Council archive · source document
Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba
Stormwater Management Plan
Table 5-1 Water Quality Monitoring Parameters
Frequency Location Water Quality Parameter
Turbidity TSS Chlorop TN TP DO pH EC Temp Cations Faecal
hyll a & Coli-
Anions forms
Prior to Construction
Quarterly for Sites A to I
minimum period of
12 months
Quarterly for Sites G, H, I
minimum period of
12 months
Quarterly for Site D & E
minimum period of
12 months
Construction Stage^
Monthly Site D & E
Monthly and when Sediment
dewatering Control Ponds
Monthly Sites A to I
Operational Phase
Monthly for a period Sites A to I
of 12 months,
quarterly thereafter
Monthly for a period Site D & E
of 12 months,
quarterly thereafter
Monthly for a period Sites G, H, I
of 12 months,
quarterly thereafter
^ Construction stage water quality objectives are applicable.
The water quality values for the existing case will be statistically analysed according to ANZECC requirements to determine the appropriate water quality
guidelines.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.