Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba
Stormwater Management Plan
6 Proposed WSUD Strategy
6.1 Summary
The proposed WSUD features are shown in Figures 3, 4 and 5. In summary the WSUD strategy for the site
included:
Community Education. The most effective treatment measure is to reduce the source of pollutants.
Therefore community education is proposed so that residents are informed about what they can do to
reduce their impact on their surrounding environment. Information signs will be located at stormwater
devices. An information leaflet will be distributed to each residence prior to the wet season each year.
An example of the information leaflet is contained in Appendix C. As the development is a Community
Title Scheme the body corporate will also be able to instigate appropriate measures to reduce pollutant
loads from communal areas.
Reducing Potable Water Demand. Water efficient devices and appliances will be installed in each
residence. Drought tolerant gardens will also be recommended.
Providing an Alternative Water Source. All practically available roof area will be connected to
rainwater tanks that will be larger than QDC requirements, so as to maximise rainwater harvesting on
site, minimise potable water demand and reduce the volume of stormwater discharged from site.
Rainwater tanks will be used for toilet flushing, laundry and irrigation purposes.
Bio-retention Basins. Bio-retention basins are located at the end of the stormwater line, upstream of
the point of discharge from the site. Stormwater ponds in the basins before slowly percolating through
the vegetated filtration media and being treated through bio-filtration processes. Filtered stormwater is
collected by perforated pipes and the discharged from site. Coarse sediment forebays will be located at
the inlet points to capture sediment and prevent blockage of the filter media.
Bio-retention Gardens. Bio-retention gardens are small bio-retention basins that double as
landscaped areas within the road reserve. They will treat runoff through bio-filtration before it is
discharged to the stormwater system. Bio-retention gardens are suitable is relatively flat areas.
Bio-retention Tree Pits. Bio-retention tree pits are trees located within filter media within the road
reserve. They can provide some pre-treatment of runoff from the road prior to it being discharged to the
stormwater system. Additional treatment will be required downstream. Tree-pits can be located in
moderately sloped areas.
Bio-retention Swales. Bio-retention swales are like standard vegetated swales but with a filter media
layer to provide additional treatment of stormwater. They are typically located along road-sides and can
be used in flat to moderately sloped areas (around 2 percent).
Vegetated Swales. Vegetated swales will be used where underdrainage or slope requirements make
the use of bio-retention swales impractical.
Litter Baskets. Bio-retention basins and gardens are generally sufficient to capture any gross
pollutants or litter from urban areas. However, as an additional treatment measure litter baskets will be
installed on the field inlets of bio-retention gardens, swales and basins, as well as any other stormwater
outlet discharging to the receiving waterways.
Revegetation of Lake Weyba Buffer Area. A 40 metre wide lake buffer will be located along Lake
Weyba. This will provide additional treatment of stormwater that may overflow from the adjacent bio-
retention swales located in the 10 metre stormwater treatment zone. The buffer area, which has mostly
been cleared of vegetation for use as cattle grazing, will be revegetated, which will improve its
performance as a buffer treatment area, and improve bank stabilisation.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.