SUPERSEDED - Decision Notice - Approved by Delegation of Authority MCU21 0215

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Officer: 	Jada Lyons
Direct Telephone: 	07 53296527
Our Reference:	MCU21/0215
Your Reference:	03000
4 May 2022
9 Dot
C/- Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS  QLD  4567
[email protected]
Dear Sir/Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 27 April 2022, Council decided to approve the application, subject to conditions.
Details of the decision are as follows:
application details
Application No:	MCU21/0215
Street address:	9 Bartlett Rd Noosaville Qld 4566
Real property description:	Lot 48 RP 173566
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Material Change of Use - Warehouse
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions – warehouse
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
21015 SD01	B	Ground Level Plan, prepared by Sprout Architects	03/03/2022
21015 SD02	B	Mezzanine Level Plan, prepared by Sprout Architects (annotated by Council)	03/03/2022
21015 SD04	B	Elevations, prepared by Sprout Architects	03/03/2022
21015 SD05	B	Elevations, prepared by Sprout Architects	03/03/2022
21015 SD06	B	Sections, prepared by Sprout Architects (annotated by Council)	03/03/2022
21015 SD09	B	Perspective Views, prepared by Sprout Architects	03/03/2022
Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice.
Nature and Extent of Approved Use
This development approval is for three (3) tenancies, to be used as a Warehouse with a total gross floor area of 845m2.
The approved use must not operate outside the hours of 7am to 6pm Monday to Saturday and not at all on Sundays or public holidays. The requirements of this condition must be included in the Community Management Statement for any body corporate for the subject site.
The approved buildings must not be used for the purpose of self-storage facilities.
Any display and retail sale of goods must remain an ancillary component to the approved use, have a direct relationship with the industrial use (i.e. result from the industrial business activity) and must not exceed 30% of the total gross floor area of each tenancy.
The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions.
Currency Period
This development approval lapses if the use has not happened by 27 April 2028, unless an application to extend the currency period is approved by Council.
Building Height
The maximum height of the development must not exceed 10 metres above the finished ground level and the natural ground level.
Building Appearance
The development must be finished with subdued external building colours.
All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontage.
Fencing and Walls
The existing boundary wall on the southern boundary must be maintained for the life of the development.
Any fencing to the road frontage must be set back at least 1 metre from the street boundary and must have a minimum average setback of 2 metres to the street boundary. All land between the fence and the front property boundary must be densely landscaped.
Community Management Statement
Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment.
All clauses and by-laws of the proposed Community Management Statement must accord with the requirements of this Decision Notice.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping Works
All landscape works must be established and maintained in accordance with the approved design for the lift of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached.
All landscape works must be maintained generally in accordance with the approved design for the lift of the development.
Street Identification
The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name.
Water & Sewer Connections
An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site.
ENGINEERING
Site Access and Driveways
A sealed access driveway must be provided from Bartlett Road to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular a driveway crossover in accordance with council standard drawing RS-051.
Car Parking
A minimum of 14 car parking spaces and 8 motorcycle spaces must be provided and marked on the site and made available and accessible at all times while the use is open for business. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
1 disabled parking space/s within the total;
dimensions, crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities.
Directional signage must be provided to direct visitors and customers to the car parking spaces provided on site.
Service Vehicles
Service vehicle parking, manoeuvring and standing spaces must be provided on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
1 MRV space; and
occasional access for a LRV.
Pedestrian and Bicycle Facilities
Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
a total of 6 bicycle parking spaces;
end of trip facilities involving 3 lockers.
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and generally in accordance with plan 124-003-300, Rev A, titled “Grading and Drainage Layout Plan”, prepared by BAX Engineering.
Services
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All fill and associated batters must be undertaken in accordance with an Operational Works approval and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council.
All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
reasons for refusal – caretaker’s accommodation
The proposed Caretaker’s Accommodation does not comply with Overall Outcome 2(b), Acceptable Outcome AO2.2 and Performance Outcome PO2 of the Caretaker’s Accommodation, Dwelling Unit and Rural Worker’s Accommodation Code, and Overall Outcome 2(l), Performance Outcome PO7 of the Low Impact Industry Zone Code, as:
There is no demonstrated genuine operating need for full-time caretaking of the industrial use;
There is no demand for 24 hour care of buildings, operations, plant or equipment;
It is not on a site with an area of at least 2,000m2.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Advertising Devices
All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1 (Administration) 2015 including both temporary and permanent signage. All freestanding, pylon or pole signs or signage that is illuminated requires approval from Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is prohibited from being erected in the Shire.
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Operational Works	Stormwater, Earthworks, Access, Carparking.
Development Permit for Building Works	All building work.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Jada Lyons
Assistant Development Planner

Enc:	Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer1.xml]
Page 4 of 7

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 7

[Attachment: image3.png (image text)]
ee) NOOSA COUNCIL
Log in to download the original file

SUPERSEDED - Decision Notice - Approved by Delegation of Authority MCU21 0215.docx · 346 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.