Council archive · source document
Delegated Report - Code - Planning MCU23 0070 [As Published] · MCU23/0070
4. On 21 October 2021, Noosa Council adopted a new local law for short stay letting and home
hosted accommodation. The local law commenced on 1 February 2022. A one off application
will need to be made, under the new local law, for all existing and new properties operating
short stay letting or home hosted accommodation, unless identified as exempt.
For more information and application forms, please visit Council’s website below:
https://www.noosa.qld.gov.au/short-stay-letting-home-hosted-accommodation-local-law
Food Business Licences
5. Applications for food business licences under the Food Act 2006 are to be submitted to
Council prior to the commencement and construction of the Food and Drink
Outlet. Applications for Design Approval and Approval to Operate (including applications for
licences under the Food Act 2006) are to be submitted to and approved by Council for the
food premises, prior to the issue of a Development Permit for Building Work.
Development Compliance Inspection
6. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Resubmission of Amended Plans Required
7. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plans to Council’s Development Assessment
Branch with the Reference No. MCU23/0070, separate to any Operational Works application.
To avoid delays and assessment issues with the Operational Works application, it is
recommended the plans be resubmitted prior to lodgement of any Operational Works
application. However, should the plans not be submitted, the applicant is advised that a
Preliminary Approval may be issued in lieu of a Development Permit.
Sustainability
8. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Qualified Person
9. For the purpose of preparing an Arborist Report, a qualified person is considered to be a
person with either:
d. ISA certification; or
e. a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
the field of arboriculture.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Access and parking, Stormwater, Drainage work,
Earthworks, Landscaping
Development Permit for Building Works All building work.
Document Set ID: 22664948
Version: 13, Version Date: 17/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU23 0070 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.