Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 4.1
Risk Based Planning Risk based planning is a critical element of all phases of PPRR. In
Queensland this is achieved through the Queensland Emergency
Risk Management Framework (QERMF) risk assessment process.
A QERMF assessment was completed in 2022 for Noosa
Shire by BMT. Six hazard scenarios were chosen for Noosa in
collaboration with QFES which guided the assessment process.
The following hazards were considered:
• Scenario 1: Severe Tropical Cyclone
• Scenario 2: Category 2 Cyclone / East Coast Low
• Scenario 3: Severe thunderstorm event
• Scenario 4: Earthquake
• Scenario 5: Bushfire
• Scenario 6: Heatwave
Additionally, a non-natural hazard risk assessment was
completed using the QERMF. The 2022 risk assessment
was informed by the Noosa Shire Disaster Risk Assessment
undertaken in 2011, updated with the most recent information
from authoritative sources on incident frequency and
consequences. The non-natural hazard risk assessment
provided a high-level risk rating, based on assessed likelihood,
vulnerability, and consequence for these hazards for the whole of
Noosa Shire.
Noosa Council | 2023 Local Disaster Management Plan 46
Page 112 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.