PR18082_BIK_Settlers Cove Stage 4_RevC · OPW18/0253
Attached to the e-mail Operation Works Application OPW18/0253.
Green Tape Solutions
Quality, Integrity, Experience
Action Responsibility Timing/ Performance objectives Reference
required /who to contact frequency
covenant management g fuel control treatment/re
area contractor works moval
Maintain Body Corporate Timing/ Compliance with AS 1851-2012. Section 2.5
internal and and fire services frequency is to Maintenanc
external fire specialist be in e of fire
services accordance with services
AS 1851-2012
Maintain Body Corporate At all times Pedestrian access path is clear of
pedestrian and on-site obstacles.
access path manager Signposting of the path is prominent
to the fire to QFES.
hydrant on
the edge of
the
covenant
area and
signposting
Review and Body Corporate Timing/ Compliance with AS 3745-2010.
maintain frequency is to
the be in
evacuation accordance with
manageme AS 3745-2010
nt plan
Prepare the Body Corporate, Annually prior to Check and/or complete the property Section 2.6
building for on-site manager the start of maintenance tasks in Section 3.8. Property
the fire and residents September Barbecue gas bottles are not directly maintenanc
danger exposed to bushfire hazard in the e
season covenant area.
Advise Body Corporate As new Residents have been
residents to and residents residents advised/reminded to follow this BIK.
review and arrive/annual
adhere to review prior to
this BIK September
References
C&B Consultants Pty Ltd (C&B Group) 2005, Ecological Restoration Plan & Specifications –
Settler’s Cove, Noosa Heads, Report to Settler’s Cove Development Pty Ltd
C&B Consultants Pty Ltd (C&B Group) 2005, Fauna Management Plan, Settler’s Cove, Noosa
Heads, Report to Settler’s Cove Development Pty Ltd
Green Tape Solutions, 2018, Fauna Management Plan for Stage 4, Report to Settler’s Cove
Development Pty Ltd
LandGraphics Landscape Architects, 2005, The Landscape Master Plan, Settler’s Cove, Noosa
Heads, Report to Settler’s Cove Development Pty Ltd
Standards Australia Limited (Standards Australia) 2009, Australian Standard 3959-2009
Construction of buildings in bushfire prone areas, Incorporating amendments 1, 2 and
3, 10 March 2009
WBM Oceanics Australia (WBM) 2005, Fire Management Plan Settler’s Cove, prepared for
Settler’s Cove Development Pty Ltd, 21 July 2005
PR18082_BIK_Settlers Cove Stage 4 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PR18082_BIK_Settlers Cove Stage 4_RevC.pdfRelated documentApplication case desk ↗
About this file
- File size
- 564 KB (small file)
- File type
No other editions are linked here.