Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 8.4
Activation of LDMG During the response phase, the LDMG will consider the impact
of the disaster. If the event is of sufficient magnitude, the LDMG
Recovery Group
may decide to activate its Recovery Group to coordinate recovery
operations.
The Recovery Group is likely to be activated in the following
circumstances:
• An event where significant loss or damage is sustained
impacting the community, economy, environment and / or the
infrastructure of the Noosa Shire Council area.
• An event that creates significant disruption to the
communities’ connectedness or overwhelms local resources
or the capacity of the community to cope or recover
independently.
• An event that the LDMG determines has ongoing impacts
and requires a coordinated and collaborative multi-agency
approach to recovery.
• If requested to activate by the DDMG.
Noosa Council | 2023 Local Disaster Management Plan 91
Page 157 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.