Attachment 16- Amended Stormwater Management Plan MCU12/0208

of 66

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa on Weyba
Stormwater Management Plan



Table 7-4       Bio-retention Node Details
                                        2
    Catchment          Filter Area (m )         Surface Area     Filter Depth (m)      Extended          Overflow Weir
      Name                                            2
                                                    (m )                            Detention Depth        Width (m)
                                                                                          (m)
        1_B_2                    300                300                 0.6                 0                 30.0
        1_B_3                    140                140                 0.6                 0                 14.0
        1_D_2                    195                195                 0.6                 0                 19.5
        2_G_2                    125                125                 0.6                 0                 12.5
        3_H_1                    80                 80                  0.6                 0                 8.0
        3_H_2                    105                105                 0.6                 0                 10.5
         4_K                     90                 90                  0.6                 0                 9.0


Table 7-5       Swale Node Details

  Catchment                  Length                 Low Flow      Base Width    Top Width       Depth (m)       Slope
    Name                       (m)                   Bypass          (m)           (m)                           (%)
                                                        3
                                                      (m /s)
                   Modelled            Actual
                    Length             Length
     1_B_2             50               100           0.017           3.0           5.4            0.3               1.5
     1_B_3             70               140           0.008           1.0           3.4            0.3               1.4
     1_D_2             195              390           0.011           0.5           4.1            0.3               2.0
     2_G_2             125              250           0.007           0.5           4.1            0.3               0.5
     3_H_1             80               160           0.004           0.5           4.1            0.3               0.5
     3_H_2             105              210           0.006           0.5           4.1            0.3               2.0
        4_K            45               90            0.005           1.0           4.6            0.3               0.5


The actual widths of the bio-retention swales may be wider than shown in Table 7-5 to allow for appropriate
battering.

7.3.4           Vegetated Swales
The details of the proposed vegetated swales are shown in Table 7-6. Vegetated swales were proposed in
areas considered to be too steep for bio-retention swales or where there was insufficient vertical
differentiation for underdrainage to be installed. The batter slopes were assumed to be 1 in 6 as they are
adjacent to roadways.
Table 7-6       Vegetated Swale Details

  Catchment                  Length                 Low Flow      Base Width    Top Width       Depth (m)       Slope
    Name                       (m)                   Bypass          (m)           (m)                           (%)
                                                        3
                                                      (m /s)
                   Modelled            Actual
                    Length             Length
     1_B_6             65               130              0.0          0.0           3.6            0.3               3.0

     3_H_5             260              520              0.0          0.0           3.6            0.3               0.5




Northbrook Corporation Pty Ltd                            Version 4                                      16 September 2013
SMP_v4.docx                                         Commercial in Confidence                                      Page 22

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗