Council archive · source document
Information Response · MCU15/0014
Attached to the e-mail MCU15/0014 - Information Response.
6. Provide additional detail on how the “intercom” system will overcome the potential issue where a
visitor accesses the site to find that the visitor spaces are occupied. The detail must include on-
site manoeuvring of the vehicle if all of the spaces are occupied.
Response:
Refer attached swept path diagrams prepared by SCG Consulting Engineers. The swept path diagram
demonstrates that onsite manoeuvring of a visitor vehicle can occur even if all of the spaces are
occupied.
Issue – Acid Sulfate Soils
7. Provide a preliminary acid sulphate management plan to address the potential issues associated
with the filling of the site.
Response:
Refer attached correspondence prepared by SCG Consulting Engineers. This correspondence confirms
that the proposed filling of the site will not lead to an increased risk of acid sulfate soils creation.
The Information and Referral Stage of IDAS has now concluded. We ask that you now provide details
of adjoining owners in order that we may commence the public notification of the application.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
KHA DEVELOPMENT MANAGERS
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 318 KB (small file)
- File type
No other editions are linked here.