Council archive · source document
Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
: REV Date
SPLIT MASTER Twin-Tank Install - 30/7/08
SPLIT MASTER System Scale | Sheet N°
Checked by JM | Drawn BM NTS Aloft J
For technical enquires call 1800 066 587
www.actiontanks.com.au
ROOFWATER
RUNOFF
SQ
OUTSIDE
TAP
i
LAUNDRY
Le
RE-USE WATER PUMPED FROM AWC
—*— adidumoq
© 2008 ACTION TANK INDUSTRIES P/L
Split System Control Box with
automatic Mains Water diversion
(Optional Testable Double Check Valve)
No Visible Pipes
First Flush Diverter & Leaf Strainer
Can be located anywhere suitable between
house and Tank
(e.g Garden Bed)
¢ Tank
150mm
olted Trap
Screw
One-way Flap Valve
with Inspection
Opening to Surface
if required
GROUND
LEVEL
i
Delivery noe | 1” Delivery 3000It 100mm
pipe 4550lt pvertiow
ipe
Electrical
Conduit to AWC
Submersible Pump and Low-level
Cut-off Float switch
Concrete Locking Ring with min. 200mm depth,
on Base Course of Blue Crushed Metal
or
SOOOIt
AWC
[en eS tbe ae Sas i}
“-¢50mm interconnection pipe
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.