                                                                                                                                      Permit

                                                                         Environmental authority P-EA-100232409


G10             All analyses required under this environmental authority must be carried out by a laboratory that has
                National Association of Testing Authorities (NATA) certification, or an equivalent certification, for such
                analyses. The only exception to this condition is for in situ monitoring of water quality parameters.
G11             When required by the administering authority, monitoring must be undertaken in the manner
                prescribed by the administering authority, to investigate a complaint of environmental nuisance
                arising from the activity. The monitoring results must be provided within 10 business days to the
                administering authority upon its request.

G12             At least five (5) business days prior to commencing a dredge operation, written notification must
                be provided to the administering authority of the following:
                     1. Commencement date of the dredge operation.
                     2. Expected end date of the dredge operation.
G13             The characterisation of sediments and suitability for land-based disposal of dredged material
                must be submitted to the administering authority in accordance with methodology provided in
                the latest edition of the:
                     • National Environment Protection (Assessment of Site Contamination) Amendment Measure;
                         and
                     • Queensland Acid Sulfate Soil Technical Manual …and any other relevant guideline specified
                         by the administering authority, at 20 business days prior to the commencement of the
                         dredging activity.

                Note: It is the responsibility of the operator to determine whether previous characterisation of sediments are suitable for assessing
                risks to environmental values associated with the dredging campaign to which this environmental authority relates.

G14             Chemicals and fuels in containers of greater than 15 litres must be stored within a secondary
                containment system
G15             Any containment area specified in condition G14 must be certified by appropriately qualified
                person(s) (e.g. registered professional engineer of Queensland) and maintained to that
                condition.




_____________________________________________________________________________________________________________

Page        5      of         13                                                                                        ABN 46 640 294 485

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Environmental Authority P-EA-100232409.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.