Appendix A - Proposal Plans · OPW16/0212

Attached to the e-mail Development Application MCU16/0117 & OPW16/0212.

of 9

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

 

 

    

 

 

 

 

 

 

   

 

     

 

 

 

   
  

      

 

 

 

 

 

     

 

 

 

   

 

 

 

      

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EROSION AND SEDIMENTATION MANAGEMENT PLAN ENVIRONMENTAL DIARY Corman
Sediment Control Weekly Visual Inspection or After Rainfall Event 17 rea 428
Project:— Operational Works — PROPOSED RESIDENCES
Principals” T ROSSITER & S MURPHY “THE SOLE USE OF THE CLIENT NO PART
Contractor:—
Objective Comply with all statutory regulations and maintain erosion and sedimentation . MAY BE USED IN PART OR WHOLE WITHOUT
4 + th + + Location:— LOT 1 (SP248165) OPAL ST, COOROY PRIOR EXPRESS WRITTEN CONSENT OF
> s throughout the duration of construction. Comply wi the intent of Job Ref 160604 LINDSAY CONSULTING PTY LTD
lo ef.
the sedimentation management plan shown on sheet 29 of the drawings
oropar d by Noel C voy sesociote ‘and other measures as deem : Dae [1 Regular Monitori (We ky) CLIENT AND PROJECT DESCRIPTION
e oel Covey & Assi S, ¢ easures as deeme jate:— ‘egular Monitoring (Weekly
necessary to control erosion and minimise sediment transport oe . . yo . 1 T ROSSITER & S MURPHY
Approx Time:— am/pm [1 Special Event Monitoring (briefly describe event) PROPOSED RESIDENCES
Management Strategy mwater land s and flows resulting Dat C ti LOT 1 (SP248165) OPAL ST
. . ate sis orrective
rom construction, and pro ant fe , rock filter dams, turf strips, Item Control condition | Action Corrective Action Taken COOROY
stormwater pit entry filters, and other measures as shown on the plan or as Monitored Measure y Required (Describe)
deemed necessary to prevent uncontrolled stormwater flows over unprotected Installed U
areas, and avoid sediment transport to waterways and stormwater pit
Tasks and Actions Erect sediment barriers as shown on sheet 29 of the drawings, and at other Sediment DRAWING TITLE
Required locations as deemed necessary by visual inspection. Temporary rock filter CONSTRUCTION MANAGEMENT
dams are to be placed at all concentrated stormwater flow outlet locations
and maintained with fresh filter screenings throughout the duration of Rock
construction. All earthworks areas to be topsoiled and seeded or puter
hydromulched upon completion of profili All footpath areas to be SCALES
provided with a minimum 4m wide turf strip behind kerb and channel
immediately after path area construction and topsoil profiling is Stormwater
Performance Indicators ipdeted., gp Strategically place filters around all stormwater pits Outlets 0 ? l, 6 8m
. check for erosion and sediment flows at base of all
embankme Catchpit Orig 1200
exposed areas after rain; Areas
. check that rock filter dams are working during rain periods;
. check that all sediment fences and other erosion control
mechanisms are Pavement Areas SURVEY DATUM
working during rain periods; and
Monitoring Site FoPLFAn NS HIPIRETDHESEMIGRES GOVGTSsdBicBltae UbFerbHM Reeds:
kly basis and after every rainfall event. Any damaged Bottom of ASSOCIATED CONSULTANTS
trol item is to be rectified, and trapped silt removed and Embankment
deposited in an area not prone to erosion.
Responsible Person Site Foreman to be responsible for all inspections and maintenance of sediment Humeceptors/
contral ciree Gross Pollutant
ontrol_ measure Traps
Reporting Site Foreman is to complete the Environmental Diary for sediment control on a
weekly basis as a minimum, but also after every significant rainfall event or
other sp | event affecting the sediment control measures. The Detention Basin
Environmental Diary shall be completed and delivered to the Superintendent for
record -and-andit—purp ith—eaeh—progress—ctai—for_the—eonstrietior res
Corrective Actions The Site Foreman to arrange for installation of additional sediment Other
controls and/or improve maintenance controls and replacement of
nings to filter dams as required, and report on measures taken Any Special Comments:—
in_ the Environmental Diary. Signed:—

 

 

 

 

 

 

 

 

 

REVISION LIST
A [ORIGINAL ISSUE 15/9/2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{Computer File
160604FP.DWG

 

DRAWING NUMBER SHEET] REV.

16-0604-C5 S|A

 

 

 

 

 

 

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

APPENDIX A - PROPOSAL PLANS.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.