34. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
35. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
36. Suitable signage must be provided to carspaces V1, R3 and C3 to indicate that the spaces
are “reserve in only”. The signage must be clearly indicated on any plans submitted for
Operational Works.
Pedestrian and Bicycle Facilities
37. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. A minimum of 3 bicycle spaces.
Stormwater Drainage
38. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with the Site Based Stormwater Management Plan
reference number M3024E_DA1_SBSMP, Revision B dated September 2023 prepared by
JFP.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
39. Reticulated electricity and telecommunication services must be provided to each unit/lot in
accordance with the standards and requirements of the relevant service provider.
40. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
41. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
42. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
43. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
44. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
45. All earthworks and associated retaining structures/batters, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
46. All earthworks on site must be carried out in accordance with the recommendations
contained in the Geotechnical Investigation report number J001873-001-R-Rev 1 dated
August 2023 prepared by Core Consultants.
Document Set ID: 22664948
Version: 13, Version Date: 17/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU23 0070 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.