or edge of pavement where kerb is not constructed
   chainages
   design sewer invert levels
   design top of manhole levels
   type of manhole and manhole cover
   pipe diameter, type of pipe and pipe alignment
   location of house connections (if applicable)
   sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing:                                                                      Confirmed
   location of all light poles and service conduits                                    Not applicable
   location of all other cross road conduits
   type of wattage and lighting
   any traffic calming devices
   additional plans for roundabouts and major roads (if applicable)
   details of any variations to normal alignment

                                                                           IDAS form 6—Building or operational work assessable
                                                                                                    against a planning scheme
                                                                                                      Version 3.0—1 July 2013

Page 5

        details of lighting levels.
    Applications for operational work involving public utility services
    Drawings showing:                                                                      Confirmed
        any existing light poles and power poles                                           Not applicable
        any existing underground services
        details of proposed services
        alteration to existing services.
    Applications for operational work involving landscaping works
    Drawings showing:                                                                      Confirmed         Email
        the location of proposed plant species                                             Not applicable
        a plant schedule indicating common and botanical names, pot sizes and
        numbers of plants
        planting bed preparation details including topsoil depth, subgrade
        preparation, mulch type and depth, type of turf, pebble, paving and garden
        edge
        the location and type of any existing trees to be retained
        construction details of planter boxes, retaining walls and fences
        the proposed maintenance period
        irrigation system details.

   Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the
   use of information recorded in this form.


   OFFICE USE ONLY

    Date received                                              Reference numbers


   The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
   Planning. This form and all other required application materials should be sent to your assessment manager and any
   referral agency.




Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68)                                                         IDAS form 6—Building or operational work assessable
[email protected]                                                                                   against a planning scheme
                                                                                                          Version 3.0—1 July 2013
www.dsdip.qld.gov.au

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.