Original source · versioned page text
Apdx1 - Proposal Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ISS DATE DESCRIPTION BY
A 11.07.21 COMMENT BVG
B 20.07.21 MCU ISSUE BVG
C 22.09.21 MCU ISSUE BVG
Metal roof sheeting
PITCHING
RL5150
2450
Weatherboard cladding, paint
Timber balustrade finish as selected.
ONE
RL2700
Aluminium framed
2700
glazing Rendered brickwork or fc
cladding, paint finish as
selected.
GROUND
RL0
1 NORTH ELEVATION 2 SOUTH ELEVATION LEGEND
1 : 100 1 : 100
Weatherboard cladding, paint
finish as selected.
Metal roof sheeting
PITCHING
RL5150
NORTH POINT NOTE: Figured dimensions to be taken in
preference to scaled. Verify all dimensions
Timber balustrade on site before commencing work or making
shop drawings.
IF IN DOUBT, ASK.
ONE
RL2700
Aluminium framed
glazing
This design is the property of the designer and may not be used,
copied, or reproduced wholly or in part, without the express permission
GROUND of the designer. Infringement in any way may result in legal action.
RL0 PROJECT
9 RUBY STREET, COOROY
Rendered brickwork or fc Rendered brickwork or fc @
cladding, paint finish as selected. cladding, paint finish as selected.
PROPOSED RENOVATION
PRELIMINARY
3 WEST ELEVATION 4 EAST ELEVATION FOR
1 : 100 1 : 100
CHRIS ROBINSON
DRAWING TITLE
LOT 1 - ELEVATION
PROPOSED
DRAWN DATE SCALE @ A3
BVG 11.07.21 1 : 100
1:100
PROJECT No. DRAWING No.
0 1 2 5m
2185_ C- 04-11_ C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.