               34.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
               35.    Directional signage must be provided to direct visitors and customers to the car parking
                      spaces provided on site.
               36.    Suitable signage must be provided to carspaces V1, R3 and C3 to indicate that the spaces
                      are “reserve in only”. The signage must be clearly indicated on any plans submitted for
                      Operational Works.
                      Pedestrian and Bicycle Facilities
               37.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      A minimum of 3 bicycle spaces.
                      Stormwater Drainage
               38.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and be generally in accordance with the Site Based Stormwater Management Plan
                      reference number M3024E_DA1_SBSMP, Revision B dated September 2023 prepared by
                      JFP.
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               39.    Reticulated electricity and telecommunication services must be provided to each unit/lot in
                      accordance with the standards and requirements of the relevant service provider.
               40.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               41.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               42.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               43.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               44.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               45.    All earthworks and associated retaining structures/batters, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               46.    All earthworks on site must be carried out in accordance with the recommendations
                      contained in the Geotechnical Investigation report number J001873-001-R-Rev 1 dated
                      August 2023 prepared by Core Consultants.




Document Set ID: 22664948
Version: 13, Version Date: 17/01/2024

Used in these records

About this file

File size
6.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU23 0070 [As Published].pdf · 6.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.