Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 8.10
Recovery Subgroups Often a disaster will be of such a scale that all functions need
to be addressed to effect recovery. To assist with managing
capacity and resourcing issues and to reflect other areas of
infrastructure that Noosa Council is responsible for i.e., water,
wastewater, and waste, the Local Disaster Recovery Group
(LDRG) will likely organise itself with four Functional Recovery
Subgroups to address the five lines of recovery as follows:
• Human & Social
• Economic
• Infrastructure
• Environment and Waste
This structure is depicted in section 2.8 of this plan.
The need to establish one or all of the Subgroups is the
responsibility of the LDRG and will depend wholly upon the scale
of the event and the complexity of the recovery effort.
Noosa Council | 2023 Local Disaster Management Plan 96
Page 162 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.