Log in to see the plans as drawn PROPOSED BUILDING REFER TO
ARCHITECTURAL DRAWINGS FOR
BUILDING FFL13.95
FFL 120.15m DETAILS BUILDING FFL13.95
FFL 120.20m BUILDING FFL13.95
FFL 120.10m
FINISHED SURFACE
PAD 119.85m PAD 119.90m PAD 119.80m
BDY
DRAINAGE LOT 3
RESERVE FALL FALL FALL FALL 3,234m²
300mm STEP OF FSL AT BUILDING EARTHWORKS LINE - PAD LEVEL 300mm STEP OF FSL AT BUILDING
(300 BELOW FFL) - TYPICAL NATURAL SURFACE
A SECTION A
R04
0 2 4 6 8 10m
SCALE 1:200 A3
BUILDING FFL13.95
FFL 121.00m BUILDING FFL13.95
FFL 120.90m BUILDING
FFL FFL13.95
120.225m BUILDING FFL13.95
FFL 120.20m
PROPOSED BUILDING REFER TO FINISHED
PAD 120.70m PAD 120.60m PAD 119.925m SURFACE PAD 119.90m
ARCHITECTURAL DRAWINGS FOR DETAILS
FALL FALL
FALL FALL
NATURAL SURFACE
DROP EDGE RETAINING WALL TO BE
INCORPORATED INTO BUILDING DESIGN
B SECTION B (TOP OF WALL TO BUILDING PAD LEVEL).
R04 REFER TO LEVELS SHOWN ON 2123-R04
0 2 4 6 8 10m
SCALE 1:200 A3
BUILDING FFL13.95
FFL 120.20m BUILDING FFL13.95
FFL 120.45m BUILDING
FFL FFL13.95
120.225m BUILDING FFL13.95
FFL 120.80m FINISHED BUILDING FFL13.95
FFL 120.70m BUILDING FFL13.95
FFL 120.90m
SURFACE
PROPOSED BUILDING REFER TO PAD 119.90m PAD 120.15m PAD 119.925m PAD 120.50m PAD 120.40m PAD 120.60m
FINISHED SURFACE ARCHITECTURAL DRAWINGS FOR DETAILS
FALL FALL
FALL FALL
BIO RL 119.00 EARTHWORKS LINE - PAD LEVEL
NSL
EARTHWORKS LINE - PAD LEVEL (300 BELOW FFL) - TYPICAL
NATURAL SURFACE
(300 BELOW FFL) - TYPICAL
c:\users\kurt\desktop\2123 taylor court cooroy\acad\2123 opw set.dwg
C SECTION C
PROPOSED DETENTION TANK R04
NOTE:
REFER TO 2123-R07 FOR DETAILS.
0 2 4 6 8 10m REFER ARCHITECTURAL DRAWINGS FOR
FINAL BUILDING FOOTPRINTS AND FLOOR
PLANS TO PROPOSED DEVELOPMENT.
SCALE 1:200 A3
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED INDUSTRIAL DEVELOPMENT 2123
A 15-12-2021 FOR APPROVAL KE DB LOT 4 TAYLOR COURT, COOROY
DATUM AHD SHEET: 5 OF 10
0 2 4 6 8 10m MAROOLINGAR P/L ATF TWENTY20 UT
DESIGN KE
................. DRAWING TITLE: DRAWING NUMBER REV
DRAWN KE Director: CAMERON LANDRETH
SCALE 1:200 A3 Director: TONY SHELLEY
(RPEQ p 07 5443 8285 EARTHWORKS SECTIONS R05 A
DESIGN CHECK CL (RPEQ19358)
7736)
This drawing is not to be copied or amended without written permission from e [email protected] w www.barlowshelley.com.au
DATE DEC-2021 Barlow Shelley Consulting Engineers a PO Box 899 Maroochydore 4558 ABN 89 215 591 077
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.