Minor Change Report MCU22 0087 01 (As Published)
Existing Condition 28
Site Access and Driveways
28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and
manoeuvring areas of the development. The works must be generally as shown on drawing
number C40 revision C prepared by Recor dated 29 November 2022.
Applicant’s Request
The applicant has requested existing Condition 28 be amended to read as follows:
Site Access and Driveways
28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and
manoeuvring areas of the development. The works must be generally as shown on drawing
number C40 Revision F prepared by Recor dated 31 October 2025.
Assessment of Request
Agree
As included above, the development provides adequate manoeuvring on site and the proposed
amended driveway provides safe access.
Recommendation
It is recommended existing condition 28 be amended to read as follows:
Site Access and Driveways
28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and
manoeuvring areas of the development. The works must be generally as shown on drawing
number C40 revision C prepared by Recor dated 29 November 2022 revision F prepared
by Recor dated 31 October 2025.
Existing Condition 32
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with drawing number C40
revision D prepared by Recor dated 15 March 2023 and include on-site rain water storage
(9,000 litres) used for non-potable purposes. The design of the on-site rain water system
must be submitted to Council at least 5 business days prior to the pre-start meeting.
Condition 32 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Applicant’s Request
The applicant has requested existing Condition 32 be amended to read as follows:
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with drawing number
C40 revision F prepared by Recor dated 31 October 2025 and include on-site rain water
storage (9,000 litres) used for non-potable purposes. The design of the on-site rain water
system must be submitted to Council at least 5 business days prior to the pre-start meeting.
On 4/11/2025 the Applicant requested by email that the requirement for onsite rainwater storage
be reduced from 9000 litres to 3000 litres.
Page 25 of 34
Document Set ID: 23692796
Version: 12, Version Date: 20/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.