Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Reference Douments - 132004.4029.01 & RAL22/0010

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

            2.3. Proposed Development Drainage Pattern

                 2.3.1 Stormwater Concept
       Stormwater run-off will be managed by an internal network of pits and pipes to collect upstream run-off, run-off from
       impervious areas and roof drainage. The existing stormwater pit will be replaced and new piped outlets to discharge
       into the Martin Street verge will be provided as the lawful point of discharge from the development.

       The proposed development does not significantly alter existing run-off generation, and attenuation of the site is not
       required. The majority of run-off generated by the development will be from roof area, which will be drained by
       downpipes to discharge into the internal drainage network.

       The remaining ground areas of the site will drain as overland surface flows infiltrating into the site soils consistent
       with the current drainage conditions draining south towards the Martin Street road reserve.

       The roof and allotment drainage system for the proposed site shall be designed to comply with:

            1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards – Roads, drainage and
               earthworks;

            2. The Queensland Urban Drainage Manual (QUDM); and

            3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.

       Refer to Appendix A Proposed Development Plan for the proposed stormwater drainage layout illustrating the
       concept described above.



            2.4. Flood Considerations
       Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has identified that
       the site is located outside of any flood or inundation areas within the locality indicating it is not expected that that
       the proposed development will be subject to flooding.




      Project number 20220116
      File RECOR Preliminary Stormwater Management Report - 20220116.docx, 2022-09-27                                Page 6 of 14
      Revision 1

Document   Set7 ID:
       P +61    521122141549
                     1003                                                                                             recorconsulting.com
                                        A 75 Noosa Drive, Noosa Heads, Qld 4567         E [email protected]
Version: 1, Version Date: 18/10/2022
Log in to download the original file

Reference Douments - 132004.4029.01 & RAL22_0010.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.