Log in to see the plans as drawn colourbond custom orb roofing
colourbond quad gutter & fascia
existing concrete block building
re-painted
Hardies 150mm Linea boards
paint finish
alum balustrading
new verandah
roof extension
2,700
FL15.25 galv shs posts
2,950
new timber slatted screen
& balustrading
FL12.30
natural ground
FL11.20 line existing unit new work
1,100
Hardies EasyLap cladding.
paint finish
south elevation west elevation
colourbond custom orb roofing
colourbond bargeboard
8.0m height line colourbond quad gutter & fascia
alum framed windows & doors
Hardies 150mm Linea boards
paint finish
2,700
alum balustrading alum balustrading
2,425
to match new work
FL15.25
existing concrete blockwork
2,700 250
to be re-painted
galv shs posts
175
galv shs posts
FL12.30 new tilt-a-doors as selected
nd line
1,100
natural grou
FL11.30
100
2,050
Hardies EasyLap cladding.
paint finish
new work existing unit
north elevation east elevation
no. date amendments
A 8 JUNE 2020 improvements to existing dwelling unit
Client Location Drawing Drawn Scale
J & H COONEY ELEVATIONS AM 1:100@A2
3 AVOCET PARADE 1:200@A4
Project PEREGIAN BEACH Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED DUPLEX
DEVELOPMENT
16.1219-5A DEC 2019 5A