Noosa on Weyba

Stormwater Management Plan

5101/19-03




   Insert report title here
   Prepared for
   Northbrook Corporation Pty Ltd
   Insert project name
   16 September 2013

   Insert job reference
Full text of the other 65 pages

Page 2

Noosa on Weyba
Stormwater Management Plan


                                                                                                                  Cardno (Qld) Pty Ltd

                                                                                                                   ABN 57 051 074 992

                                                                                                    Level 11 Green Square North Tower

                                                                                                                  515 St Paul’s Terrace

                                                                                                               Fortitude Valley Qld 4006

                                                                                                      Locked Bag 4006 Fortitude Valley

                                                                                                             Queensland 4006 Australia

                                                                                                               Telephone: 07 3369 9822

                                                                                                                Facsimile: 07 3369 9722

                                                                                                         International: +61 7 3369 9822

                                                                                                                [email protected]

                                                                                                                  www.cardno.com.au




Document Information
Prepared for                     Northbrook Corporation Pty Ltd
Project Name                     Noosa on Weyba
File Reference                   O:\5101-19-03\wp\R3v4 SMP\SMP_v4.docx

Job Reference                    5101/19-03
Date                             16 September 2013



Document Control
Version        Date                        Author                                Author        Reviewer                             Reviewer
                                                                                 Initials                                           Initials

      1        31 October 2012             Nadia Guterres                        NG            Michael Della                        MD

      2        29 November 2012            Nadia Guterres                        NG            Michael Della                        MD

      3        19 April 2013               Nadia Guterres                        NG            Michael Della                        MD

      4        16 September 2013           Nadia Guterres                                      Michael Della




"© 2013 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior
written consent of Cardno.”




Northbrook Corporation Pty Ltd                              Version 4                                               16 September 2013
SMP_v4.docx                                           Commercial in Confidence                                                 Page ii

Page 3

Noosa on Weyba
Stormwater Management Plan




Table of Contents
1       Introduction                                                                                     1
2       Site Description                                                                                 3
3       Proposed Development                                                                             4
4       Integrated Water Cycle Management Plan                                                           6
5       Water Quality Objectives                                                                         7
        5.1        Stormwater Quality Objectives                                                         7
        5.2        Noosa River Environmental Values and Water Quality Objectives                         8
        5.3        Water Quality Monitoring                                                              9
        5.4        Water Quality Testing Results                                                        12
6       Proposed WSUD Strategy                                                                          13
        6.1        Summary                                                                              13
        6.2        Treatment Device Details                                                             14
                   6.2.1         Rainwater Tanks                                                        14
                   6.2.2         Bio-retention Basins                                                   14
                   6.2.3         Bio-retention Gardens                                                  15
                   6.2.4         Bio-retention Swales                                                   16
                   6.2.5         Litter Baskets                                                         17
7       MUSIC Modelling                                                                                 18
        7.1        Summary                                                                              18
        7.2        Catchment Areas                                                                      18
        7.3        Treatment Devices                                                                    19
                   7.3.1         Rainwater Tanks                                                        19
                   7.3.2         Bio-retention Basins and Bio-retention Gardens                         20
                   7.3.3         Bio-retention Swales                                                   21
                   7.3.4         Vegetated Swales                                                       22
                   7.3.5         Litter Baskets                                                         23
8       MUSIC Model Results                                                                             24
        8.1        Load Reduction                                                                       24
        8.2        Sensitivity Analysis                                                                 24
        8.3        Without Rainwater Tanks                                                              25
        8.4        Frequent Flow Objective                                                              26
        8.5        Waterway Stability                                                                   26
9       Conclusion                                                                                      27




Northbrook Corporation Pty Ltd                            Version 4                16 September 2013
SMP_v4.docx                                         Commercial in Confidence                 Page iii

Page 4

Noosa on Weyba
Stormwater Management Plan




Tables
Table 5-1      Water Quality Monitoring Parameters ......................................................................................... 11
Table 5-2      Water Quality Testing Results..................................................................................................... 12
Table 7-1      MUSIC Sub-catchments .............................................................................................................. 18
Table 7-2      Rainwater Tank Details ............................................................................................................... 20
Table 7-3      Bio-retention Basin and Bio-retention Garden Details ................................................................ 21
Table 7-4      Bio-retention Node Details .......................................................................................................... 22
Table 7-5      Swale Node Details ..................................................................................................................... 22
Table 7-6      Vegetated Swale Details ............................................................................................................. 22
Table 8-1      Pollutant Load Reductions .......................................................................................................... 24
Table 8-2      Comparison to Existing Case ...................................................................................................... 24
Table 8-3      Sensitivity Analysis Results ......................................................................................................... 25



Figures
Figure 1       Site Location
Figure 2       Sub-catchments
Figure 3       Proposed Stormwater Treatment – Areas A to G
Figure 4       Proposed Stormwater Treatment – Areas H and I
Figure 5       Proposed Stormwater Treatment – Areas J to L



Appendices
Appendix A         Concept Masterplan
Appendix B         Water Quality Monitoring
Appendix C         Community Information Leaflet
Appendix D         Underground Rainwater Tank Example
Appendix E         MUSIC Model Layouts
Appendix F         Maintenance Plan
Appendix G         Response to Information Request




Northbrook Corporation Pty Ltd                                   Version 4                                                         16 September 2013
SMP_v4.docx                                                Commercial in Confidence                                                          Page iv

Page 5

Noosa on Weyba
Stormwater Management Plan




1              Introduction

This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
                            th
Regional Council dated 28 February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix G, which locates the responses to the relevant RFI items within the
report for ease of reference.
The subject site, known as Noosa on Weyba, encompasses the following lots:
The Northbrook Pty Ltd land:
     Lot 1667 on M3772                    44.4 ha
     Lot 11 on RP893393                   40.7 ha
     Lot 12 on RP893393                   0.61 ha
The J & K Hofmann land:

     Lot 7 on RP46782                     1.99 ha
     Lot 2 on RP160983                    93.1 ha
     Lot 2 on SP179590                    12.5 ha
     Lot 53 on SP163571                   110.0 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of site dedicated as greenspace and
conservation areas. The developed areas are contained within Lot 11 and 12 on RP893392, Lot 2 on
SP179590 and Lot 53 on SP163571. The concept master plan for the development is shown in Appendix A.
The development will be conducted under a Community Title Scheme.
The concept master plan has been modified slightly since stormwater quality modelling contained in this
report was completed. As the stormwater treatment strategy has not been changed and detailed stormwater
quality modelling will be required at the detailed design stage it is was not considered necessary to update
the stormwater quality modelling.
The site ultimately drains to Lake Weyba, which is a declared Fish Habitat Area. A section of the site is also
located in the Water Resource Catchment Area as defined by the Maroochy Plan 2000. Therefore the
treatment of stormwater to the best possible standard is of the upmost importance. A significant portion of
the site is currently used for rural purposes, in particular the grazing of cattle. Consequently the
development provides an opportunity to improve the quality of stormwater being discharged from the site if
appropriate measures are adopted.
To ensure that the impact of the development is minimised, the principles of water sensitive urban design
(WSUD) have been adopted. These principles (sourced from Urban Stormwater Planning Guidelines
Queensland Department of Environment and Heritage Protection (DEHP), 2010) include:
     the protection of existing natural water features;
     the integration of public open space with stormwater drainage corridors to maximise public access and
      recreation and preserve waterway habitats and wildlife corridors;
     the maintenance of the natural hydrologic behaviour of catchments by preserving the natural water
      cycle;
     the protection of water quality environmental values;
     the minimisation of the demand on the reticulated water supply system and utilisation of stormwater as
      a valued resource;
     the minimisation of capital and maintenance costs of stormwater infrastructure; and

Northbrook Corporation Pty Ltd                       Version 4                               16 September 2013
SMP_v4.docx                                    Commercial in Confidence                                Page 1

Page 6

Noosa on Weyba
Stormwater Management Plan



     the integration of water into the landscape to enhance visual, social, cultural and ecological values.
The aim of this report is to determine the overall WSUD strategy for the site. Further analysis will be
conducted during the detailed design stage. This report will:
     Determine the relevant water quality objectives (WQO) for the site;
     Outline the water sensitive urban design (WSUD) measures that will be adopted for each precinct and
      the site as a whole; and
     Conduct MUSIC modelling to determine whether WQOs can be met.
     The purpose of this version of the report is also to address the relevant items in the Request for
                                                                                      th
      Information (RFI) received from Sunshine Coast Regional Council (SCRC) on the 28 of February 2013
      (DW008:MCU12/0208).




Northbrook Corporation Pty Ltd                      Version 4                                    16 September 2013
SMP_v4.docx                                   Commercial in Confidence                                     Page 2

Page 7

Noosa on Weyba
Stormwater Management Plan




2              Site Description

The location of the site is shown in Figure 1.
The J & K Hofmann land is bounded by Hollett Road to the south, Eenie Creek to the north and it includes
lots on both sides of Walter Hay Drive. Ephemeral tributaries of Eenie Creek run through or adjacent to
these lots. An existing farm dam is also located within this area. The site is currently used for rural purposes
and the majority of the site is densely vegetated with sections that have been cleared for grazing purposes.
The site is relatively steeply sloped, and the tributaries are well defined, except for the area just to the north
of Hollett Road where the ground is fairly flat and flows disperse over a wide area.
The Northbrook Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by
Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The
majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba,
historically known as Keyser Creek, is located within Lot 11, and drains from south to north. A dam is also
located in this area. Keyser Creek, within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to
1.1 mAHD. A track located along the northern boundary of the site currently acts as a bund controlling
outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser
Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat
with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains
towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern
section of Lot 11 drains towards Lake Weyba and is generally moderately sloped with a grade of around 5
percent, and levels from 0.5 to 14.5 mAHD.
Lake Weyba is connected to Noosa River via Weyba Creek.
A geotechnical investigation of the site was carried out; refer Geotechnical Investigation (Cardno, August
2012). The results of this study concluded that subsurface conditions at the site generally consisted of a
layer of either loose sands or soft to firm clay underlain by stiff or better clays. Weathered rock was
encountered in some of the boreholes. These soils types indicate that infiltration of stormwater will not be a
suitable method of disposal.
The 1:100000 Gympie Special geological map indicated that the expected subsurface strata across the site
would contain Quaternary alluvium along with lithofeldspathic labile and sublabile to quartzose sandstone,
siltstone, shale and coal from the late Triassic-Jurassic era. The geology map also indicates a regolith with
deep weathering profile. The quaternary alluvium may indicate a possibility of acid sulphate soil (ASS). Soil
tests conducted showed that actual and potential ASS was unlikely to be located on the site. However,
further testing and sampling is recommended once the area of disturbance is finalised. An acid sulphate soil
management plan will be required.




Northbrook Corporation Pty Ltd                     Version 4                                     16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                      Page 3

Page 8

Noosa on Weyba
Stormwater Management Plan




3              Proposed Development

The concept development plan is shown in Appendix A. A summary of what is proposed in each precinct is
provided below.
Precinct 1
Area A
Area A is located within Lot 12 of the Northbrook site, adjacent to Lake Weyba, and consists of an existing
residence that will be renovated to provide facilities for residents of Noosa on Weyba.
Area B
Area B is located within Lot 11 of the Northbrook site, adjacent to Lake Weyba. It drains to the north-east
and the south-east towards Lake Weyba. This precinct is generally sloped at around 5 percent, with flatter
areas around the crest. 73 premium residential lots are proposed in this precinct.
Area C
Area C is located in the eastern section of Lot 11, and drains north-east towards Lake Weyba. The average
slope in this area is around 2 percent. Apartments and mixed use areas are proposed in this area, with
              2
around 600 m of commercial area.
Area D
Area D is located in the eastern section of Lot 11, and drains north-west towards Keyser Creek. The average
slope in this area is around 3 percent. 83 townhouses are proposed.
Area E
Area E is located in the eastern section of Lot 11, and drains west towards Keyser Creek. The average
slope in this area is around 3 percent. Retirement living and aged care facilities consisting of 120 residences
are proposed.
Precinct 2
Area F
Area F is located in the western section of Lot 11 and drains west towards Keyser Creek. This area is
relatively flat and low-lying. Some filling is required in this area to provide sufficient flood immunity. 40
residential lots are proposed.
Area G
Area G is located in the western section of Lot 11 and drains east towards Keyser Creek. This area is
relatively flat and low-lying, with higher and steeper areas along the boundary with Tidswell Road. Some
filling is required in this area to provide sufficient flood immunity. 124 residential lots are proposed.
Precinct 3
Area H
Area H is located on the eastern side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
north towards Eenie Creek and east towards Keyser Creek. The western section of this area is relatively flat
with grades of around 1 percent, and the eastern section is sloped at around 3 percent. 24 townhouses and
52 residential lots are proposed.
Area I
Area I is located on the western side of Walter Hay Drive, within Lot 53 of the J & K Hofmann site. It drains
west towards a tributary of Eenie Creek. The northern section of Area I drains directly towards Eenie Creek.
The slopes within this area are around 5 percent, except for the northern section where they are around 1
percent. A total of 203 residential lots are proposed.


Northbrook Corporation Pty Ltd                    Version 4                                   16 September 2013
SMP_v4.docx                                 Commercial in Confidence                                    Page 4

Page 9

Noosa on Weyba
Stormwater Management Plan



Precinct 4
Area J
Area J is located on the western side of Lot 53 and drains east into the tributary of Eenie Creek. One rural
residential lot is proposed.
Area K
Area K is located on the western side of Lot 53, bounded by Hollett Road West to the south. It drains east
towards the tributary of Eenie Creek, upstream of the existing dam. The slopes in this area are around 2
percent. 6 premium residential lots are proposed.
Area L
Area L is located within Lot 2 of SP179590, in the J & K Hofmann site. It drains north towards another
tributary of Eenie Creek. The southern section of the site is quite flat, which steeper areas of around 5
percent in the northern part of the lot. Retirement living and aged care facilities consisting of 100 residences
are proposed.
The proposed precincts are all located within areas that have been previously cleared for grazing purposes.
The majority of the site will be retained in its natural state and/or revegetated.
Along Lake Weyba a 50 metre buffer area will be provided to the lot boundary, consisting of 40 metres of
open space and 10 metres of stormwater treatment area. This buffer area has mainly been cleared for cattle
grazing purposes. Revegetation of this area is proposed which will provide screening and improve its
ecological value. The buildings within the lots will be set back a further 10 metres, providing a total set back
of 60 metres to the lake. In Precinct 2 a 120 metre wide waterway corridor will be provided, which
encompasses Keyser Creek. The existing vegetation and dam in this area will be maintained and
rehabilitated. No compensatory excavation is proposed in this area so as to minimise potential
environmental impacts associated with vegetation clearance and the exposure of disturbed soils within a
waterway corridor. Flood modelling has shown that dense revegetation of this area would also be
achievable with acceptable flooding impacts for the site and surrounding properties, should this be desirable.
The existing dam and vegetated tributary located within Lot 53 will be maintained and rehabilitated.
The proposed development has reticulated water and sewerage, and will pump effluent to the Noosa
Sewerage Treatment Plant (refer Water Supply and Sewerage Analysis, Cardno, September 2013).
Previous development applications for this site have utilised on-site treatment and disposal of effluent via
irrigation. This development plan therefore reduces the risk of contaminants from effluent being discharged
into Lake Weyba.




Northbrook Corporation Pty Ltd                     Version 4                                   16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                    Page 5

Page 10

Noosa on Weyba
Stormwater Management Plan




4              Integrated Water Cycle Management Plan

An Integrated Water Cycle Management Plan (IWCMP) has been prepared by Gilbert and Sutherland as part
of the Noosa on Weyba development (refer IWCMP, Gilbert and Sutherland, August 2012).
The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends Option 4 as the preferred servicing strategy. In summary:
“Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence. It is typical of IWCWMP systems in high rainfall areas which achieve a reasonable reduction
in potable water demands.
     Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns
      and laundry);
     Wastewater management: sewerage from development precincts to the Noosaville STP;
     Domestic garden irrigation supplied from the domestic rain tanks;
     Roof tank overflow and stormwater flows through bio-retention swales and basins, prior to creek
      discharge.”
The recommendations of the IWCMP will be adopted as part of the WSUD strategy for the site. Rainwater
harvesting will be maximised through the connection of all available roof area to the tank and the utilisation
of rainwater tank sizes around twice the size prescribed by the Queensland Development Code (QDC).
Collected rainwater will be used for irrigation, toilet flushing and laundry purposes. This will significantly
reduce the potable water demand of the site. The MUSIC modelling has conservatively assumed that the
tanks would only be used for domestic irrigation purposes for standard residential precincts and open space
irrigation of the other communal precincts. Due to the large size of the rainwater tanks being proposed they
could also be used to irrigate the remaining open space areas on site, which would further reduce the
potable water demand and reduce the volume of stormwater being discharged from the site.
The installation of water efficient devices and appliances has also been assumed.
Stormwater flows will be treated to the required WQOs prior to being released into the gullies and waterway
corridors located within the site. These areas will be rehabilitated and will provide some additional polishing
of stormwater prior to release into Lake Weyba.




Northbrook Corporation Pty Ltd                     Version 4                                  16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                   Page 6

Page 11

Noosa on Weyba
Stormwater Management Plan




5              Water Quality Objectives

5.1            Stormwater Quality Objectives
The WQOs for stormwater treatment for the site cover three main components: pollutant load removal
targets; frequent flow management; and waterway stability. These WQOs have been derived from Maroochy
Shire Council Planning Scheme Policy No. 6 as well as the Urban Stormwater Quality Planning Guidelines
(DEHP, 2010). Design objectives are specified for both the construction and operational phases of
development.
CONSTRUCTION PHASE
During the construction phase of development, the water quality objectives (WQOs) for the site include:
     Coarse sediment—coarse sediment is retained on site.
     Fine sediment (TSS) —site discharge during sediment basin dewatering has a TSS concentration less
      than 50 mg/L. Achieve site discharge water quality through, for example, appropriate sediment basin
      design and operation with flocculation as required. It is noted that on the Sunshine Coast basins are
      typically designed for 125mm rainfall depth over a five day period.
     Turbidity—Site discharge during sediment basin dewatering has turbidity (NTU) less than 10% above
      receiving waters turbidity. A site-specific relationship should be developed between turbidity and
      suspended solids, prior to the commencement of construction.
     Nutrients (N & P)—Nitrogen and phosphorous are managed through sediment control.
     pH—Site discharge during sediment basin dewatering has a pH range 6.5–8.5
     Litter and other waste—Prevent litter/waste entering the site, the stormwater system or watercourses
      that discharge from the site. Also minimise or sufficiently contain on-site litter and waste production and
      regularly clear waste bins.
     Hydrocarbons and other contaminants— no visible sheen, no detectable odour. Hydrocarbons and
      other contaminants are prevented from entering the stormwater system or internal watercourses that
      discharge from the site.
     Wash down water—Wash down water is prevented from entering the stormwater system or internal
      watercourses that discharge from the site.
     Cations and anions—Cations and anions including aluminium, iron and sulfate are managed as
      required under an approved acid sulphate soil management plan.
The focus during the construction phase will be erosion and sediment control. Appropriate measures, such
as silt fences and berms will be adopted on a lot by lot basis. The proposed bio-retention and detention
basins can also be utilised as temporary sedimentation basins. The filter media will either be protected or
not installed until the majority of construction within the catchment area has been completed. Dedicated
temporary sedimentation basins will be required in some areas. An erosion and sediment control plan will be
required for each stage of the construction.
OPERATIONAL PHASE
Pollutant Load Reduction
During the operational phase the following pollutant load removal targets are specified for the development:
     Gross Pollutants: 90 percent reduction compared to untreated runoff;
     Total Suspended Solids (TSS): 80 percent reduction compared to untreated runoff;
     Total Phosphorous (TP): 60 percent reduction compared to untreated runoff; and
     Total Nitrogen (TN): 45 percent reduction compared to untreated runoff.

Northbrook Corporation Pty Ltd                      Version 4                                   16 September 2013
SMP_v4.docx                                   Commercial in Confidence                                    Page 7

Page 12

Noosa on Weyba
Stormwater Management Plan



The WSUD features proposed for the site will be modelled with MUSIC to ensure these WQOs are met.
In addition the pollutant load from the site will be compared to the existing case, using MUSIC, to ensure that
the pollutant load from the site is not being increased.
Frequent Flow Management
The impervious percentage of the developed areas is greater than 40 percent. Therefore it is required to
capture and manage the first 15mm/day of runoff from all impervious surfaces. The storage volume should
be able to drain within 24 hours.
Waterway Stability
Limit the post-development peak 1 year ARI event discharge within the receiving waterway to the pre-
development peak 1 year ARI event discharge.

5.2            Noosa River Environmental Values and Water Quality Objectives
According to DEHP’s Noosa River Environmental Values and Water Quality Objectives (July, 2010) Lake
Weyba is located in area NME1 – Noosa Lakes (middle estuary) and the following environmental values
apply:
     Aquatic Ecosystems
     Seagrass
     Human Consumer
     Primary Recreation
     Secondary Recreation
     Visual Recreation
     Cultural and Spiritual Values
                                                                                                        th   th
The applicable water quality objectives for Lake Weyba are to maintain the existing water quality (20 , 50
      th
and 80 percentiles), which are:
     Turbidity: 2 – 5 – 8 NTU
     Suspended Solids (TSS): 20 – 20 – 20 mg/L
     Chlorophyll a: 0.8 – 1.5 – 2.5 µg/L
     Total Nitrogen (TN): 150 – 240 – 380 µg/L
     Oxidised N: 2 – 5 – 15 µg/L
     Ammonia N: 7 – 15 – 32 µg/L
     Organic N: 130 – 210 – 320 µg/L
     Total Phosphorous (TP): 10 – 13 – 16 µg/L
     Filterable Reactive Phosphorous (FRP): 2 – 2 – 2 µg/L
     Dissolved Oxygen: 85 – 95 – 105% saturation
     pH: 8.0 – 8.2 – 8.3
     Secchi depth: 1.1 – 1.6 – 2.0 m
Eenie Creek and Keyser Creek are classified as wallum/tannin stained streams and the applicable water
quality objectives are:
     Turbidity: <20 NTU
     Suspended Solids (TSS): <6 mg/L


Northbrook Corporation Pty Ltd                    Version 4                                   16 September 2013
SMP_v4.docx                                 Commercial in Confidence                                    Page 8

Page 13

Noosa on Weyba
Stormwater Management Plan



     Chlorophyll a: <5 µg/L
     Total Nitrogen (TN): <500 µg/L
     Oxidised N: <60 µg/L
     Ammonia N: <20 µg/L
     Organic N: <420 µg/L
     Total Phosphorous (TP): <50 µg/L
     Filterable Reactive Phosphorous (FRP): <20 µg/L
     Dissolved Oxygen: 85 –110% saturation
     pH: 5.0 – 7.0
     Secchi depth: n/a
     Conductivity: 500 µS/cm

5.3            Water Quality Monitoring
Healthy Waterways undertakes regular monitoring of water quality within Lake Weyba under their Ecosystem
Health Monitoring Program. The observed water quality from 2002, compared to the above objectives is
shown in Appendix B. The observed water quality for turbidity, chlorophyll a, TN, ammonia N, organic N and
secchi depth currently do not meet the DEHP objectives. It should be noted that the target secchi depths are
greater than the average depths of Lake Weyba.
MUSIC modelling will be used to determine the reduction in pollutant loads for the operational phase of
development. This is the approach recommended by DEHP to determine whether proposed treatment
devices will be sufficient. The resultant pollutant concentrations in the MUSIC modelling will be dependent
on the assumed default background concentrations within the treatment devices, which are in some
instances higher than the WQOs. For example the background TP concentration in bio-retention systems is
assumed to be 130 µg/L and the water quality objective is 50 µg/L. It is therefore not possible to show
through MUSIC modelling that concentration based WQOs can be met.
The SCRC RFI has suggested that site specific monitoring be carried out, as Healthy Waterways monitoring
may not be able to be relied upon for the life of the development. A site specific water quality monitoring
program has therefore been proposed for the construction and operational phases of the development, the
details of which are summarised below. The locations of the proposed monitoring sites are shown in
Appendix B. Baseline monitoring prior to the start of construction will be used to help define the existing
water quality objectives.
At the start of the water quality monitoring photos of each site should be taken, so that it easier to ensure the
same location is used for monitoring. The monitoring should occur with a calibrated hand held instrument,
with the remaining physico-chemical parameters sent to a laboratory for analysis. The testing should ideally
be conducted at the same time of day, as some parameters such as pH and dissolved oxygen vary through
the day. The water quality monitoring should allow sufficient time after a high flow event to allow conditions
to stabilise.
The adopted water quality monitoring sites are summarised below. They were chosen to determine the
incoming water quality and the potential impact of development.
     Site A: Located upstream location of development, and downstream of neighbouring golf course.
     Site B: Located in existing dam within Lot 53.
     Site C: Located in Eenie Creek 350m upstream of Walter Hay Drive, downstream of neighbouring Lake
      Entrance Boulevard residential area and downstream of part of the proposed development.
     Site D: Located in Eenie Creek 280m downstream of Walter Hay Drive, downstream of Noosa Civic
      development and part of the proposed development.


Northbrook Corporation Pty Ltd                     Version 4                                    16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                     Page 9

Page 14

Noosa on Weyba
Stormwater Management Plan



     Site E: Located in existing dam within Lot 11. Will be impacted by upstream runoff from neighbouring
      nursery.
     Site F: Located in Keyser Creek downstream of Lot 11.
     Site G: Located in Lake Weyba, downstream of proposed discharge point.
     Site H: Located in Lake Weyba, from existing pontoon, downstream of proposed discharge point.
     Site I: Located in Lake Weyba, adjacent to neighbouring residential area.
The parameters to be tested and proposed frequency are outlined in Table 5-1. Additional testing for anions
and cations has been proposed for areas downstream of filling, as it is likely that this will be required for the
acid sulphate soil management plan.
Faecal coliform testing within the lake has been proposed to look at the impact of neighbouring septic
systems on lake water quality. It will also be used during operation to determine whether the lake is suitable
for recreation purposes.




Northbrook Corporation Pty Ltd                     Version 4                                    16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                    Page 10

Page 15

Noosa on Weyba
Stormwater Management Plan



Table 5-1       Water Quality Monitoring Parameters
       Frequency                 Location                                                         Water Quality Parameter
                                                  Turbidity     TSS   Chlorop        TN           TP        DO         pH   EC   Temp   Cations      Faecal
                                                                       hyll a                                                              &          Coli-
                                                                                                                                        Anions       forms
                                                                                Prior to Construction
     Quarterly for               Sites A to I                                                                             
   minimum period of
       12 months
     Quarterly for             Sites G, H, I                                                                                                            
   minimum period of
       12 months
     Quarterly for               Site D & E                                                                                               
   minimum period of
       12 months
                                                                                Construction Stage^
         Monthly                 Site D & E                                                                                               
   Monthly and when             Sediment                                                                                     
     dewatering               Control Ponds
       Monthly                 Sites A to I                                                                                   
                                                                                Operational Phase
  Monthly for a period           Sites A to I                                                                                                  
    of 12 months,
  quarterly thereafter
  Monthly for a period           Site D & E                                                                                               
    of 12 months,
  quarterly thereafter
  Monthly for a period         Sites G, H, I                                                                                                            
    of 12 months,
  quarterly thereafter
^ Construction stage water quality objectives are applicable.


The water quality values for the existing case will be statistically analysed according to ANZECC requirements to determine the appropriate water quality
guidelines.




Northbrook Corporation Pty Ltd                                                    Version 4                                                   16 September 2013
SMP_v4.docx                                                                 Commercial in Confidence                                                   Page 11

Page 16

Noosa on Weyba
Stormwater Management Plan




5.4            Water Quality Testing Results
One round of background water quality testing has been completed. The results are summarised in the table
below for sites A to F. The water quality results for all sites, including Lake Weyba are shown in Appendix B.
Table 5-2          Water Quality Testing Results

                                 Water Quality                                   Site
 Parameter
                                  Objective            A           B      C              D       E          F
 pH                                  5-7               7           7      7              7.3     6          6.8
 Dissolved Oxygen (mg/L)                               5.4        5.6     6.8            6.9     5.5        5.4
 Dissolved Oxygen (% sat)           85 -110           57.7        61.1   73.9           78.2    58.0       56.0
 Turbidity (NTU)                     <20              10.2        7.4     8.4            1.6     3.1        7.8
 EC (mS/cm)                          <0.5             0.16        0.09   13.69          34.78   0.28       0.17
 Temperature ( ºC)                                    18.5        19.5   19.3           21.4    17.8        17
 TSS (mg/L)                           <6               15         18      14             13      12         11
 TN (mg/L)                           <0.5              0.6         1      0.6            1.1     0.5        0.5
 TP (mg/L)                          <0.05             0.02        0.03   0.03            0.1    <0.01     <0.01
                       3
 Chlorophyll a (mg/m )                <5               13         32      <1             <1      12         <1



The results shown that the pH levels are generally within the recommended ranges. The dissolved oxygen
levels are less than recommended, which suggests elevated biological oxygen demand (BOD). The turbidity
levels were all below the recommended limit. The electrical conductivity was elevated in the two sites in
Eenie Creek, due to the tidal influence in this area. The TSS and TN levels were higher than recommended
at all sites. The TP levels were generally below the recommended limit. The chlorophyll a levels were
elevated at the sites were stagnant water was present.
Further testing will be required to determine the background water quality conditions.




Northbrook Corporation Pty Ltd                      Version 4                                    16 September 2013
SMP_v4.docx                                   Commercial in Confidence                                    Page 12

Page 17

Noosa on Weyba
Stormwater Management Plan




6              Proposed WSUD Strategy

6.1            Summary
The proposed WSUD features are shown in Figures 3, 4 and 5. In summary the WSUD strategy for the site
included:
     Community Education. The most effective treatment measure is to reduce the source of pollutants.
      Therefore community education is proposed so that residents are informed about what they can do to
      reduce their impact on their surrounding environment. Information signs will be located at stormwater
      devices. An information leaflet will be distributed to each residence prior to the wet season each year.
      An example of the information leaflet is contained in Appendix C. As the development is a Community
      Title Scheme the body corporate will also be able to instigate appropriate measures to reduce pollutant
      loads from communal areas.
     Reducing Potable Water Demand. Water efficient devices and appliances will be installed in each
      residence. Drought tolerant gardens will also be recommended.
     Providing an Alternative Water Source. All practically available roof area will be connected to
      rainwater tanks that will be larger than QDC requirements, so as to maximise rainwater harvesting on
      site, minimise potable water demand and reduce the volume of stormwater discharged from site.
      Rainwater tanks will be used for toilet flushing, laundry and irrigation purposes.
     Bio-retention Basins. Bio-retention basins are located at the end of the stormwater line, upstream of
      the point of discharge from the site. Stormwater ponds in the basins before slowly percolating through
      the vegetated filtration media and being treated through bio-filtration processes. Filtered stormwater is
      collected by perforated pipes and the discharged from site. Coarse sediment forebays will be located at
      the inlet points to capture sediment and prevent blockage of the filter media.
     Bio-retention Gardens.      Bio-retention gardens are small bio-retention basins that double as
      landscaped areas within the road reserve. They will treat runoff through bio-filtration before it is
      discharged to the stormwater system. Bio-retention gardens are suitable is relatively flat areas.
     Bio-retention Tree Pits. Bio-retention tree pits are trees located within filter media within the road
      reserve. They can provide some pre-treatment of runoff from the road prior to it being discharged to the
      stormwater system. Additional treatment will be required downstream. Tree-pits can be located in
      moderately sloped areas.
     Bio-retention Swales. Bio-retention swales are like standard vegetated swales but with a filter media
      layer to provide additional treatment of stormwater. They are typically located along road-sides and can
      be used in flat to moderately sloped areas (around 2 percent).
     Vegetated Swales. Vegetated swales will be used where underdrainage or slope requirements make
      the use of bio-retention swales impractical.
     Litter Baskets. Bio-retention basins and gardens are generally sufficient to capture any gross
      pollutants or litter from urban areas. However, as an additional treatment measure litter baskets will be
      installed on the field inlets of bio-retention gardens, swales and basins, as well as any other stormwater
      outlet discharging to the receiving waterways.
     Revegetation of Lake Weyba Buffer Area. A 40 metre wide lake buffer will be located along Lake
      Weyba. This will provide additional treatment of stormwater that may overflow from the adjacent bio-
      retention swales located in the 10 metre stormwater treatment zone. The buffer area, which has mostly
      been cleared of vegetation for use as cattle grazing, will be revegetated, which will improve its
      performance as a buffer treatment area, and improve bank stabilisation.




Northbrook Corporation Pty Ltd                     Version 4                                   16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                   Page 13

Page 18

Noosa on Weyba
Stormwater Management Plan



     Rehabilitation of Keyser Creek Waterway Corridor. Rehabilitation will include the stabilisation of
      banks where required, weed removal and revegetation. A dam already exists in Keyser Creek,
      upstream of the crossing linking Areas F and G in Precinct 2. Rehabilitation of this area will improve its
      functionality as a public open space, and also improve its ecological value.
     Wastewater Management. The proposed development has reticulated water and sewerage. Previous
      development applications for this site have utilised on-site treatment and disposal of effluent via
      irrigation. This development plan therefore reduces the risk of contaminants from effluent being
      discharged into Lake Weyba.
The impact of community education, bio-retention tree pits, litter baskets, buffer area revegetation and
rehabilitation has not been included in the MUSIC modelling, unless stated otherwise. Therefore the MUSIC
results are a conservative assessment of the improvement in stormwater quality that can be achieved on
site.
The proposed treatment devices have been located outside of ecologically constrained areas and outside of
the 100 year ARI extent of inundation.

6.2            Treatment Device Details
6.2.1          Rainwater Tanks
All practically available roof area will be connected to the proposed rainwater tanks so that stormwater
harvesting on site is maximised.
10 kL tanks are proposed for each residential lot. 5 kL rainwater tanks are proposed for each townhouse or
retirement villa. These tanks will likely be combined into a smaller number of larger tanks for irrigation of
communal areas. A 120 kL tanks is proposed for the apartment buildings. These proposed rainwater tanks
sizes are around twice the standard rainwater tank sizes formerly required by QDC and the former Maroochy
Shire Council.
Due to the large size of the proposed rainwater tanks it is likely that they will be underground systems. An
example of this kind of set-up from a local manufacturer (Action Tanks) is shown in Appendix D.
Pre-treatment of roof water via a litter screen is recommended, as shown in Appendix D. This litter screen
has not been included in the MUSIC modelling.

6.2.2          Bio-retention Basins
End-of-line bio-retention basins will be utilised in areas where the slopes are too steep or there is insufficient
area for bio-retention gardens within the road reserve. Bio-retention tree-pits will also be utilised in these
areas, where practical, to provide some pre-treatment of runoff. However, these were not included in the
MUSIC modelling (refer Section 7).
The proposed bio-retention basins and gardens will provide some minimal attenuation of peak flows. Most of
the attenuation of major peak flows on site will be provided by the proposed road culvert crossings (refer
Flood Study, Cardno, October 2012). The bio-retention basins for catchments 3_I_4, 3_I_5 and 4_L will be
combined into the detention basins proposed for these sub-catchments. The design of these detention
basins will be conducted at detail design stage, however, indicative sizes are shown in Figure 3, 4 and 5.
The remaining bio-retention basins will only be utilised for stormwater quality purposes. Therefore the
basins will not be as deep.
For the detailed civil design of each basin the following elements should be included.
     The overflow pits and weirs should ideally be located near the inlet points, so that during major rainfall
      events the scouring of bio-retention vegetation is minimised.
     Access ramps should be provided for each basin so that maintenance vehicles can gain access to the
      base.
     Coarse sediment forebays or sedimentation ponds should be installed at inlet points.
     The perforated pipe underdrainage should be spaced at approximately 2 metre intervals.

Northbrook Corporation Pty Ltd                     Version 4                                     16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                     Page 14

Page 19

Noosa on Weyba
Stormwater Management Plan



     Clean out points should be provided for all underdrainage.
     Litter baskets should be installed on the overflow pits.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.3 metres. The filter depth assumed was either
0.6 or 0.8 metres. Transition and drainage layers will also be required underneath the filter media. In areas
outside of the Asset Protection Zone (APZ) the bio-retention basins can be planted with suitable trees such
as melaleucas. These require a filter depth of 0.8 metres. The advantage of planting trees in bio-retention
basins is that they improve the aesthetics and bio-diversity. They also reduce the likelihood of blockage of
the filter media. Recent studies have shown they do not increase the risk of blockage of the underdrainage.
A typical bio-retention basin cross-section is shown in Image 1.




Image 1            Typical Bio-retention Basin Cross-section

6.2.3          Bio-retention Gardens
Bio-retention gardens are similar to bio-retention basins, except that they are smaller in size and located
within the road reserve, and so can be incorporated into the landscaping. They treat runoff from surrounding
areas before it is discharged to the stormwater pipes.
They are effective treatment devices in relatively flat and low-lying areas as they do not need as much
vertical differentiation.
The bio-retention filter media was assumed to be sandy loam with a saturated hydraulic conductivity of 200
mm/hr. The extended detention depth was assumed to be 0.15 metres. The filter depth assumed was 0.8
metres, to allow for the planting of trees. Transition and drainage layers will also be required underneath
the filter media.
                                                                 2                               2
A typical bio-retention garden will have a filter area of 9 m and a surface area of around 20 m to allow for
batters, coarse sediment forebay and field inlet. They will each treat runoff from every two lots on average.
Larger gardens will be positioned in areas where there is sufficient space.
The location and design of the bio-retention gardens will be detailed during the design of the Precincts.
Road reserve widths of at least 15 metres will be necessary to accommodate them. They can be utilised as
traffic calming devices.
To improve the treatment efficiency of the bio-retention gardens the overflow from the rainwater tanks will be
connected directly to the underground drainage. This will ensure that relatively clean roofwater is not re-
contaminated, and it will improve the drainage efficiency of the road reserve and so reduce the risk of local
flooding. A sensitivity analysis looking at the impact of draining the rainwater tanks to the bio-retention
gardens will be conducted.
For the detailed civil design of each basin the following elements should be included.


Northbrook Corporation Pty Ltd                      Version 4                                16 September 2013
SMP_v4.docx                                   Commercial in Confidence                                Page 15

Page 20

Noosa on Weyba
Stormwater Management Plan



     Coarse sediment forebays on the inlet point.
     Batters should be densely vegetated to deter pedestrian/vehicle access. The batter slope should be at
      least 1 in 2.
     Inorganic mulch laid over the filter media surface improves moisture retention. The mulch used should
      not float during rainfall.
     The overflow pit invert will be 150 mm above the base to provide for extended detention. The total
      depth of the bio-retention garden will be around 250 mm to prevent ponding within the road.
     Litter baskets should be installed on the overflow pits.
     Clean out points should be provided for all underdrainage.
     A flat pedestrian refuge area of around 300mm width should be provided along the boundary with the
      road.
A typical bio-retention garden cross-section is shown below in Image 2 and an example is shown in Image 3.




Image 2        Typical Bio-retention Garden (Water Sensitive Urban Design: Streetscape Planning and
               Design Package, Brisbane City Council, 2011)




Image 3        Bio-retention Garden

6.2.4          Bio-retention Swales
Bio-retention swales are similar to bio-retention basins, except that they are long and narrow systems with
no extended detention depth. They have a shallow longitudinal grade of 2 percent or less. Field inlets are
located along the length of the swale to drain excess flows. Litter baskets should be installed on all field
inlets.


Northbrook Corporation Pty Ltd                      Version 4                               16 September 2013
SMP_v4.docx                                   Commercial in Confidence                               Page 16

Page 21

Noosa on Weyba
Stormwater Management Plan



Batter slopes of 1 in 6 have been assumed for bio-retention swales adjacent to roads. For other bio-
retention swales batter slopes of 1 in 4 have been used.
Bio-retention swales are proposed adjacent to the lake buffer zone in Area B. To better simulate natural flow
patterns several underdrainage outlets will be located along the length of the swale, which will discharge
treated stormwater directly to the lake. Several rock check dams will be located along the length of the swale
where some of the overflow will be discharged across the adjoining lake buffer. Appropriate scour protection
will be required in these areas. The stormwater treatment zone has a width of 10 metres. Based on natural
surface levels the width of the swale required would be around 7 to 8 metres. Further details are provided in
Section 8.

6.2.5          Litter Baskets
As the proposed development is a community title scheme the maintenance of stormwater quality devices
will be the responsibility of the body corporate. In standard residential developments litter baskets would not
be used due to their ongoing maintenance requirements. For further details of the maintenance
requirements refer to Appendix F.
Litter baskets have been proposed on all inlets discharging to downstream waterways so that any excess
litter and gross pollutants not captured by the other proposed WSUD measures is retained on site and not
discharged downstream. Litter baskets will therefore be required in bio-retention gardens, bio-retention
gardens, bio-retention swales and vegetated swales.
They have an advantage over in-ground gross pollutant traps (GPTs) in that litter is stored in a dry state,
which reduces the risk of dissolved pollutants being discharged downstream. The maintenance of litter
baskets is also more straightforward. They are designed not to impact on the hydraulic efficiency of the gully
or field inlets in which they are installed.
The Ecosol RSF 100 is a typical example of a litter basket that could be used on site.




Northbrook Corporation Pty Ltd                    Version 4                                   16 September 2013
SMP_v4.docx                                 Commercial in Confidence                                   Page 17

Page 22

Noosa on Weyba
Stormwater Management Plan




7              MUSIC Modelling

7.1            Summary
MUSIC Version 5.1.16 was used in the analysis. The MUSIC Modelling Guidelines for South East
Queensland (Healthy Waterways, 2010) were used as the main reference to set up the models.
The rainfall data was taken from Cooroy Composite (40059) for the 10 year period from the 1/1/1973 to
31/12/1982. A 6 minute time step was adopted.
The MUSIC model layouts for each precinct are shown in Appendix E.

7.2            Catchment Areas
The sub-catchment areas are shown in Figure 2.
The rainfall runoff parameters and pollutant export parameters were taken from Tables 3.7 and 3.8 of the
MUSIC Modelling Guidelines.
For the existing case a rural-residential node was used, with a 0 percent impervious value. For the
developed case an urban-residential nodes were used, except for a small area of commercial development
in Area C. The residential areas were assumed to be 60 percent impervious, townhouses, apartments and
retirement living areas were assumed to be 70 percent impervious.
The breakdown of road, roof and ground area was based on the concept masterplan layout. For precincts
where the layout has not been specified typical surface type splits from Table 3.3 of the manual were used.
                                                                          2
The roof area of premium residential lots was assumed to be 250 m , and the roof area for standard
                                         2
residential lots was assumed to be 215 m in accordance with Table 3.3. All of the available roof area will be
connected to rainwater tanks so as to maximise stormwater harvesting on site.
The new access roads have been included in the MUSIC modelling. The upgrade of existing Council roads
will be undertaken on behalf of Council or by Council, at a cost to the development. These roads will be
provided with best practice stormwater quality treatment. These road upgrades have not been included in
the MUSIC modelling.
The breakdown of each sub-catchment is shown in Table 7-1.
Table 7-1      MUSIC Sub-catchments

  Catchment       Total Area             Roof                              Road                     Ground
    Name             (ha)        Area       Percent Im-          Area         Percent Im-   Area        Percent Im-
                                 (ha)        pervious            (ha)          pervious     (ha)         pervious
                                                (%)                               (%)                       (%)
      1_B_1          1.200       0.425            100           0.161             60        0.614            32
      1_B_2          1.948       0.525            100           0.566             60        0.857            36
      1_B_3          0.555       0.225            100                                       0.330            33
      1_B_4          1.280       0.325            100           0.490             60        0.465            32
      1_B_5          0.895       0.325            100           0.112             60        0.458            32
      1_B_6          0.139                        100           0.139             60
      1_C_1          1.264       0.442            100           0.379             70        0.442            30
      1_D_1          3.911       1.369            100           1.173             70        1.369            30
      1_D_2          0.833                                      0.833             60
      1_D_3          0.278                                      0.278             60
      1_E_1          3.174       1.111            100           0.952             70        1.111            30



Northbrook Corporation Pty Ltd                        Version 4                                      16 September 2013
SMP_v4.docx                                     Commercial in Confidence                                      Page 18

Page 23

Noosa on Weyba
Stormwater Management Plan



    Catchment     Total Area              Roof                              Road                     Ground
      Name           (ha)         Area       Percent Im-          Area         Percent Im-   Area        Percent Im-
                                  (ha)        pervious            (ha)          pervious     (ha)         pervious
                                                 (%)                               (%)                       (%)
      2_F_1          3.240        0.860            100           1.005             60        1.375            35
      2_G_1          8.273        2.666            100           1.995             60        3.612            30
      2_G_2          0.716                                       0.716             60
      3_H_1          0.607        0.212            100           0.182             60        0.212            30
      3_H_2          1.049        0.298            100           0.364             60        0.387            35
      3_H_3          1.963        0.618            100           0.476             60        0.869            36
      3_H_4          1.981        0.323            100           0.620             60        1.038            48
      3_H_5          1.190                                       1.190             60
      3_I_1          4.018        1.118            100           0.906             60        1.994            38
      3_I_2          2.891        0.723            100           0.596             60        1.572            42
      3_I_3          3.427        1.011            100           0.634             60        1.782            37
      3_I_4          5.242        1.226            100           1.707             60        2.309            39
      3_I_5          1.147        0.258            100           0.294             60        0.595            43
        4_K          0.665        0.150            100           0.154             60        0.361            43
        4_L          4.473        1.566            100           1.342             60        1.566            30


Area J is a large rural residential lot. The layout for this area has not yet been defined, but the developed
area is likely to only take up a small part of the area. The most suitable treatment measures will be
determined when this area has been more clearly defined. It is likely that the most appropriate treatment
measures would be rainwater tanks and vegetated swales.
Area A has not been included in the modelling as it is the renovation of an existing building. However, it is
recommended that larger rainwater tanks be installed in this area to reduce the potable water demand.

7.3             Treatment Devices

7.3.1           Rainwater Tanks
The rainwater tanks were set up using the Healthy Waterways MUSIC Modelling Guidelines. It was
assumed that a 10 kL tank would be provided for each residential lot and a 5 kL tank would be provided for
each townhouse or retirement villa. For the proposed apartment buildings a 120 kL tank was used. A
sensitivity analysis will be conducted to determine the impact of only providing half of this tank size.
The rainwater tank usage rates assumed that full water saving devices would be adopted (i.e. 21 L/p/day for
toilet flushing and 26 L/p/day for laundry). The following occupancy rates were assumed:
     2.8 people per residential lot;
     2.0 people per townhouse or retirement villa; and
     1.7 people per apartment.
For outdoor uses it was assumed that 70 percent of the ground area would be irrigated at 548 mm/year,
which is the rate recommended for private gardens (refer MUSIC Guidelines). The ground area was
                     2                                     2
assumed to be 300 m for premium residential lots and 235 m for standard residential lots. For the other
types of development the ground area was taken from the MUSIC model sub-catchment area. The outdoor
use was scaled by PET and rainfall. Therefore on days where there is sufficient rainfall no irrigation would
be applied.
The details of each rainwater tank are shown in Table 7-2.

Northbrook Corporation Pty Ltd                         Version 4                                      16 September 2013
SMP_v4.docx                                      Commercial in Confidence                                      Page 19

Page 24

Noosa on Weyba
Stormwater Management Plan



Table 7-2           Rainwater Tank Details

  Catchment Name                               Rainwater Tank
                                 Total Size       Irrigation              Indoor Use
                                    (kL)          (kL/year)                 (kL/day)

         1_B_1                      170            1956.7                   2.237
         1_B_2                      210            2417.1                   2.764
         1_B_3                      90             1035.9                   1.184
         1_B_4                      130            1496.3                   1.711
         1_B_5                      130            1496.3                   1.711
         1_C_1                      120            1697.3                   4.000
         1_D_1                      415            5251.1                   7.802
         1_E_1                      600            4261.5                   11.280
         2_F_1                      400            3604.0                   5.264
         2_G_1                     1240            11172.4                  16.318
         3_H_1                      60              814.8                   1.128
         3_H_2                      140            1611.2                   1.955
         3_H_3                      290            3337.5                   4.042
         3_H_4                      150            1351.5                   1.974
         3_I_1                      520            4685.2                   6.843
         3_I_2                      350            3153.5                   4.606
         3_I_3                      470            4234.7                   6.185
         3_I_4                      570            5135.7                   7.501
         3_I_5                      120            1081.2                   1.579
          4_K                       60              690.6                   0.790
              4_L                   500            6005.4                   9.400



7.3.2               Bio-retention Basins and Bio-retention Gardens
The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
area and surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.
A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media was assumed to be 800 mg/kg. The orthophosphate content was
assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
removal plants.
A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
determine the potential impact of filter blockage.
No exfiltration was assumed. The overflow width was assumed to be one tenth of the surface area as
recommended by the guidelines.
The extended detention depth of the bio-retention basins was assumed to be 0.3 metres. The extended
detention depth for bio-retention gardens was assumed to be 0.15 metres.
The bio-retention gardens in each sub-area were combined into the one treatment node.

Northbrook Corporation Pty Ltd                       Version 4                              16 September 2013
SMP_v4.docx                                    Commercial in Confidence                              Page 20

Page 25

Noosa on Weyba
Stormwater Management Plan



The details of each bio-retention basin and bio-retention garden are shown below in Table 7-3.
Table 7-3      Bio-retention Basin and Bio-retention Garden Details

  Catchment        Filter Area       Surface Area           Filter Depth     Extended     Indicative    Overflow
    Name                  2
                       (m )
                                           2
                                         (m )                    (m)         Detention   Total Depth    Weir Width
                                                                              Depth          (m)           (m)
                                 Modelled     Indicative                        (m)
                                  Area           Area
                                               Required
                                                Bio-retention Gardens
     1_B_4             120         120           270            0.80           0.15         0.25           12.0
     1_C_1             120         120           270            0.80           0.15         0.25           12.0
     2_F_1             243         243           540            0.80           0.15         0.25           24.3
     2_G_1             558         558          1240            0.80           0.15         0.25           55.8
                                                 Bio-retention Basins
     1_B_1             110         110           350            0.60           0.30         1.00           11.0
     1_B_5             75          75            280            0.60           0.30         1.00            7.5
     1_D_1             370         370           720            0.80           0.30         1.00           37.0
     1_E_1             270         270           630            0.80           0.30         1.00           27.0
     3_H_3             180         180           460            0.60           0.30         1.00           18.0
     3_H_4             180         180           460            0.60           0.30         1.00           18.0
      3_I_1            350         350           690            0.60           0.30         1.00           35.0
      3_I_2            260         260           620            0.60           0.30         1.00           26.0
      3_I_3            300         300           680            0.60           0.30         1.00           30.0
                                            Bio-retention/Detention Basins
      3_I_4            450         450          1640            0.60           0.30         1.50           45.0
      3_I_5            100         100           530            0.60           0.30         1.50           10.0
        4_L            400         400          1550            0.60           0.30         1.50           40.0



7.3.3          Bio-retention Swales
The bio-retention swales were set up using the Healthy Waterways MUSIC Modelling Guidelines. They were
set up as two treatment nodes in series; a bio-retention node with no extended detention depth and a
vegetated swale with a low flow bypass equal to the filter media treatment rate. The vegetated swale was
assumed to be half the actual length as recommended by the guidelines.
The same filter media details as for the bio-retention basins were used. The filter depth was typically
assumed to be 0.6 metres, but this can be made deeper if preferred to allow for the planting of trees.
The details of the MUSIC treatment nodes are shown in Table 7-4 and 7-5.




Northbrook Corporation Pty Ltd                      Version 4                                      16 September 2013
SMP_v4.docx                                   Commercial in Confidence                                      Page 21

Page 26

Noosa on Weyba
Stormwater Management Plan



Table 7-4       Bio-retention Node Details
                                        2
    Catchment          Filter Area (m )         Surface Area     Filter Depth (m)      Extended          Overflow Weir
      Name                                            2
                                                    (m )                            Detention Depth        Width (m)
                                                                                          (m)
        1_B_2                    300                300                 0.6                 0                 30.0
        1_B_3                    140                140                 0.6                 0                 14.0
        1_D_2                    195                195                 0.6                 0                 19.5
        2_G_2                    125                125                 0.6                 0                 12.5
        3_H_1                    80                 80                  0.6                 0                 8.0
        3_H_2                    105                105                 0.6                 0                 10.5
         4_K                     90                 90                  0.6                 0                 9.0


Table 7-5       Swale Node Details

  Catchment                  Length                 Low Flow      Base Width    Top Width       Depth (m)       Slope
    Name                       (m)                   Bypass          (m)           (m)                           (%)
                                                        3
                                                      (m /s)
                   Modelled            Actual
                    Length             Length
     1_B_2             50               100           0.017           3.0           5.4            0.3               1.5
     1_B_3             70               140           0.008           1.0           3.4            0.3               1.4
     1_D_2             195              390           0.011           0.5           4.1            0.3               2.0
     2_G_2             125              250           0.007           0.5           4.1            0.3               0.5
     3_H_1             80               160           0.004           0.5           4.1            0.3               0.5
     3_H_2             105              210           0.006           0.5           4.1            0.3               2.0
        4_K            45               90            0.005           1.0           4.6            0.3               0.5


The actual widths of the bio-retention swales may be wider than shown in Table 7-5 to allow for appropriate
battering.

7.3.4           Vegetated Swales
The details of the proposed vegetated swales are shown in Table 7-6. Vegetated swales were proposed in
areas considered to be too steep for bio-retention swales or where there was insufficient vertical
differentiation for underdrainage to be installed. The batter slopes were assumed to be 1 in 6 as they are
adjacent to roadways.
Table 7-6       Vegetated Swale Details

  Catchment                  Length                 Low Flow      Base Width    Top Width       Depth (m)       Slope
    Name                       (m)                   Bypass          (m)           (m)                           (%)
                                                        3
                                                      (m /s)
                   Modelled            Actual
                    Length             Length
     1_B_6             65               130              0.0          0.0           3.6            0.3               3.0

     3_H_5             260              520              0.0          0.0           3.6            0.3               0.5




Northbrook Corporation Pty Ltd                            Version 4                                      16 September 2013
SMP_v4.docx                                         Commercial in Confidence                                      Page 22

Page 27

Noosa on Weyba
Stormwater Management Plan



7.3.5          Litter Baskets
Litter Baskets will be installed on all inlets discharging to downstream waterways. They have not been
included in the MUSIC model, except for sub-catchment 1_D_3, which is the proposed culvert crossing of
Keyser Creek, where it is the sole treatment device. Other WSUD measures are not practical in this location,
which is the low-point of the road.
The litter basket was assumed to remove 100 percent of gross pollutants and 50 percent of total suspended
solids. No removal of nutrients was assumed.




Northbrook Corporation Pty Ltd                   Version 4                                  16 September 2013
SMP_v4.docx                                Commercial in Confidence                                  Page 23

Page 28

   Noosa on Weyba
   Stormwater Management Plan




   8                 MUSIC Model Results

   8.1               Load Reduction
   The resultant load reduction with the proposed treatment train in place is shown in Table 8-1. The results
   show that the load reduction targets are met for all precincts. For the site as a whole the WQOs are easily
   met.
   Table 8-1         Pollutant Load Reductions

  Pollutant                                                       Percentage Load Removal
                                                                            (%)
                      WQO                                                     Area                                                    Combin
                                                                                                                                        ed
                                 B           C       D           E        F            G         H        I         K           L
    Total             80.0      84.7        82.4    82.4       80.7      80.2        81.3       84.9    80.8       90.2       81.5      82.2
Suspended
Solids (TSS)
   Total              60.0      64.5        63.0    62.1       63.7      61.1        61.8       67.1    62.4       67.9       63.0      63.2
Phosphorous
   (TP)
Total Nitrogen        45.0      53.0        46.3    52.8       57.5      45.8        45.1       48.2    55.7       45.5       56.5      51.9
     (TN)
   Gross              90.0     100.0        100.0   100.0      100.0    100.0     100.0         100.0   100.0     100.0       100.0     100.0
  Pollutants
    (GP)


   The developed case pollutant loads were also compared to the existing case. The results are shown in
   Table 8-2. The results show that the developed case pollutant loads are less than or equal to the existing
   case pollutant loads for all pollutants modelled. Therefore the proposed development provides an
   improvement in stormwater quality being discharged from site, based on the pollutants modelled.
   Table 8-2         Comparison to Existing Case

                        Pollutant                        Existing Case          Developed Case           Developed Case
                                                                                 No Treatment            With Treatment
         Total Suspended Solids (kg/yr)                     117000.0                 114640.0                   20435.0
               Total Phosphorus (kg/yr)                       106.0                     228.3                    83.9
                  Total Nitrogen (kg/yr)                      814.0                    1258.5                    605.6
                 Gross Pollutants (kg/yr)                      0.0                     14264.0                    0.0


   It should be noted that only the developed areas of the site were modelled in MUSIC. The remaining areas
   will be designated as parks, buffer areas and conservation zones and rehabilitated and/or revegetated as
   appropriate. As some of these areas are currently used for cattle grazing it is expected that the resultant
   stormwater quality from these areas will also improve.

   8.2               Sensitivity Analysis
   Several sensitivity analyses were run to determine the potential impact of filter media blockage; the impact of
   having only half the tank volume and the impact of connecting roof area to the bio-retention gardens, rather
   than directly to underground drainage. The results are shown Table 8-3.




   Northbrook Corporation Pty Ltd                                 Version 4                                               16 September 2013
   SMP_v4.docx                                              Commercial in Confidence                                               Page 24

Page 29

Noosa on Weyba
Stormwater Management Plan



If the filter media hydraulic conductivity reduces from 200 mm/hr to 50 mm/hr the WQOs are not met.
However, it should be noted that a significant reduction in pollutant loads, close to the WQO targets, is still
achieved and the resultant pollutant load would still be less than the existing case. Proper maintenance of
the filter media will be required to ensure that the hydraulic conductivity does not significantly reduce over
time.
If only half of the tank size is implemented then the WQOs are still met for all pollutants, for the site as a
whole. Therefore if necessary, the QDC minimum size tanks could be adopted on site. It should be noted
that for Areas C, F, G and K the TN WQO is not met. It is therefore recommended that these precincts adopt
the larger tank sizes or increase the bio-retention treatment areas. The proposed tank sizes supply around
82 percent of the non-potable water demand. If the tank sizes are halved this reduces to around 66 percent.
The larger tank sizes therefore supply an additional 23 ML/yr of non-potable water. Non-potable water
demand is generally estimated to be around 65 percent of the total water demand. Therefore around 53
percent of the total water demand of the site can be supplied by rainwater tanks. It is therefore
recommended that the proposed larger tank sizes be maintained so that the water demand of the site is
minimised. It should be noted that irrigation of park areas outside of the precinct areas has not been
assumed in the MUSIC modelling. The larger tank sizes will potentially also allow for irrigation of these
areas, therefore further reducing the water demand of the site.
The proposed bio-retention gardens will have the rainwater tank overflow directly connected to underground
drainage. This was found to improve the hydraulic efficiency of the bio-retention gardens as it allows them to
better treat the runoff from the road and ground nodes. A sensitivity analysis was conducted to determine
the impact of having rainwater tank overflow draining to the kerb. The results show that for the site as a
whole that the WQOs are still met. For the effected precincts there was a reduction in the removal of TSS
and TP below the WQO and an improvement in the TN removal. It is therefore recommended that these
areas maintain the direct connection to underground drainage. However, if this is not possible in some
areas, the WQOs for the site as a whole are still met if tank overflow is directed to the kerb.
Table 8-3         Sensitivity Analysis Results

                  Pollutant                                          Percentage Load Removal
                                                                               (%)
                                           WQO            Developed         With Filter   Half Tank       Roof to Bio
                                                            Case            Blockage        Size           Gardens
      Total Suspended Solids (TSS)          80.0              82.2             77.5            81.7           80.8
        Total Phosphorous (TP)              60.0              63.2             59.2            62.1           62.6
              Total Nitrogen (TN)           45.0              51.9             42.5            49.9           53.3
          Gross Pollutants (GP)             90.0             100.0            100.0        100.0             100.0


The impact of community education, bio-retention tree pits, litter baskets, buffer areas and rehabilitation of
the waterway corridors has not been included in the MUSIC modelling, unless stated otherwise. Therefore
the MUSIC results are a conservative assessment of the improvement in stormwater quality that can be
achieved on site.

8.3               Without Rainwater Tanks
As part of the response to the SCRC RFI the impact of not having rainwater tanks as part of the treatment
train was assessed. The State Government has amended the QDC, and there is now no requirement to
have rainwater tanks.
The MUSIC analysis was therefore re-run to determine the increase in bio-retention treatment size that
would be required to compensate for the loss of the rainwater tanks. As the proposed development has
targeted a higher level of treatment than typically required the increase required was not as significant as
that necessary for similar developments. It was found that if the bio-retention filter media area in the basins
and swales was increased by 25 percent, then the WQOs could be met. The exception was for areas F and
G, where a 50 percent increase in the bio-retention gardens was required. It would also be necessary to


Northbrook Corporation Pty Ltd                         Version 4                                      16 September 2013
SMP_v4.docx                                      Commercial in Confidence                                      Page 25

Page 30

Noosa on Weyba
Stormwater Management Plan



drain the roof areas to the road, rather than directly to underground drainage. The resultant load removal for
the combined site was 83% for TSS, 60% for TP and 48% for TN.
While the water quality objectives can be met if the bio-retention areas are increased it is still recommended
that rainwater tanks be adopted on site. The proposed development aims to promote the use of ecologically
sensitive design and the use of rainwater tanks plays an important role in this regard. As this will be a Body
Corporate development there will be more control available on the development conditions for each lot. The
use of rainwater tanks will significantly reduce the water demand of the site and allow the remaining
treatment devices to be better utilised treating ground and road runoff, rather than relatively clean roof runoff.

8.4            Frequent Flow Objective
The developed area of the site is 56.36 hectares, and is on average 62.5 percent impervious. The first 15
mm of runoff from impervious surfaces is therefore 5.28 ML/day. Based on the 10 years of rainfall data used
in the MUSIC modelling, the average annual runoff from the first 15mm of runoff from impervious surfaces is
equivalent to 317.2 ML/year. The total average annual runoff was 607.8 ML/year.
The MUSIC model was used to determine how much of the runoff was being treated by the bio-retention
basins and swales. The rainwater tanks were removed from the modelling, so that there were no other
outflows. The amount of runoff being treated by the bio-retention basins and swales alone was 364.7
ML/year. This is greater than the amount of runoff generated from the first 15mm of rainfall from impervious
surfaces, and therefore the frequent flow objectives are met.
The proposed rainwater tanks have a total volume of 6.375 ML. The daily usage is on average 0.282
ML/day, or 103.1 ML/year. The proposed tanks supply around 84.5 ML/year of this non-potable demand.
Therefore the total flow being treated or removed will be greater than that modelled without the rainwater
tanks in place.

8.5            Waterway Stability
The waterway stability objective is met as the peak flows from the site have been reduced to existing case
levels for all ARI events up to and including the 100 year ARI event (refer Flood Study, Cardno, September
2013). This is due to the attenuation being provided by the proposed road crossings and detention basins.
The attenuation provided by the rainwater tanks and bio-retention basins was not included in this analysis.
Therefore the attenuation, particularly for minor events, will likely be greater than reported.
Bio-retention basins and rainwater tanks provide some attenuation of minor peak flows, typically up to the 2
year ARI event. The stormwater outlets throughout the site should have adequate scour protection installed
to prevent downstream erosion.




Northbrook Corporation Pty Ltd                     Version 4                                     16 September 2013
SMP_v4.docx                                  Commercial in Confidence                                     Page 26

Page 31

Noosa on Weyba
Stormwater Management Plan




9              Conclusion

Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. For this reason the best available stormwater treatment measures have been proposed.
The proposed WSUD strategy for the site includes:
     Community education.
     Reducing potable water demand through use of water efficient devices and appliances.
     Large rainwater tanks (around twice the former QDC size requirements) connected to all practically
      available roof area to maximise rainwater harvesting, reduce stormwater flows and reduce potable
      water demand.
     Bio-retention basins.
     Bio-retention gardens within the road reserve.
     Bio-retention tree pits within the road reserve.
     Bio-retention swales.
     Vegetated swales.
     Litter baskets.
     Buffer areas.
     Revegetation and rehabilitation of Lake Weyba buffer area.
     Rehabilitation of Keyser Creek waterway corridor.
     Reticulated water and sewerage, which will minimise the risk of contaminants from effluent being
      discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed rainwater
tanks will be able to provide around 82 percent of the non-potable water demand and around 53 percent of
the total water demand of the site.
MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met. The reduction in pollutant loads being achieved by the proposed stormwater treatment train is
significantly greater than the reduction typically provided by standard residential developments.
The resultant pollutant loads from developed areas of the site are less than those resulting from the existing
rural use of these areas, based on the pollutants modelled. Other areas of the site will be converted from
rural uses to park areas and densely vegetated areas will become designated conservation areas, and
rehabilitated as required. Therefore the overall stormwater quality being discharged from the site will likely
be improved, and there will not be an impact on the water quality of Lake Weyba.
Regular water quality monitoring will be used to ensure that stormwater being discharged from site is of
suitable quality. Baseline monitoring will be used to determine the existing water quality.




Northbrook Corporation Pty Ltd                       Version 4                               16 September 2013
SMP_v4.docx                                    Commercial in Confidence                               Page 27

Page 32

Noosa on Weyba




FIGURES




Figure 1 Site Location
Figure 2 Sub-catchments
Figure 3 Proposed Stormwater Treatment
         – Areas A to G
Figure 4 Proposed Stormwater Treatment
         – Areas H and I
Figure 5 Proposed Stormwater Treatment
         – Areas J to L

Page 33

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN




                                                                                                                           L AKE E
                                                                                                                                  N TR AN
                                                                                                                         CE BLV
                                                                                                                               D




                                                                                                                                                                                                           Een ie C
                                                                                                                                            ASP ER                                                                 reek
                                                                                                                                                      A PL




                                                                                                                                                                                                       k
                                                                                                                                                                                                 r Cree
                                                                                                    H
                                                                                                        O
                                                                                                         LL
                                                                                                              ET




                                                                                                                                                                                          K ey se
                                                                                                                T
                                                                                                                    RD




                                                                                                                                                                  R
                                                                                                                                                                 D
                                                                                                                                                            AY
                                                                                                                                                           H

                                                                                                                                             W
                                                                                                                                                 AL
                                                                                                                                                    TE
                                                                                                                                                       R
                                                                                                                                                                                                                            SITE
                                                                                                                                                                                     RD
                                                                                                                                                                                 L
                                                                                                                                                                              EL
                                                                                                                                                                          W
                                                                                                                                                                        DS
                                                                                                                                                                      TI




Aerial image sorced from Google Earth



     Cardno (Qld) Pty Ltd All Rights Reserved 2012.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                                                                                                             Scale 1:25,000 (A3)
                                                                                                                                                                                                                                FIGURE 1
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.



                                                                                                                                                                                                                          SITE LOCATION
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corporation Pty Ltd

Page 34

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN




                                                                                                                                                    PreI_5




                                                                                                                                                                      PreH_1

                                                                                                                                               PreI_4                    PreH_2

                                                                                                                                                                         PreH_3


                                                                                                                                    PreI_3
                                                                                                                                                                    PreH_4




                                                                                                                          PreI_2
                                    Pre L


                                                                                                                                                                PreH_5

                                                                                                                       PreI_1
                                                            Pre K                                   HOLLET ROAD
                                                                                                                                                                                       PreG_2
                                                                                                                                                                                                 PreD_3
                                                                                                                                                                                                               HOLLET
                                                                                                                                                                                                                        RPreD_2
                                                                                                                                                                                                                         OAD


                                                                                                                                                                                        PreG_1
                                                                                                                           E
                                                                                                                         IV
                                                                                                                       DR




                                                                                                                                                                                                                              PreD_1   PreC_1 PreB_1
                                                                                                                      Y
                                                                                                                   HA




                                                                                                                                                                                                      PreF_1
                                                                                                                  R
                                                                                                                  TE




                                                                                                                                                                                                                                                 PreB_2
                                                                                                              AL




                                                                                                                                                                                                                                                           PreB_3
                                                                                                             W




                                                                                                                                                                                                                              PreE_1
                                                                                                                                                                                                                                           PreB_4 PreB_5


                                                                                                                                                                                                                                                       PreB_6




                                                                                                                                Catchments PreG_1 and PreF_1 have been modified.
                                                                                                                                Detailed modelling will be required during detailed
                                                                                                                                design. The revised lot layout has not changed the
     Cardno (Qld) Pty Ltd All Rights Reserved 2013.                                                                             concept masterplan stormwater treatment strategy.                                                                                   Scale 1:7,500 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                                Additional treatment devices may be required in some
                                                                                                                                                                                                                                                          FIGURE 2
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.
                                                                                                                                areas.
                                                                                                                                                                                                                                                  SUB-CATCHMENTS
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.




Northbrook Corp Pty Ltd and J&K Hofmann

Page 35

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN




                                                                                                                                             HOLLET
                                                                                                                                                    ROAD
                                                                                                                                                Buffer
                                                      Bio Gardens Filter Area = 558m2                                                           Area



                                                                                                                                                                           Bio Gardens
                                                                                                                                                                              Filter
                                                                                                            Existing                                                          Area =
                                                                                                                                                                              120m2               Lake
                                                                                                            Dam
                                                                                                                                                                                                  Buffer



                                                                                                    Rehabilitated
                                                                                                    Waterway                Bio Gardens
                                                                                                    Corridor           Filter Area = 243m2

                                                                                                                                                                                  Bio Gardens
                                                                                                                                                                                  Filter Area =
                                                                                                                                                                                  120m2




                                                                                                                    Catchments PreG_1 and PreF_1 have been modified.
     Cardno (Qld) Pty Ltd All Rights Reserved 2012.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                                    Detailed modelling will be required during detailed                                           Scale 1:4,000 (A3)
                                                                                                                    design. The revised lot layout has not changed the
                                                                                                                                                                                                                  FIGURE 3
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.

                                                                                                                    concept masterplan stormwater treatment strategy.
                                                                                                                                                                               PROPOSED STORMWATER TREATMENT - AREAS A to G
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.
                                                                                                                    Additional treatment devices may be required in some
                                                                                                                    areas.
Northbrook Corp Pty Ltd and J&K Hofmann

Page 36

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN




                                                                 Rehabilitated
                                                                 Waterway
                                                                 Corridor




                                            Drainage
                                            easements
                                            between roads
                                            and basins will
                                            be provided




T ROAD


                                                                                                    Detailed modelling will be required during detailed
     Cardno (Qld) Pty Ltd All Rights Reserved 2012.
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                    design. The revised lot layout has not changed the                                         Scale 1:4,000 (A3)
                                                                                                    concept masterplan stormwater treatment strategy.
                                                                                                                                                                                               FIGURE 4
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.

                                                                                                    Additional treatment devices may be required in some
                                                                                                                                                           PROPOSED STORMWATER TREATMENT - AREAS H and I
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by third party on the content of this document.
                                                                                                    areas.

Northbrook Corp Pty Ltd and J&K Hofmann

Page 37

NOOSA ON WEYBA
STORMWATER MANAGEMENT PLAN




                                                                                                                                                                                                         Rehabilitated
                                                                                                                                                                                                         Waterway
                                                                                                                                                                                                         Corridor

                                                                                                                                                  Precinct J -
                                                                                                                                                  Stormwater treatment for
                                                                                                                                                  single rural residential lot to
                                                                                                                                                  be defined at later stage




                                                                                                                                                                                                Drainage
                                                                                                                                                                                                easements
                                                                                                                                                                                                between roads
                                                                                                                                                                                                and basins will
                                                                                                                                                                                                be provided




                                                                                                                                                                               Existing
                                                                                                                                                                               Dam


                                                                                                                                          Additional
                                                                                                                                          treatment along
                                                                                                                                          internal road will
                                                                                                                                          be required
                                                                                                                                                                         HOLLET ROAD


                                                                                                    Detailed modelling will be required during detailed
     Cardno (Qld) Pty Ltd All Rights Reserved 2012.                                                 design. The revised lot layout has not changed the                                                                       Scale 1:4,000 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno (Qld) Pty Ltd and
                                                                                                    concept masterplan stormwater treatment strategy.
                                                                                                                                                                                                                             FIGURE 5
may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or
form or on any media, to any person other than by agreement with Cardno (Qld) Pty Ltd.
                                                                                                    Additional treatment devices may be required in some
                                                                                                                                                                                          PROPOSED STORMWATER TREATMENT - AREAS J to L
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by
the client in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not
and shall not assume any responsibility or liability whatsoever to any third party arising out of   areas.
any use or reliance by third party on the content of this document.




Northbrook Corp Pty Ltd and J&K Hofmann

Page 38

Noosa on Weyba




APPENDIX



A
Concept Masterplan


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Concept Masterplan

 

Cc Cardna

Shaping the Future

 

Page 39

NOOSA ON WEYBA| STRUCTURE PLAN                                                                                                                                                NORTHBROOK CORP PTY LTD
© M L Design Pty Ltd   Drawn by: AR
  ACN 100 492 304       File Path: P:\NORT0001_Lake Weyba\B_Documentation\B1_Production\B1_Drawings\InDesign\130208 Alternate Design Considerations
  ABN 89 159 048 228                                                                                                                                  SCALE - 1:10,000 @ A3     APPROVED FOR ISSUE ____   25/09/2013 JOB NO: NORT0001 MP-005-[I]

Page 40

Noosa on Weyba




APPENDIX



B
Water Quality Monitoring


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Water Quality Monitoring

 

C Cardna

Shaping the Future

 

Page 41

                                                                                                                                       O:\5101-19-03\Figures\R3v3 SMP
                                                                                C


                                              Crossing 3                                  D




                         A

                                                                                      F
                                                                B




                                                                                              E
                                                                                                         G


                                                                                                              H




                                                                                                  I




                                                                                    LEGEND        Appendix B
                                                                                                  Water Quality
 Cardno (QLD) Pty Ltd | ABN 57 051 074 992
 Level 11, North Tower, 515 St Pauls Terrace
                                                                                                  Monitoring Sites
 Locked Bag 4006, Fortitude Valley QLD 4006
 Tel: 07 3369 9822       Fax: 07 3369 9722
"© 2012 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole
and every part of this document belongs to Cardno (Qld) Pty Ltd and may
                                                                                                      Noosa on Weyba
not be used, sold, transferred, copied or reproduced in whole or in part in
any manner or form or in or on any media to any person without the prior
written consent of Cardno (Qld) Pty Ltd."

This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of
                                                                                                      Stormwater Management
and use by the client in accordance with the terms of the retainer.
Cardno (Qld) Pty Ltd does not and shall not assume any responsibility or
liability whatsoever to any third party arising out of any use or reliance by
                                                                                                      Plan
any third party on the content of this document.


SHEET                                              A4
Project No:                                     5101-19-3                                                    Scale: 1:20,000
Date:                                           12 April 2013
                                                                                                       200    0   200      400   600
Revision Number:
Designed by:                                                                                                      Metres
Client Name:                          Northbrook Corporation Pty Ltd

Page 42

Water Quality Monitoring Results

Project:                                      Lake Weyba
Address:                                      Tidswell Road, Weyba Downs
Client:                                       Cardno (Qld) Pty Ltd

Surface Water Quality Summary

                                    Date            28/05/2013           28/05/2013           28/05/2013           28/05/2013           28/05/2013           28/05/2013           28/05/2013           28/05/2013           28/05/2013
                                  Location            Site A               Site B               Site C               Site D               Site E               Site F               Site G               Site H                Site I
                                    GPS       56 J 0503567 7076943 56 J 0504079 7076770 56 J 0504599 7077596 56 J 0505163 7077326 56 J 0505276 7076376 56 J 0505068 7076873 56 J 0506104 7076300 56 J 0506205 7076108 56 J 0505940 7075619
                                    Time              12:00                11:30                11:10                10:35                 9:45                10:20                 9:20                 9:05                 8:30


Field Parameters
pH                                 pH units          7.0                  7.0                   7.0                  7.3                  6.0                  6.8                  8.1                  8.2                   8.05
Dissolved Oxygen                    mg/L             5.4                  5.6                   6.8                  6.9                  5.5                  5.4                  7.4                  7.3                   7.2
Turbidity                            ntu             10.2                 7.4                   8.4                  1.6                  3.1                  7.8                  8.6                  2.3                   8.2
Electrical Conductivity             ms/cm            0.16                 0.09                 13.69                34.78                 0.28                 0.17                40.55                40.87                 40.76
                                     o
Temperature                           C              18.5                 19.5                  19.3                 21.4                 17.8                 17.0                 19.0                 18.4                  17.6

Laboratory Parameters
Total Suspended Solids              mg/L              15                   18                   14                   13                   12                    11                   22                   30                   66

Hydroxide Alkalinity as CaCO3       mg/L               -                    -                    -                   <1                   <1                    -                    -                    -                     -
Carbonate Alkalinity as CaCO3       mg/L               -                    -                    -                   <1                   <1                    -                    -                    -                     -
Bicarbonate Alkalinity as CaCO3     mg/L               -                    -                    -                   71                    4                    -                    -                    -                     -
Total Alkalinity as CaCO3           mg/L               -                    -                    -                   71                    4                    -                    -                    -                     -

Sulfate as SO4                      mg/L               -                    -                    -                   1710                 4                     -                    -                    -                     -
Chloride                            mg/L               -                    -                    -                  11400                 49                    -                    -                    -                     -
Calcium                             mg/L               -                    -                    -                   254                  2                     -                    -                    -                     -
Magnesium                           mg/L               -                    -                    -                   836                  3                     -                    -                    -                     -
Sodium                              mg/L               -                    -                    -                   6460                 31                    -                    -                    -                     -
Potassium                           mg/L               -                    -                    -                   276                  1                     -                    -                    -                     -

Total Nitrogen as N                 mg/L             0.6                  1.0                  0.6                   1.1                  0.5                  0.5                  1.0                  1.1                  1.1
Total Phosphorus as P               mg/L             0.02                 0.03                 0.03                  0.10                <0.01                <0.01                 0.04                 0.11                 0.09

Chlorophyll a                      mg/m3              13                   32                   <1                   <1                   12                    <1                   <1                   6                    <1

Faecal Coliforms                  CFU/100ml            -                    -                    -                    -                    -                    -                    10                   20                   50


[OCR of page images]
Cardno Bowler Pty Ltd Telephone: Facsimile:
Cc. ) ABN 74 128 806 735 (07) 5452 0100 (07) 5452 0133
], Bo WLER Address: Email: [email protected]
32 Hi-Tech Drive Website: www.cardno.com.au
Kunda Park Qld 4556
Shaping the Future
Cardno Bowler Offices:

Brisbane, Cais, Townsville, Mackay, Rockhampton, Bundaberg, Sunshine Coast, Gold Coast,
Sydney, Deniliquin, Melbourne, Bendigo, Dandenong

Water Quality Monitoring Results

Project: Lake Weyba
Address: Tidswell Road, Weyba Downs
Client: Cardno (Qld) Pty Ltd

Surface Water Quality Summary

 

 

Date 28/05/2013 28/05/2013 28/05/2013 28/05/2013 28/05/2013 28/05/2013 28/05/2013 28/05/2013 28/05/2013
Location Site A Site B Site C Site D Site E Site F Site G Site H Site |

GPS 56 J 0503567 7076943 56 J 0504079 7076770 56 J 0504599 7077596 56 J 0505163 7077326 56 J 0505276 7076376 56 J 0505068 7076873 56 J 0506104 7076300 56 J 0506205 7076108 56 J 0505940 7075619

Time 12:00 11:30 11:10 10:35 9:45 10:20 9:20 9:05 8:30
Field Parameters
pH PH units 7.0 7.0 7.0 7.3 6.0 6.8 8.1 8.2 8.05
Dissolved Oxygen mg/L 5.4 5.6 6.8 6.9 5.5 5.4 7.4 7.3 7.2
Turbidity ntu 10.2 7.4 8.4 1.6 3.1 7.8 8.6 2.3 8.2
Electrical Conductivity ms/cm 0.16 0.09 13.69 34.78 0.28 0.17 40.55 40.87 40.76
Temperature °C 18.5 19.5 19.3 21.4 17.8 17.0 19.0 18.4 17.6
Laboratory Parameters
Total Suspended Solids mg/L 15 18 14 13 12 1 22 30 66
Hydroxide Alkalinity as CaCO mg/L - - - a a - - - -
Carbonate Alkalinity as CaCO; mg/L - - - a a - - - -
Bicarbonate Alkalinity as CaCO; mg/L. - - - 71 4 - - - -
Total Alkalinity as CaCO mg/L. - - - 71 4 - - - -
Sulfate as SO4 mg/L - - - 1710 4 - - - -
Chloride mg/L - - - 11400 49 - - - -
Calcium mg/L - - - 254 2 - - - -
Magnesium mg/L - - - 836 3 - - - -
Sodium mg/L - - - 6460 31 - - - -
Potassium mg/L - - - 276 1 - - - -
Total Nitrogen as N mg/L 0.6 1.0 0.6 11 0.5 0.5 1.0 11 11
Total Phosphorus as P mg/L 0.02 0.03 0.03 0.10 0.01 0.01 0.04 0.11 0.09
Chlorophyll a mg/m? 13 32 a a 12 a a 6 a
Faecal Coliforms CFU/100mI - - - - - - 10 20 50

 

Page 43

 

Legend MAROOCHY RIVER

“~ Catchment border CATCHMENT
‘\ Sub-catchment border

i State forest

i Protected areas

Mf Urban areas

O Estuarine/marine sites

O Freshwater sites

 

Page 44

             Table B 1            Healthy Waterways Lake Weyba Water Quality Monitoring 2002 - 2012
                                         Susp-                                                                           Total
                                                          Choloro-         Total    Oxidised    Ammonia     Organic                                        Secchi
                                         ended                                                                           Phos-     FRP       DO
                     Turbidity                             phyll a       Nitrogen      N           N           N                                     pH    Depth
                                         Solids                                                                         phorous   (µg/L)   (% sat)
                                                           (µg/L)         (µg/L)     (µg/L)      (µg/L)      (µg/L)                                         (m)
                                         (mg/L)                                                                          (µg/L)
                                                                                             Lake Weyba 1624
      Max               78.0                n/a                6.7        1789.2     367.8        546.7        1780.3    43.6      9.9     158.0     8.5     1.5
     80%                14.0                n/a                2.3        487.1       9.9          60.0        381.7     16.9      1.9     109.1     8.2     1.0
     50%                 6.0                n/a                1.3        328.0       2.0          23.4        299.2     10.9      1.9      99.9     8.0     0.2
     20%                 2.5                n/a                0.8        278.3       2.0          8.9         241.5      7.9      1.9      91.9     7.8     0.2
      Min                0.0                n/a                0.3        149.1       2.0          2.0       70.6         4.0      1.9      75.4     6.2     0.2
                                                                                             Lake Weyba 1625
      Max              277.0                n/a                9.5        934.4      328.0        516.9        884.7     228.2    178.6    152.1     8.5     1.0
     80%                20.0                n/a                3.2        497.0       10.9         83.5        403.6     17.9      1.9     106.6     8.2     1.0
     50%                11.0                n/a                2.0        367.8       2.0          15.9        342.0     11.9      1.9      98.8     8.0     0.2
     20%                 5.0                n/a                0.9        278.3       2.0          4.0         259.5      7.9      1.9      91.4     7.8     0.2
      Min                1.0                n/a                0.3        198.8       2.0          2.0         178.9      4.0      1.9      68.5     6.5     0.2
                                                                                             Lake Weyba 1626
      Max               90.0                n/a                9.2        994.0      526.8        566.6        781.3     327.4    267.8    139.8     8.6     1.5
     80%                22.0                n/a                3.1        516.9       9.9         119.3        384.7     16.9      1.9     106.8     8.2     1.0
     50%                12.0                n/a                1.9        367.8       2.0          11.9        325.1     10.9      1.9      97.5     8.0     0.2
     20%                 5.0                n/a                1.0        288.3       2.0          4.0         264.4      8.9      1.9      92.0     7.8     0.2
      Min                0.0                n/a                0.1        198.8       2.0          2.0        7.0         4.0      1.9      44.2     6.7     0.2
                                                                                             Weyba Creek 1611
      Max               58.0                n/a                6.0        586.5       39.8        159.0        971.1     66.5      4.0     130.7     8.4     3.5
     80%                10.0                n/a                2.4        347.9       8.7          36.8        301.2     16.9      1.9     103.9     8.2     1.5
     50%                 6.0                n/a                1.4        278.3       4.0          17.4        242.5     12.4      1.9      96.2     8.1     0.2
     20%                 3.0                n/a                0.9        208.7       2.0          9.9         187.9      8.9      1.9      89.6     7.9     0.2
      Min                1.0                n/a                0.4        139.2       1.8          3.0         129.2      4.0      1.6      65.1     6.3     0.2

Northbrook Corporation Pty Ltd                                                                                                                             19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx                                                                                          Page 1


[OCR of page images]
Cc Cardno

 

Table B1 Healthy Waterways Lake Weyba Water Quality Monitoring 2002 - 2012

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Turbidi Sup Choloro- Total Oxidised | Ammonia | Organic prea FRP DO Secchi
urbidity Solids phylla Nitrogen N N N phorous (ug/L) (% sat) pH Depth
(mg) | (Hg/t) (ug/L) | (ug/L) | (ug/L) (ug/L) | Pon) (m)
Lake Weyba 1624
Max 78.0 n/a 6.7 1789.2 367.8 546.7 1780.3 43.6 9.9 158.0 8.5 1.5
80% 14.0 n/a 2.3 487.1 9.9 60.0 381.7 16.9 1.9 109.1 8.2 1.0
50% 6.0 n/a 1.3 328.0 2.0 23.4 299.2 10.9 1.9 99.9 8.0 0.2
20% 2.5 n/a 0.8 278.3 2.0 8.9 241.5 7.9 1.9 91.9 7.8 0.2
Min 0.0 n/a 0.3 149.1 2.0 2.0 70.6 4.0 1.9 75.4 6.2 0.2
Lake Weyba 1625
Max 277.0 n/a 9.5 934.4 328.0 516.9 884.7 228.2 178.6 152.1 8.5 1.0
80% 20.0 n/a 3.2 497.0 10.9 83.5 403.6 17.9 1.9 106.6 8.2 1.0
50% 11.0 n/a 2.0 367.8 2.0 15.9 342.0 11.9 1.9 98.8 8.0 0.2
20% 5.0 n/a 0.9 278.3 2.0 4.0 259.5 7.9 1.9 91.4 7.8 0.2
Min 1.0 n/a 0.3 198.8 2.0 2.0 178.9 4.0 1.9 68.5 6.5 0.2
Lake Weyba 1626
Max 90.0 n/a 9.2 994.0 526.8 566.6 781.3 327.4 267.8 139.8 8.6 1.5
80% 22.0 n/a 3.1 516.9 9.9 119.3 384.7 16.9 1.9 106.8 8.2 1.0
50% 12.0 n/a 1.9 367.8 2.0 11.9 325.1 10.9 1.9 97.5 8.0 0.2
20% 5.0 n/a 1.0 288.3 2.0 4.0 264.4 8.9 1.9 92.0 7.8 0.2
Min 0.0 n/a 0.1 198.8 2.0 2.0 7.0 4.0 1.9 44.2 6.7 0.2
Weyba Creek 1611
Max 58.0 n/a 6.0 586.5 39.8 159.0 971.1 66.5 4.0 130.7 8.4 3.5
80% 10.0 n/a 2.4 347.9 8.7 36.8 301.2 16.9 1.9 103.9 8.2 1.5
50% 6.0 n/a 1.4 278.3 4.0 17.4 242.5 12.4 1.9 96.2 8.1 0.2
20% 3.0 n/a 0.9 208.7 2.0 9.9 187.9 8.9 1.9 89.6 7.9 0.2
Min 1.0 n/a 0.4 139.2 1.8 3.0 129.2 4.0 1.6 65.1 6.3 0.2
Northbrook Corporation Pty Ltd 19 April 2013

45101-19-03\wp\R3v3 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx Page 1

Page 45

                                         Susp-                                                                              Total
                                                          Choloro-         Total     Oxidised    Ammonia     Organic                                          Secchi
                                         ended                                                                              Phos-     FRP       DO
                     Turbidity                             phyll a       Nitrogen       N           N           N                                       pH    Depth
                                         Solids                                                                            phorous   (µg/L)   (% sat)
                                                           (µg/L)         (µg/L)      (µg/L)      (µg/L)      (µg/L)                                           (m)
                                         (mg/L)                                                                             (µg/L)
                                                                                    Average of 1624, 1625, 1626 and 1611
      Max              125.8                n/a                7.8        1076.0       315.6       447.3      1104.4        166.4    115.1    145.2     8.5     1.9
     80%                16.5                n/a                2.7        462.2         9.9        74.9        367.8        17.1      1.9     106.6     8.2     1.1
     50%                 8.8                n/a                1.7        335.5         2.5        17.1        302.2        11.5      1.9      98.1     8.0     0.2
     20%                 3.9                n/a                0.9        263.4         2.0         6.7        238.3         8.4      1.9      91.2     7.8     0.2
      Min                0.5                n/a                0.3        171.5         1.9         2.2        96.4          4.0      1.8      63.3     6.4     0.2
                                                                                          Water Quality Objective
     80%                 8.0               20.0                2.5        380.0         15.0       32.0        320.0        16.0      2.0     105.0     8.3     2.0
     50%                 5.0               20.0                1.5        240.0         5.0        15.0        210.0        13.0      2.0      95.0     8.2     1.6
     20%                 2.0               20.0                0.8        150.0         2.0         7.0        130.0        10.0      2.0      85.0     8.0     1.1
# Sourced from Healthy Waterways Ecosystem Health Monitoring Program
# Bolded average values do not meet WQO
# If recorded data was at the test threshold assumed to be value equal to test threshold




Northbrook Corporation Pty Ltd                                                                                                                                19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\AppB_2 WQ Monitoring Summary.docx                                                                                             Page 2

Page 46

Noosa on Weyba




APPENDIX



C
Community Information Leaflet


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Community Information Leaflet

 

cJy Cardnao

Shaping the Future

 

Page 47

Stormwater Quality
and the Community

Working at the continual im-
provement of stormwater quality
will help to protect the natural
environment and ensure that
Noosa on Weyba remains a
beautiful place in which to live.

Using the helpful and practical
tips provided, every member of
the community can make a sig-       What is already being done and
nificant contribution to the on-    what you can do to help.
going best practice stormwater
quality treatment at Noosa on
Weyba.

Page 48

                                                              What is being provided?
                                                              The stormwater quality treatment train employs a range of           What can You do?
                                                              innovative measures to ensure the best results. These in-           Eliminating the source of pollutants is the most effec-
                                                              clude:                                                              tive method of stormwater quality management.

Noosa on Weyba & You                                                  10 kilolitre rainwater tanks for each residential lot.      These are some easy steps that you can take to en-
                                                                                                                                  sure you are contributing to the sustainable nature of
                                                                      (This is more than twice the requirement of Queens-
                                                                      land Development Code)                                      Noosa on Weyba:
Noosa on Weyba is an environmentally friendly residen-                Bio-retention street trees and bio-retention gardens               Minimise use of chemical cleaning products,
tial and retirement living development. It is situated on             incorporated into the road reserve                                 particularly outdoors.
Lake Weyba which is a Fish Habitat Reserve and sur-
rounded by Noosa National Park. Due to the close                      Bio-retention basins
                                                                                                                                         Service motor vehicles regularly and look for
proximity of these natural ecosystems, it is important to             Vegetated bio-retention swales                                     signs of leaking oil, brake fluid or other chemi-
ensure that everything possible is being done to im-                                                                                     cals
prove the ecological footprint of the community.                      Litter baskets

                                                                      Natural wetland                                                    Wash motor vehicles on lawn or in car wash-
As part of the sus-
                                                                      areas                                                              ing bays.
tainable design of
Noosa on Weyba,                                                       Buffers to envi-                                                   Minimise use of fertilizers and avoid applying
best practice water                                                   ronmentally                                                        pesticides to plants and gardens, especially if
sensitive urban de-                                                   sensitive areas                                                    rain is expected.
sign (WSUD)
                                                              These state of the art storm- A bio-retention garden
measures have                                                                                                                            Sweep up and compost garden waste.
                                                              water quality improvement
been adopted. This                                                                                                                       Dumping of green waste along creeks or
                                                              devices work as an integrated, sustainable system in order
is to help ensure                                                                                                                        down the drain spreads weeds and promotes
                                                              to produce high quality stormwater in compliance with the
that runoff is treated                                                                                                                   algal growth.
                         Noosa on Weyba is an                 South East Queensland Healthy Waterways Guidelines.
to the best possible
                         ecologically sensitive area                                                                                     Ensure all house-
quality before it is                                          Bio-retention systems
discharged from site.                                                                                                                    hold rubbish is
                                                              Bio-retention systems are particularly efficient in removing
                                                                                                                                         properly disposed
Even with such efficient stormwater quality treatment in      pollution from stormwater run-off. Water ponds over the
                                                                                                                                         of.
place further improvements can be made by eliminat-           vegetated surface and slowly infiltrates through the under-
ing the sources of pollution. Individuals throughout the      lying filter media. The plants and filter media are specifical-            Never dispose of
community have an important role in improving storm-                                                 ly chosen to ensure high            chemicals down
                               water quality and general                                             levels of nutrient remov-           the stormwater
                               environmental health.                                                 al. Sediments and litter            drain.
                               There are a number of                                                 remain in the forebay
                                                                                                                                         Plant native, ground     Waterwise gardens
                               simple and easy ways to                                               area for easy disposal.
                                                                                                     Treated stormwater is               covering plant spe-      prevent soil erosion
                               ensure that each house-
                               hold can contribute to                                                then discharged down-               cies and mulch to
                               protecting their local envi-                                          stream. Any excess                  prevent soil erosion and conserve water
                                            ronment.                                                 litter will be captured by
                                                                                                                                         Dispose of pet droppings by sealing them in a
                                                                                                     the litter baskets.
   Sweeping up leaves is one easy                                                                                                        bag and depositing into a waste bin
   way to improve stormwater quality                             The Bio-retention process

Page 49

Noosa on Weyba




APPENDIX



D
Underground Rainwater Tank Example


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Underground Rainwater Tank Example

 

cy Cardno’

Shaping the Future

 

Page 50

 

 

 

 

 

 

: REV Date
SPLIT MASTER Twin-Tank Install - 30/7/08
SPLIT MASTER System Scale | Sheet N°
Checked by JM | Drawn BM NTS Aloft J

 

 

 

For technical enquires call 1800 066 587
www.actiontanks.com.au

ROOFWATER
RUNOFF

SQ

      
      
  

 

 

 

 

 

 

 

 

 

OUTSIDE

TAP
i

LAUNDRY

Le

RE-USE WATER PUMPED FROM AWC

 

 

 

 

 

 

 

—*— adidumoq

  

 

 

 

 

 

 

 

 

  

 
  
    
 

  

© 2008 ACTION TANK INDUSTRIES P/L

Split System Control Box with
automatic Mains Water diversion
(Optional Testable Double Check Valve)
No Visible Pipes
First Flush Diverter & Leaf Strainer

Can be located anywhere suitable between
house and Tank

(e.g Garden Bed)

¢ Tank

 
 
    
     
   
 

  

150mm
olted Trap
Screw

One-way Flap Valve
with Inspection
Opening to Surface

if required
GROUND

LEVEL

 

  
 
 
 
      

  

i
Delivery noe | 1” Delivery 3000It 100mm
pipe 4550lt pvertiow
ipe

Electrical
Conduit to AWC

Submersible Pump and Low-level
Cut-off Float switch

Concrete Locking Ring with min. 200mm depth,
on Base Course of Blue Crushed Metal

  
   
   
 

or
SOOOIt
AWC

  

 

 

 

 

[en eS tbe ae Sas i}

“-¢50mm interconnection pipe

 

Page 51

Noosa on Weyba




APPENDIX



E
MUSIC Model Layouts


[OCR of page images]
Noosa on Weyba

 

APPENDIX

MUSIC Model Layouts

 

cy Cardnao

Shaping the Future

 

Page 52

             Image 1              Precinct B

Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 1

Page 53

             Image 2              Precinct C




             Image 3              Precinct D
Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 2

Page 54

             Image 4              Precinct D




             Image 5              Precinct E




Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 3

Page 55

             Image 6              Precinct F




             Image 7              Precinct G



Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 4

Page 56

             Image 8              Precinct H


Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 5

Page 57

             Image 9              Precinct I



Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 6

Page 58

             Image 10             Precinct K




             Image 11             Precinct L



Northbrook Corporation Pty Ltd                                 19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App E MUSIC models.docx        Page 7

Page 59

Noosa on Weyba




APPENDIX



F
Maintenance Plan


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Maintenance Plan

 

cy Cardnao

Shaping the Future

 

Page 60

INTRODUCTION
         The water quality treatment proposed for the Noosa on Weyba development includes a number of bio-
         retention basins and gardens. This appendix provides an overview of their maintenance requirements.
         The litter baskets installed on the field inlets will also need regular maintenance. An example of a
         manufacturer’s maintenance requirements for litter baskets is attached.


Bio-retention Basin and Gardens Maintenance Requirements

Inspection Frequency
         Routine inspections should be undertaken on the bio-retention basins and gardens after every
         significant rainfall event (30mm of rainfall in a 24 hour period) or on a three (3) monthly basis within
         the first twelve (12) months and on a six (6) monthly basis thereafter. The requirements of the
         inspection for the bio-retention basins shall include the following:
                     Check for build-up of sediment at pipe inlet structures, remove as required;
                     Check all concrete structures for damage and deterioration;
                     Check for the build-up of vegetation matter on the bed surface and removal of vegetation
                     matter to ensure minimal blockage to media; and
                     Check achieved flow rate through the media is maintained in accordance with the design
                     requirements.


Maintenance Frequency
         The bio-retention basins and gardens treat stormwater runoff through the principles of sedimentation
         and filtration. The systems are subject to deposition of sediment that is filtered through the media.

         Any accumulated litter including leaves and other debris shall be removed for the surface of the filter
         surface on an as required basis. Inspection and maintenance of the litter baskets should also be
         conducted at this stage. As noted above, the basins are to be inspected after every significant rainfall
         event (30mm of rainfall in a 24 hour period) or on a three (3) monthly basis within the first twelve (12)
         months and on a six (6) monthly basis thereafter.

Data Collection/ Storage Requirements
         Inspection records will be required for comparison of the performance of the system. In order to assist
         this process it is proposed that the Bio-retention Basin Maintenance Checklist prepared by Healthy
         Waterways be adopted for the site. Copies of the completed checklist are to be forwarded to the
         Cardno (Qld) Pty Ltd (or other consultant nominated by the Principal) and to be provided to SCRC at
         the expiry of the maintenance period.

Detailed Maintenance Procedure
         Vegetation plays a key role in maintaining the porosity of the filter media of a bio-retention system in
         and a strong healthy growth of vegetation is critical to its performance. Therefore the most intensive
         period of maintenance is during the plant establishment period (i.e. first two years) when weed
         removal and replanting may be required.

         It is also the time when high sediment loads may impact on plant growth and infiltration rates. For this
         reason, if they are not being used as temporary sedimentation basins, the bio-retention systems are
         initially to be turfed, with geotextile fabric protecting the filter media underneath. Vegetation can be
         introduced when construction has been completed on an appropriate percentage of the catchment
         draining to each bio-retention system. If initial turfing of the bio-retention systems is not considered
         practicable, then it is advised that the majority of the vegetation be screened off during the plant
         establishment phase. This can be done by installing temporary sedimentation fences or similar
         devices to separate the inlet and outlet zone from the remainder of the basin. The inlets and outlets
         should be located close together so that this can easily be managed.

Northbrook Corporation Pty Ltd                                                                         19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App F - Maintenance Plan.docx                                          Page 1

Page 61

         Inflow systems and overflow systems require careful monitoring, as these can be prone to scour and
         litter build up. Debris can block inlets or outlets and can be unsightly.

         The filter media will be inspected for sediment deposition of the bed of the bio-retention basins and
         removed as required.

         Inspect for the accumulation of an impermeable layer (such as oily or clayey sediment) that may have
         formed on the surface of the filter media. A symptom may be that water remains ponded in the bio-
         retention basin for more than a few hours after a rain event. Repair minor accumulations by raking
         away any mulch on the surface and scarifying the surface of the filter media between plants. Any leaf
         litter should be removed to help maintain the surface porosity of the filter media.

         Ensure the perforated pipes are not blocked to prevent filter media and plants from becoming
         waterlogged. A small steady clear flow of water may be observed discharging from the perforated
         pipe at its connection into the downstream pit some hours after rainfall. Note that smaller rainfall
         events after dry weather may be completely absorbed by the filter media and not result in flow. Sub-
         soil drainage lines are to be flushed with clean water as required to remove and blockage.

Vegetation Management
         Watering

         Regular watering of the bio-retention system vegetation is essential for successful establishment and
         healthy growth. The frequency of watering to achieve successful establishment will depend upon
         rainfall, maturity of planting stock and the water holding capacity of the soil.

         The following watering program should be adequate following the installation of vegetation:
                     Week 1-2                  3 visits/week
                     Week 3-6                  2 visits/week
                     Week 7-12                 1 visit/week

         After the first three month period, watering may still be required, particularly during the first winter (dry
         period). Irrigation shall be undertaken in consultation with the Landscape Architect.

         Weed Control and Mulching

         Conventional surface mulching of the bio-retention systems with organic material like tanbark, should
         not be undertaken. Most organic mulch floats and runoff typically causes this material to be washed
         away with a risk of blocking drains. Mulch that is not likely to float should be adopted.

         If weeds are observed within the bio-retention system they shall be removed. Weeding will generally
         involve manual removal of the species.

         Vegetation planting densities are to be in accordance with the Landscape Architect’s design. Where
         necessary a biodegradable erosion mat can be applied to the basin batters to help combat weed
         invasion and reduce the labour intensive maintenance requirements for weed removal.

         Herbicides are not recommended as a means of weed control. If required, however, their application
         is to be managed to avoid unintentional destruction of other vegetation or the introduction of chemicals
         that may contaminate the stormwater runoff.

         Where necessary, in areas that have been extensively weeded, the bio-retention system shall be
         replanted with similar planting densities using suitable native species in accordance with the
         Landscape Architects design.

         Inspection of the existing vegetation is to take place and any dead or diseased vegetation shall be
         removed and replaced with suitable native species in accordance with the Landscape Architects
         design.

Northbrook Corporation Pty Ltd                                                                            19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App F - Maintenance Plan.docx                                             Page 2

Page 62

         The removal of plants, dead or diseased vegetation or weeds shall be disposed offsite at an
         appropriate waste management facility.


Equipment Needs
         The equipment required to undertake regular maintenance to the bioretention systems will be standard
         hand held landscaping tools. No specific mechanical equipment is expected to be required for the
         maintenance of the basins unless resetting is required.


Occupational Health and Safety
         The maintenance activities are to be undertaken in accordance with all current occupational and
         workplace health and safety legislation, regulations, codes of practice or manufacturers guidelines.

         For maintenance access, pathways have been provided for in the design of the bio-retention basins.
         As noted above no mechanical equipment is required unless resetting is required. The batter grades
         are considered to be acceptable and do not pose an occupational health and safety issue given proper
         training to maintenance personnel.

         The application of pesticides or herbicides in response to any weed outbreak, which cannot be
         controlled via manual removal, is to be undertaken by maintenance personnel in accordance with
         manufacturer’s guidelines in consultation with the Landscape Architect. Protective measures are to be
         implemented so as to minimise exposure to personnel, with personal protective measures to be the
         final hierarchical option.

         While maintenance is being undertaken consideration of pedestrians and cyclists is to be made due to
         the close proximity of the footpaths. To avoid any safety concerns it is recommended that temporary
         warning signs be placed at a sufficient distance to allow pedestrians and cyclists to become aware of
         possible maintenance vehicles / personnel when maintenance is being undertaken.




Northbrook Corporation Pty Ltd                                                                     19 April 2013
O:\5101-19-03\wp\R3v3 SMP\Appendices\App F - Maintenance Plan.docx                                      Page 3

Page 63

 

 

saw " TECHNICAL SPECIFICATION
ESEcosol

The RSF 100 Solid Pollutant Filter
WASTEWATER FILTRATION SYSTEMS

 

 

 

9.0 Cleaning an RSF 100 Solid Pollutant Filter

The RSF 100 Solid Pollutant Filter can be cleaned manually or by vacuum using street-sweeping vehicles. The steps
to be followed for each method are similar and are as follows:

* Place appropriate signage, and any necessary traffic
control measures, around the work area and ensure safe
access to the unit

 

* Open and secure the pit access cover or grate

* (Manual method) - lift the internal filtration bag holding the
captured pollutants from the pit (lifting handles are
attached to the removable liner to avoid contact with the
pollutants)

* (Vacuum method) - insert snorkel from suction vehicle and
remove the pollutants from the capture basket

Place the captured material into a receptacle and cover it
ready for transportation to an approved waste disposal
facility

 

 

 

* (Manual method) - prior to reinstalling the liner ensure that
no obstructions exist in the bottom of the gully pit. Remove
obstructions, if any, and carefully re-install the liner into the
aluminium slots

Ensure that the by-pass flap(s) is functioning properly and
make sure that the liner is firmly fitted and not obstructing
the by-pass flap(s)

 

¢ Secure the pit access cover or grate and remove alll
equipment and signage

Ensure any affected areas are restored to their original
condition

 

Street-cleaning equipment can be used to clean
. i the RSF 100 quickly and efficiently with no manual
disposal facility handling of pollutants

Dispose of all captured pollutants at an approved waste

Ecosol has a very competitive cleaning service. After each clean we provide a full report detailing the volume
and type of pollutants removed. We believe that it is in your best interests for Ecosol staff to clean and maintain
the unit, not only because we are specialists, but also because proper monitoring and maintenance enhances
the unit life significantly. Should you use another company to clean the unit, or undertake this work yourself, we
request that it be conducted according to Ecosol’s specifications. Otherwise, you may invalidate your warranty,
as damage caused by inappropriate cleaning procedures is not covered.

The cleaning frequency, and the cost, depend heavily on the surrounding environment, the unit’s proximity to a
waste facility, the number of units, their location, and the type of pollution collected. The advantages of using
Ecosol to clean and maintain your unit are:

* regular inspections of your unit;

* comprehensive cleaning service with the removal and disposal of all captured pollutants;
* a detailed report provided on completion of each clean;

* trained and experienced staff; and

* remedial work completed, if required.

Your Ecosol representative can provide you with the necessary information to clean your RSF 100. More details are available in

Ecosol’s RSF 100 Operation and Maintenance Manual
Page 16
NATURAL ECOLOGICAL SOLUTIONS

 

Page 64

Noosa on Weyba




APPENDIX



G
Response to Information Request


[OCR of page images]
Noosa on Weyba

 

APPENDIX

Response to Information Request

 

cy Cardnao

Shaping the Future

 

Page 65

STORMWATER QUALITY


The following are the responses to SCRC RFI (DW008:MCU12/0208) received on the 28th of February 2013.
Item 90
Issues
The Stormwater Management Plan (Cardno (Qld) Pty Ltd, Stormwater Management Plan, Job Ref.
5101/19-03) has been evaluated and the following are the concerns that need to be addressed prior to
any approval.
   There are concerns regarding the location of bio-retention devices in the proposed buffer to Lake
Weyba on lot 11 where 10 metres of the proposed 50 metre wide buffer will be used for these
devices. This also applies to other areas associated with the proposal where bio-retention devices
are proposed to be located in rehabilitated waterway buffer and open space areas.
The role that elements such as bio-retention basins and swales play in increasing the effectiveness of
wetland buffers is specifically recognised in the Queensland Wetland Buffer Planning Guideline (DERM,
2011) and other relevant planning guidelines. The location of these elements has been situated to ensure
that they do not impact on areas of ecological significance. As stated in the Stormwater Management Plan
(Cardno, September 2013) the proposed lake buffer width is 40 metres and the stormwater treatment zone is
an additional 10 metres. Existing trees within this zone will not be removed.
All stormwater treatment devices will be located outside of the 100 year ARI extent of inundation. The
development plans have been amended to ensure that the proposed stormwater treatment devices within
the development footprint.


   MUSIC modelling has been carried out on the assumption that rainwater storage tanks will be
installed onsite. This may be the intention at this point in time however State Government is
amending the QDC to remove the mandatory requirement for these tanks. Furthermore, the
Government may not allow local authorities to pursue this requirement through their planning
instruments. It is envisaged that as a minimum, the local authority requiring storage tanks for a
proposed development will need to at least justify this requirement.
MUSIC modelling therefore needs to be carried out based on the assumption that no rainwater
storage tanks will be installed on each lot.
Section 8.3 addresses this item.
The MUSIC analysis was re-run to determine the increase in bio-retention treatment size that would be
required to compensate for the loss of the rainwater tanks and still meet the stormwater quality objectives.
As the proposed development has targeted a higher level of treatment than typically required, the increase
required was not as significant as that necessary for similar developments. It was found that if the bio-
retention filter media area in the basins and swales was increased by 25 percent then the WQOs could be
met. The exception was for areas F and G, where a 50 percent increase in the bio-retention gardens was
required. It would also be necessary to drain the roof areas to the road, rather than directly to underground
drainage. The resultant load removal for the combined site was 83% for TSS, 60% for TP and 48% for TN.
While the water quality objectives can be met if the bio-retention areas are increased, it is still recommended
that rainwater tanks be adopted on site. The proposed development aims to promote the use of ecologically
sensitive design and the use of rainwater tanks plays an important role in this regard. As this will be a Body
Corporate development there will be more control available on the development conditions for each lot. The
use of rainwater tanks will significantly reduce the water demand of the site (by up to 53%), reduce
stormwater flows being discharged off-site and allow the remaining treatment devices to be better target
utilised treating ground and road runoff, rather than relatively clean roof runoff.




Northbrook Corporation Pty Ltd                                                                13 September 2013
O:\5101-19-03\wp\R3v4 SMP\Appendices\App G - RFI responses.docx                                         Page 1

Page 66

   It is proposed to combine a detention function within several bio-retention devices. Whilst it is
claimed that more information about these devices will be provided at the detailed design phase, the
main concerns with this approach is the viability of combining detention with bio-retention where
vegetation could be drowned by prolonged periods of rainfall.
The use of bio-retention within detention basins is standard practice. The extended detention zone will not
be different to that of bio-retention basins, and the area will be planted with suitable plants that can tolerate
prolonged periods of ponding. Only the bio-retention zone within the basin will experience prolonged periods
of ponding. The remainder of the basin will be located at a higher level and function similar to a traditional
detention basin.
The outlets of the basins will be suitably sized using a program such as XP-SWMM to show that sufficient
attenuation of peak flows can be provided for all storm events. The bio-retention extended detention zone
will be assumed to be full, as antecedent rainfall may fill this storage volume prior to the peak storm event
occurring.
The Healthy Waterways MUSIC Modelling Guidelines (2010) state that when bio-retention is incorporated
into the base of a retarding basin, that the volume above the top of the extended detention depth should not
be included in the model for water quality assessment. Flood storage was not included in the stormwater
quality modelling. BCC practice notes for bio-retention basins also state that they can be incorporated into
retarding basins.
Off-line detention basins have only been proposed for catchments E3, F7 and F8. These are the catchments
that drain directly to Eenie Creek and its tributaries. The other catchments that drain to Keyser Creek or
Eenie Creek will have “on-line” attenuation of peak flows for all storm events provided by the proposed
culvert crossings. The results of this assessment are summarised in Section 8.2 and Appendix G of the
Flood Study (Cardno, September 2013). Refer to comparison points Q3, Q5 and EC4 in Table G3 to
compare the existing and developed case peak flows. The flood modelling that was conducted for the
developed case assumed that all of the site had developed case inflows (i.e. increased due to the greater
impervious areas), except for catchments E3, F7 and F8, as these flows will be reduced to existing case
levels by the proposed detention basins. The details of these basins will be determined at the detailed
design stage. Although Precinct H drains to a point in Keyser Creek downstream of the proposed culvert
crossings, the over-attenuation provided by these crossings is sufficient to ensure that peak flows are not
increased. It should be noted that the attenuation that will be provided by the bio-retention basins and
rainwater tanks has not been included in the flooding analysis. These will provide some additional
attenuation, particularly for the minor storm events. Therefore the developed case peak flows that have
been modelled are a conservative assumption. Appropriate erosion and scour control measures will be
required on all outlets and culvert crossings.


   Lake Weyba Water Quality Objectives (WQOs) are provided and it‘s further mentioned that Healthy
Waterways undertakes regular monitoring under an Ecosystem Health Monitoring Program. It is
further claimed in relation to this that MUSIC modelling (for the WSUD) background concentrations
can be higher in some instances than the WQOs (eg background Total P concentration in bio-
retention systems is assumed to be 130 g/L, >WQO concentration) and therefore concentration
based WQOs cannot be determined through MUSIC modelling.
From this, the consultant recommends that the results from water quality monitoring carried out by
the Healthy Waterways be used to determine whether there is an impact from the development.
Whilst these results can be used, the applicant will need to be responsible by implementing an
appropriately tailored water monitoring program as the Healthy Waterways monitoring may not suit
the specifics of the proposal and cannot be relied on to continue for the life of the development
especially where a State Government could either halt or reduce funding for such programs.
Section 5.3 addresses this item.
A monitoring program has been proposed for the site so that the existing water quality parameters can be
defined, and the effectiveness of the proposed stormwater treatment devices can be established.




Northbrook Corporation Pty Ltd                                                                  13 September 2013
O:\5101-19-03\wp\R3v4 SMP\Appendices\App G - RFI responses.docx                                           Page 2

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗