Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 16- Amended Stormwater Management Plan MCU12/0208

of 66

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa on Weyba
Stormwater Management Plan



Table 5-1       Water Quality Monitoring Parameters
       Frequency                 Location                                                         Water Quality Parameter
                                                  Turbidity     TSS   Chlorop        TN           TP        DO         pH   EC   Temp   Cations      Faecal
                                                                       hyll a                                                              &          Coli-
                                                                                                                                        Anions       forms
                                                                                Prior to Construction
     Quarterly for               Sites A to I                                                                             
   minimum period of
       12 months
     Quarterly for             Sites G, H, I                                                                                                            
   minimum period of
       12 months
     Quarterly for               Site D & E                                                                                               
   minimum period of
       12 months
                                                                                Construction Stage^
         Monthly                 Site D & E                                                                                               
   Monthly and when             Sediment                                                                                     
     dewatering               Control Ponds
       Monthly                 Sites A to I                                                                                   
                                                                                Operational Phase
  Monthly for a period           Sites A to I                                                                                                  
    of 12 months,
  quarterly thereafter
  Monthly for a period           Site D & E                                                                                               
    of 12 months,
  quarterly thereafter
  Monthly for a period         Sites G, H, I                                                                                                            
    of 12 months,
  quarterly thereafter
^ Construction stage water quality objectives are applicable.


The water quality values for the existing case will be statistically analysed according to ANZECC requirements to determine the appropriate water quality
guidelines.




Northbrook Corporation Pty Ltd                                                    Version 4                                                   16 September 2013
SMP_v4.docx                                                                 Commercial in Confidence                                                   Page 11

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.