Council archive · source document
Delegated Report - Code - Planning MCU23 0070 [As Published] · MCU23/0070
Performance Outcome Acceptable Outcome
PO9 AO9.1
Buildings and other structures: Buildings and other structures have a building
height of no more than:
a) are low rise and present a
building consistent with structures on • Sunshine Beach – building height of no
adjoining and surrounding premises; more than 12 metres; or
b) do not visually dominate the street or
surrounding areas;
c) preserve the amenity of surrounding AO9.2
premises including privacy, views and Where excavation is required, the maximum
access to sunlight; portion of the exposed external façade of the
d) respect the scale of any nearby building cannot exceed the building height in
vegetation, retaining a vegetated skyline; AO9.1
e) respond to the topography of the site;
f) have a maximum building height of:
• Coastal Communities –
A. Sunshine Beach– three storeys ;
The applicant submits that the proposal complies with the acceptable outcome AO9.1(b) and as
such, the proposal is deemed to comply with the relevant corresponding performance outcome
PO9(f)(ii)A as per the following extract from the scheme:
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify
ways in which performance outcomes can be met. Compliance with the performance
outcome should be demonstrated and the acceptable outcomes are considered as one
way to satisfy the corresponding performance outcome.
The Noosa Plan 2020 User guide also reinforces this position by noting that the planning scheme
is a performance-based planning scheme and includes the following commentary to this effect:
The Planning Scheme is a performance-based scheme, which means assessable development
is required to demonstrate how it can achieve the specified performance outcomes. The
performance outcomes are considered to be the qualitative outcome that must be achieved
whilst the acceptable outcomes are prescriptive, measurable criteria for development and
represent the preferred way of achieving the performance outcomes. Assessable development
is deemed to comply with the performance outcome if:
• the acceptable outcomes to the performance outcomes are complied with, or
• sufficient information is provided to demonstrate the criterion has been met through an
alternative solution.
The below figures provide a visual representation of the proposed new building and existing
adjoining property heights, indicating the building height is consistent with development in proximity
(refer to Figure 6). Additionally, the second storey constitutes carparking only, and is proposed to
be screened to the Duke Street frontage by battening and vegetation (within a planter box) and as
such is discreetly designed when viewed from Duke Street (refer to Figure 7), nevertheless the
building will still have the appearance of a 4 storey building.
Document Set ID: 22664948
Version: 13, Version Date: 17/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU23 0070 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.