Attachment 3 - Construction Management Plan · OPW25/0206

of 15

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
RACV Noosa – Construction
   Management Plan


Contents
Project Details .............................................................................................................................................................................................................2
Site Environmental Management Plan (SEMP) ....................................................................................................................................3
Part A - SEMP Cover Form ................................................................................................................................................................................. 4
Part B - Management Plans...............................................................................................................................................................................7
Part C - Site Rehabilitation Plan ......................................................................................................................................................................7
Tree Management Plan ........................................................................................................................................................................................7
Appendix 1 - Construction Management Plan.......................................................................................................................................7

Appendix 2 - Work Health and Safety Management Plan ............................................................................................................10
Appendix 3 – Pedestrian and Traffic Management Plan ................................................................................................................. 11
Appendix 4 - Emergency Management Plan....................................................................................................................................... 15




                                                                                  P.O. Box 320, Eudlo                                   E. [email protected]
                                                                                  Queensland, 4554,                                     P. 0408 011 584 | ABN 18 766 198 454
                                                                                  Australia                                             www.biodiverse-environmental.com.au


                                                                      FLORA | FAUNA | REHABILITATION | FIRE | WATER
Full text of the other 14 pages

Page 2

Project Details
Client details   Noosa Council

Site address     94 Noosa Drive, Noosa Heads, Queensland, 4567

Description      Tree removal as per the ‘Site Plan – Tree retention vs removal
                 plan’. Dated 24/11/2025

Access point/s Via Sanctuary drive entrance to RACV resort.
if applicable

Proposed start date February 2026          Completion date               April 2026



Biodiverse Environmental Project Manager

Name             Kate Seehuusen

Position         Principal Botanist and Natural Area Lead

Phone            0400 075 354

Email            [email protected]



Authorisation



As a representative of the company in control of the site, I have authorisation to
sign these site plans on behalf of Biodiverse Environmental and take responsibility
for ensuring compliance with our commitment specified herein and any relevant
legislation.



Name and Position Kate Seehuusen – Principal Botanist and Natural Area Lead



Signature


Date                 02/02/2026




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 3

Site Environmental Management Plan (SEMP)

Introduction

This Site Environmental Management Plan (SEMP) details the potential environmental impacts of the
proposed use and development and the ways that these impacts may be reduced by management
strategies and practices. The objectives of this SEMP are to address environmental, council guidelines
and rehabilitation requirements and ensure that potential environmental impacts are prevented or
mitigated.



A copy of the SEMP must be kept on site at all times during the construction period.



The following has been submitted as part of the SEMP package:

Part A - SEMP Cover Form

Part B - Attachments - Construction Management Plan, WHS Construction Safety Plan, Traffic
Management Plan

Part C - Site Rehabilitation Plan including rehabilitation areas and other necessary documentation




                                       P.O. Box 320, Eudlo           E. [email protected]
                                       Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                       Australia                     www.biodiverse-environmental.com.au


                                 FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 4

Part A - SEMP Cover Form

Site Location

94 Noosa Drive, Noosa Heads, Queensland, 4567



Project Description

The scope of works includes tree clearing as per the ‘Site Plan – Tree retention vs removal plan’. Dated
24/11/2025



Project Management

Biodiverse Environmental Kate Seehuusen          Phone     0400 075 354



Construction Schedule

        Identify correct location of all boundaries and services prior to commencement of works

        Locate and identify trees to be removed according to the tree plan

        Remove and chip trees using a suitably qualified arborist under supervision to be completed
        within 1 month after OPW permit being issued



Construction Techniques/Activities

Suitably qualified arborist team will be engaged to remove trees identified by the Site Plan – Tree
retention vs removal plan’. Dated 24/11/2025.

Climbing arborists will be utilised to ‘piece down’ trees to ensure that there is no off target damage to
retained trees.

A mobile chipping truck (approx. 12m3) and potentially an EWP (Elevated Work Platform) will be used to
complete the tree removal works. A grab will be used to move logs to the chipper.




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 5

Site Safety and Environmental Risks


                   RISK                                    MEASURES TO ADDRESS RISK

   Outdoor work and work in public               Set up exclusion zones, signs and spotters
   spaces
                                                 Sun safe clothing and correct PPE
                                                 Water and amenities available
                                                 Take adequate break in the shade
                                                 First Aid kit and qualified first aid provider onsite
                                                 Exclude public from site – barriers/cones
   Using powered tools – brush                   Set up exclusion zones, signs and spotters
   cutters, whippers, blowers,
   chainsaws etc.                                Use the most appropriate tool for the task
                                                 Induction/training for use
                                                 Rotate the task to reduce fatigue and share the heavier
                                                 work around
                                                 Use correct PPE
                                                 Check maintenance of plant and equipment
                                                 Clean up and make the area safe at the end of the job
                                                 Follow all relevant SWMS
   Working with/near heavy                       Inspect site prior to work commencing to identify and
   machinery
                                                 remove hazards
                                                 Ensure operators are licensed
                                                 Follow work plans and instructions, ensure pre-start
                                                 meeting
                                                 Use UHF radios to maintain positive communication
                                                 Where practical, eliminate the need for people working
                                                 within heavy machinery zone, or if unavoidable have
                                                 pre-arranged signals and knowledge of movements
                                                 and maintain direct liaison between relevant parties
                                                 Work up-wind or out of fume/dust range
                                                 Only approach machinery at a standstill and never
                                                 from the rear
   Working with/near animals                     Provide appropriate animal handling training




Site Environmental Values

As per Site Plan – Tree retention vs removal plan’. Dated 24/11/2025

As per Weed Management Plan.




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 6

Project Monitoring

Photographs will be taken of the site at times prior to, during and following the construction period and
supplied to the responsible authority on request to demonstrate compliance with the SEMP. Progress
reports and photographic recordings are to be taken from locations determined by Site Supervisor and
Project Manager.



Declaration



I agree to ensure that:

  All site and environmental protection measures outlined within the approved SEMP will be adhered
to.

  All endorsed plans will be adhered to.

  All site rehabilitation and revegetation works will be undertaken in accordance with the approved
SEMP.

  Prior to construction personnel commencing work, the site supervisor will ensure:

  An appropriate site induction has been undertaken

  Equipment/Plant will be serviced off-site.

   All equipment will be cleaned and free of vegetation, soil and seed prior to being brought on to the
site.

  Advice will be obtained from the ‘Dial Before You Dig’ service to determine the location of existing
services onsite.




                     Kate Seehuusen



                          Full Name                                     Signature



Date: 02/02/2026




                                            P.O. Box 320, Eudlo           E. [email protected]
                                            Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                            Australia                     www.biodiverse-environmental.com.au


                                      FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 7

Part B - Management Plans

 Construction Management Plan:                           See Appendix 1
 WHS Management Plan:                                    See Appendix 2
 Pedestrian and Traffic Management Plan:                 See Appendix 3
 Emergency Management Plan:                              See Appendix 4




Part C - Site Rehabilitation Plan

Erosion and sedimentation controls where applicable will be managed in accordance with local
authority requirements to prevent sediment-laden water from entering any sewer, drainage system or
natural waterway.

Controls will be implemented to protect pollution of watercourses from spoil and to prevent creation of
dust nuisance to adjoining neighbours. Construction work will be arranged such that exposed surfaces
are kept to a minimum at all times. Measures will be implemented to minimise the spread of mud on
vehicle tyres on adjoining roadways, including provision for on-site clean up if necessary.

Root balls will remain intact so soil disturbance is minimal. If deemed necessary, a mulch berm may be
installed to prevent any overland flow however due to the topography of the site and the removal
method being low impact this is likely a precautionary measure.

Tree Management Plan
The tree management plan identifies all trees within the project footprint which are to be retained or
removed. Trees to be removed will be identified using fluro marker paint in the form of a X. Trees will be
‘pieced down’ by climbing arborists and /or an EWP. Root balls will remain in the ground and heads will
be chipped.

Appendix 1 - Construction Management Plan
 Construction works
 Is construction in stages?                                       Yes      No

 If Yes, give details of stages for demolition/excavation/construction

         Identify correct location of all boundaries and services prior to commencement of works
         Locate and identify trees to be removed according to the tree plan
         Remove and chip trees using a suitably qualified arborist under supervision
 Is a building permit required for the works?                   Yes     No




                                        P.O. Box 320, Eudlo             E. [email protected]
                                        Queensland, 4554,               P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                       www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 8

                       Construction matters and measures to be implemented
                                             Chemical Storage
Storage of            Control measures for chemical storage to be implemented include:
chemicals such as             Storing all chemicals in sealed containers in weatherproof lockable
herbicides, fuels             storage
and surfactants               Storing copies of SDS’ for all chemicals
                              Removing chemicals at the end of each day and safely storing them off
                              site
                              Providing spill kits onsite
                                                     Dust
Airborne Dust         Dust control measures may include:
                              Earth moving management
                              Covering loads
                              Limiting cleared area
                              Site traffic control
                              Soil compaction
                              Watering sprays
                              Vegetative stabilisation
                                                     Noise
Noise associated      Construction work that makes audible noise must be carried out under the
with construction     following conditions:
including vehicles,            Between the hours of 7am and 5pm, Monday to Friday
voices, workers       Noise control measures to be implemented may include:
and radios etc.                Maintaining all machinery and equipment in good working order
                               Locating noisy site equipment, where possible, being structures that act
                               as barriers or at a distance from noise sensitive areas
                               Orienting equipment so that noise emissions are directed away from
                               noise sensitive areas
                               RACV to give prior notification to the community and adjoining property
                               holders when noisy operations are to be conducted
                               RACV to implement complaint management process and procedures
Noise associated      Regulated devices include such items as lawnmowers, generators, power tools
with regulated        and compressors:
devises                        Are not to be operated before 7am and after 5pm, Monday to Friday or
                               on any other day at any time
                      Noise control measures to be implemented may include:
                               Maintaining all regulated devices in good working order
                               Orienting regulated devices so that noise emissions are directed away
                               from noise sensitive areas
                Protection of Council assets (streets, footpaths, laneways and reserves)
Protection of          Control measures to protect council assets such as streets, footpaths, laneways
Council assets         and reserves include:
(streets, footpaths,           Planning site usage to restrict vehicles from crossing gutters and
laneways and                   footpaths
reserves)                      Not overloading vehicles and ensuring gutters and footpaths are not
                               subject to potentially damaging loads
                               Protecting pavements and gutters with barriers




                                      P.O. Box 320, Eudlo           E. [email protected]
                                      Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                      Australia                     www.biodiverse-environmental.com.au


                                FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 9

                                                 Parking
Near site parking     Control measures to manage parking near site include:
                             Providing staff and contractors with details of available parking sites
                             (including a map if applicable) during works
                             RACV to provide parking for staff and contractors. Machinery will be
                             within the project footprint and away from pedestrians and vehicles
                                                 Signage
Signage                      Signage will be installed in prominent locations on the boundaries of the
                             site advising of the proposed development, the expected time frames
                             and the site contact details
                                   Stormwater and sediment control
Stormwater and        Stormwater and sediment control measures to implement include:
sediment laden               Establishing and maintaining minimum number of entry/exit points for
runoff along roads,          stabilized site access. Ideally this will be a single entry/exit point
drains and                   Establishing and maintaining barriers to divert rainwater from upslope,
footpaths etc.               above the site, away from development area
                                          Traffic Management
Road, Lane            See Traffic Management Plan
Closures and
Mobile Cranes on
Council Land
Pedestrian and        See Traffic Management Plan
cyclist access
around the site
and traffic on
adjoining roads.
Movement of           See Traffic Management Plan
heavy vehicles to
and from the site
                                        Trees and Vegetation
Protection of trees   Control measures to protect trees and vegetation onsite include:
and vegetation               Identifying all trees and vegetation to be protected during construction
onsite                       and performing a survey of these before and after works have taken
                             place
                             Establishing ‘no go’ areas with barriers
                             Tagging trees and plants that are to be protected
                                         Waste Management
Waste material        Control measures to manage waste material onsite include:
onsite                       Avoiding products that are over packaged to reduce waste
                             Minimising over estimation of materials required to reduce waste
                             Performing site clean-up, at least daily, to remove any litter/debris and
                             prevent building waste from blowing off site
Removal of                   Not applicable
hazardous waste
from site (if
applicable)




                                      P.O. Box 320, Eudlo           E. [email protected]
                                      Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                      Australia                     www.biodiverse-environmental.com.au


                                FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 10

Appendix 2 - Work Health and Safety Management
Plan
                              Work Health and Safety matters and measures
                                          Chemical Management
Chemical             Risks associated with chemical use will be managed by:
Storage and                 Storing chemicals in accordance with relevant legislation and regulations
Use                         Using chemicals as per their label or approved off label usage
                            Ensuring all staff using chemicals have adequate and relevant training
                            Locating Safety Data Sheets (SDS) for all chemicals used are located in all
                            vehicles accessing the site
                                          Emergency Procedures
Emergency            An emergency evacuation plan has been developed, and a copy of this plan is
evacuation           located on site
plan                 See Appendices for Emergency Plan Map
Emergency            An emergency contact list has been developed, and a copy of this list is located on
contacts             site
                     See Appendices for Emergency Plan Map

Emergency            All vehicles are equipped with fire extinguishers. These are tested by an approved
equipment            provider every 6 months.
                                                   Equipment
Use of               Risks associated with equipment use will be managed by:
equipment                    Maintaining equipment in good working order
                             Tagging unsafe equipment and withdrawing them from service
                             Ensuring staff are licensed where required
                             Providing staff with required PPE
                                       First Aid and injury management
First aid kits               A maintained first aid kit is located in all vehicles and buildings
                             First aid kit locations are signed
First aid officers           All site supervisors are trained to administer basic first aid
Seeking                      In the event that medical care must be sought the nearest doctor’s surgery
medical care                 is:
                                      Clinic Name: Noosa Heads Medical
                                      Address: Unit 1/16 Lanyana Way, NOOSA HEADS QLD 4567
                                      Contact Number: 07 5489 8066
                             In the event that urgent medical care must be sought the nearest hospital is
                             located at:
                                      Hospital: Noosa Hospital
                                      Address: 111 Goodchap Street, NOOSAVILLE QLD 4566
                                      Contact Number: 07 5455 9200

                                   In the case of an emergency requiring an ambulance call 000




                                         P.O. Box 320, Eudlo           E. [email protected]
                                         Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                         Australia                     www.biodiverse-environmental.com.au


                                   FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 11

                                            Incident Reporting
Reporting a      Incident reporting is managed by:
hazard, injury            Completing incident report forms if any hazard/injury/incident occurs, this
or incident               includes near misses
                          Reporting incidents to site supervisors and SEMP Manager
                          Ensuring incident report forms are located in all vehicles accessing the site
                                             Risk Assessment
Risk             Risk is managed by a system of:
Management                Workplace assessment
                          Hazard identification
                          Remedial action
                          Updating WHS
                 Documentation and reports that will be used in this process include:
                          Biodiverse Environmentals Job Safety analysis forms
                          Safe Work Method Statement - SWMS
                                         Training and Induction
Documentation    Training records will be maintained as evidence of training delivery and assessment
                 of competence
Generic WHS      All staff have the skills and knowledge acquired from:
training                  General induction training
                          Using JSA forms
Risk specific    Staff required to conduct activities with a specific health and safety risk have
WHS training     completed relevant training for:
                      • First aid
Task specific    Staff required to conduct activities with a specific health and safety risk have
WHS training     completed training relevant to the project such as:
                      • Agricultural chemical use
                      • Chainsaw use



Appendix 3 – Pedestrian and Traffic Management Plan
                    Traffic matters and safety measures to be implemented
                                         Traffic Management
Traffic             If a formal traffic management plan is identified as being required for tree
Management Plan     clearing works it will include the following:

                    i. a Traffic Management Control Plan in accordance with the Manual of Uniform
                    Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                    control measures prior to construction;

                    ii. maintenance of safe vehicle and pedestrian access for the areas affected by
                    the works during and after daily construction has ceased;

                    iii. proposed fencing to the site during the construction phase of the
                    development;




                                     P.O. Box 320, Eudlo           E. [email protected]
                                     Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                     Australia                     www.biodiverse-environmental.com.au


                               FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 12

                       iv. approval of the Traffic Management Control Plan by the Department of
                       Transport and Main Roads (DTMR) for any works on State controlled roads; and

                       v. provision for worker car parking.
                                           Council owned land
Work on road         Permission will be sought from the relevant local Council if work is to be carried
reserves or          out on a road reserve or Council owned land
council owned
land
                                                  Deliveries
Deliveries to site   Safety measures to be implemented to ensure deliveries to the site are
                     undertaken in a safe manner include:
                         • Locating the delivery drop off point/s so that delivery vehicles do have to
                              cross the site
                         • Delivery drop off points to be clearly marked
                         • Deliveries to be scheduled outside of peak traffic and pedestrian times in
                              the area
                                          Emergency Vehicle Access
Ambulance or         Measures to be implemented to ensure emergency vehicles movement is not
fire vehicle         impeded include:
access                   • Notifying emergency services of any road or lane closures
                                              Hours of Operation
General Hours of     Access to site by construction vehicles must be carried out between the hours of
Operation            7am and 5pm Monday to Friday.
Peak                 Measures to be implemented to ensure periods of peak vehicle and pedestrian
traffic/pedestrian   traffic in the area adjoining the site include:
hours                    • Limiting vehicle access to the site during peak pedestrian traffic in the area
                              specifically on a business day between 7am and 5pm.
                         • Limiting vehicle access to the site during peak vehicle traffic in the area
                              specifically on a business day between 7am and 5pm
                                                    Parking
Parking for          Control measures to manage parking near and onsite include:
workers and site         • RACV to provide staff and contractors with details of available parking sites
visitors                      (including a map if applicable) during works
                         • Staff to commute together, limiting vehicles onsite
                         • Heavy machinery to park within the project footprint
                                    Pedestrian and Cyclist Management
Pedestrian and       Safety measures to be implemented to protect the safety of pedestrians onsite
cyclist access to    include:
and onsite               • Designated clearly marked pedestrian only walkways that are kept clear
                         • Designating and clearly signing ‘no-go’ zones into the site
                         • Implementing safe work distances
                         • Ensuring all workers and visitors wear high visibility clothing onsite
                                               Public Transport
Effects on public    Not applicable – Neither the construction of the site or the resultant traffic are
transport            expected to affect public transport services or access to public transport services
services




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 13

                                              Speed
Management of        Measures to be implemented to ensure onsite vehicle speeds include:
onsite vehicle         • Worksite speed limits set at 10km/h, or as indicated onsite
speed
                                           Vehicle Movements
Heavy vehicle        Measures to be implemented to ensure safe heavy vehicle access include:
access and              • Assess site and trim low lying branches
mobile cranes           • Spotter to guide machinery in and out of site.
Licensing and        Measures to be implemented to ensure safe operation of vehicles include:
qualifications          • Checking licenses and qualifications when recruiting drivers/operators or
                            hiring contractors
Site access          Measures to be implemented to ensure safe access of vehicles include:
                        • Following entry and exit signage to the site
                        • Ensuring drivers driving out onto public roads can see both ways along a
                            footpath before they move onto it
                        • Ensuring vehicle access is staggered to prevent queuing on roads and
                            unnecessary disruption to traffic
Road and lane        Road closures are not anticipated to be necessary as all of the works are contained
closures             within the project footprint
                     Consultation with the project arborist will identify any needs for traffic control
                     and/or lane closures
Reversing            Measures to be implemented to reduce the need for vehicles to reverse include:
vehicles                • Installing a turning circle so vehicles can turn without reversing
                     When it is necessary to reverse:
                        • Using reversing sensors, cameras, mirrors and warning devices such as
                            reversing alarms
                        • Ensuring workers and site visitors are familiar with reversing areas
                        • Ensuring drivers who cannot see clearly behind have another person
                            directing them before reversing


                           Codes of Practice and Legislation applicable to this Plan
Legislation and Regulations
   •    Agricultural Chemicals Distribution Control Act 1996 and Regulation 1998
   •    Chemical Usage (Agricultural and Veterinary) Control Act 1998 and Regulation 1999
   •    Environmental Protection Act 1994
   •    Environment Protection and Biodiversity Conservation Act 1999 (Federal)
   •    Environment Protection and Biodiversity Regulations 2019 (Federal)
   •    Land Protection (Pest and Stock Route Management) Act 2002
   •    Local Government Act 2009
   •    Nature Conservation Act 1992
   •    Nature Conservation (Administration) Regulation 2017
   •    Nature Conservation (Wildlife) Regulation 2006
   •    Nature Conservation (Plants) Regulation 2020
   •    Nature Conservation (Animal) Regulation 2020
   •    Nature Conservation (Wildlife Management) Regulation 2006
   •    Nature Conservation (Protected Are Management) Regulation 2017
   •    Work Health and Safety Act 2011
   •    Work Health and Safety Regulation 2011
   •    Marine Safety (Domestic Commercial Vessel) National Law Act 2016 (National)
   •    Queensland Building and Construction Commission Act 1991 and Regulation 2003




                                         P.O. Box 320, Eudlo          E. [email protected]
                                         Queensland, 4554,            P. 0408 011 584 | ABN 18 766 198 454
                                         Australia                    www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 14

   •   Transport Operations (Marine Safety) Regulation 2016
   •   Transport Operations (Marine Safety) Act 1994
   •   Transport Operations (Road Use Management) Act 1995 and Regulation 2009
   •   The Animal Care and Protection Act 2001

Codes of Practice
   •   First Aid in the Workplace Code of Practice 2021
   •   Hazardous Manual Tasks Code of Practice 2021
   •   How to Manage Work Health and Safety Risks Code of Practice 2021
   •   Managing Noise and Preventing Hearing Loss at Work Code of Practice 2021
   •   Managing Risks of Plant in the Workplace Code of Practice 2021
   •   Managing the Risk of Falls at Workplaces Code of Practice 2021
   •   Managing the Work Environment and Facilities Code of Practice 2021
   •   Occupational Diving Work Code of Practice 2005
   •   Preparation of Safety Data Sheets for Hazardous Chemicals Code of Practice 2021
   •   Traffic Management for Construction or Maintenance Work Code of Practice 2008
   •   Work Health and Safety Consultation, Co-operation and Co-ordination Code of Practice 2021
   •   Working near Overhead and Underground Electric Lines (worksafe.qld.gov.au)


                         SWMS Applicable to this Work Health and Safety Plan
                   SWMS Bush Regeneration




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Page 15

Appendix 4 - Emergency Management Plan


           EMERGENCY EVACUATION PLAN
            94 Noosa drive, Noosa Heads

    Fire Extinguisher


    First Aid Kit


    Emergency Evacuation
    Point




                            Important Numbers
                                  Emergency:      000
                              Non-emergency:      13 74 68
                               Closest Doctor:    Noosa Heads Medical (07) 5489 8066
                              Closest Hospital:   Noosa Hospital (07) 54 559200
                    Poison Information Centre:    13 11 26




                                      P.O. Box 320, Eudlo           E. [email protected]
                                      Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                      Australia                     www.biodiverse-environmental.com.au


                                FLORA | FAUNA | REHABILITATION | FIRE | WATER

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.