Original source · versioned page text
Engineering Plans
Original PDF page 4, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnmotorcycle DP
50
11 0.2
4
R L parking
PAD 120.3m
12
30 X 3,234m²
RL
X RL 120.6
2
S PROPOSED EARTHWORKS FILL
BW 1
X
TW
RL 120.395 X W
SW
X
RL 120.55 X
0.6
FFL U120.4m .40 PROPOSED RETAINING WALL
FFL 120.5m 119
12
10
FFL 120.25m S
RL
PAD 120.1m
12
TW 120.1 U 11 PAD 119.95m PAD 120.2m
PROPOSED BUILDING RETAINING WALL
0.4
U 03
9.4 00
BW 119.500 RL 120.5 X
RY
0 .3
RL U 12
30
11 19.9
0.2 120
0
75 12 12
BOUNDA
0
RL
0.4
SW
.4 Q100 OVERLAND FLOW PATH
BWW 1
U 12
0
X
X
FFL 120.2m
U 04
9.4 00
A
12
RL 120.45 X
T
DP
80
11 .8
12 RL 120.2 X PAD 119.9m FFL 21.0
9
TW 119.8 FFL 120.2m 0.2 PROPOSED BUILDING LEVELS
1
BW 119.3 00
BW 1
0
0.1
U 12
RL 120.15 X
TW
EXISTING
PAD 119.9m PAD 20.7
RL
12
40
12
RL
SW
0.1
X
.
X
RL
L.P
FFL 120.10m
5X
RL
X
RL 120.15 X
12
RL
12
85
0.0
X RL 119.90 L.P. PAD 119.80m
0.2
12
19.
H.
FFL
U 09 120.15m
0.2
P.
RL
L1
TW 119.8
.0
A
.12
X
9.4 00
X
RL
12
PAD 119.85m 11
20
.10 9.60
XR
BW 119.0 50
0.1
50
20
0.0
11 19.9
L1
12
120
0
12
1
5
TW119.8 95
U 05
12
0.1
SW
.00
X
0.1
XR
RL
RL
BWW 1
RL
5
12
R05 BW119.0 00
RL 1
0.0
X
X
RL 120.15 X
.975 20.0
0
X
RL
DPDP
119
12
120.0
9 118.80
T
.80 X
95 L 11 RL
X
RL
X R 120.05 120
X
119
.60 DP
X RL .2 X FFL 120.2m
119.40
PAD 119.9m 115.20
SW
119.00 FFL 120.2m U 05
119.20
CONSTRUCT RETAINING FFL 120.05m
RL
PAD 119.9m U 06
.10
BIO FFL 120.1m
12
U 07
20
WALL AT EXTENTS OF BIO PAD 119.75m
0.1
119.00
TW 119.900
0
BW 119.280
L1
PAD 119.8m
0X
RL119.0
8.6
U 08
XR
TW 119.900
BW 119.080
119.2101
PROPOSED BIO RETENTION 0
TW 119.800
8.8
BW 118.750
SW
APPROX. EARTHWORKS QUANTITIES:
BASIN WITH CONCRETE 11
TW 119.900
BW 118.480
TW 119.750
NATURAL SURFACE v DESIGN
BW 118.450
DETENTION TANK
TW 119.800
BW 118.290
TW119.800
BW118.200
WEIR 119.35 117.80
E
00
CUT -12m³
NT
UNDERNEATH. REFER TO
BW118.3 00
00
DRAINAG
40
117.20 116.80 5. FILL 2688m³
TW119.8
6.00
116.8
EASEME
2123-R07 FOR DETAILS 117.11 6.4
6.6
6.2 11
7.00 BIO -53m³
116.60 TANK -132m³
BOXING (0.3m) -462m³
EXISTING GRASS
SW
RY
EXISTING BOUNDA
IMPORT 2029m
SW
TURFED SWALE (SOLID VOLUME)
EMERGENCY RELIEF OVERLAND FLOW
INDICATES DROP EDGE RETAINING WALL THROUGH BACK OF CARPARK U05 & U06
TO BE INCORPORATED INTO BUILDING. NOTE
c:\users\kurt\desktop\2123 taylor court cooroy\acad\2123 opw set.dwg
NOTE, TOP OF WALL LEVEL = PAD LEVEL · CUT AND FILL SHADING REPRESENTS EARTHWORKS
B
DRAINAGE BETWEEN NATURAL SURFACE AND BOXING
C
RESERVE SURFACE LEVELS
5
NOTE:
R0
REFER ARCHITECTURAL DRAWINGS FOR PAD LEVELS FOR ALL BUILDINGS 300mm BELOW FFL
FINAL BUILDING FOOTPRINTS AND FLOOR · ROAD BOXING 300mm BELOW FINISH See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.