Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Reference Douments - 132004.4029.01 & RAL22/0010

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

        INTRODUCTION
       RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
       for a residential duplex development located at U2 6 Martin Street, Peregian Beach.

       This report investigates the stormwater management considerations for the existing and proposed development
       site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council
       requirements for stormwater drainage.




      Project number 20220116
      File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                Page 4 of 14
      Revision 1

Document   Set7 ID:
       P +61    521122141549
                     1003                                                                                             recorconsulting.com
                                        A 75 Noosa Drive, Noosa Heads, Qld 4567         E [email protected]
Version: 1, Version Date: 18/10/2022
Log in to download the original file

Reference Douments - 132004.4029.01 & RAL22_0010.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.