Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 8.18
Event Specific The Queensland Reconstruction Authority have developed a
process to develop an event-specific Local Recovery Plan. The
Recovery Plan
methodology, action plan template and the ‘plan on a page’ Local
Recovery Plan template can be found here: https://www.qra.qld.
gov.au/recovery-hub/recovery-planning-templates
The LRC is responsible for working with the LDMG Recovery
Group (where activated) to develop the plan and then for
obtaining endorsement for the event-specific recovery plan from
the LDMG. If developed, an event-specific Recovery Plan should
be adopted by Noosa Shire Council.
Following adoption, the plan should be uploaded to the Council
website and promoted to the local community on a regular basis.
The LRC is responsible for working with the LDMG Recovery
Group (where activated) to develop the plan and then for
obtaining endorsement for the event-specific recovery plan from
the LDMG.
If developed, an event-specific Recovery Plan should be adopted
by Noosa Shire Council. Following adoption, the plan should
be uploaded to the Council website and promoted to the local
community on a regular basis.
Noosa Council | 2023 Local Disaster Management Plan 106
Page 172 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.