Original source · versioned page text
Appendix C - Code Assessment
Biodiversity, Waterways and Wetlands Overlay Code
Clearing vegetation (other than for a driveway access)
does not extend beyond—
a) 30 metres of a building or 10 metres of a class 10a
structure on lots greater than 10 hectares; or
b) 10 metres of a building or class 10a structure on
lots 10 hectares or less but more than 3,000m2; or
c) 3 metres of a building or class 10a structure on
lots 3,000m2 or less.
AND
AO1.4
Clearing of vegetation for a boundary fence does not AO1.4 – Complies
extend beyond 5 metres either side of the fence The proposal does not intend to clear any vegetation for
the purpose of a boundary fence. Conditions can be
imposed to this effect.
Reconfiguring a lot Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable solutions Assessment
Reconfiguring a lot
PO2 AO2 AO2 – Complies
New lots are only created if they maintain ecological Where clearing vegetation for the purpose The proposal does not intend to incorporate any
linkages and minimise the clearing of vegetation. of Reconfiguring a Lot: vegetation clearing for the purpose of the
reconfiguration. While a new boundary would be created
a) new boundaries to lots do not transect and which transects a watercourse, it follows an existing
fragment existing native vegetation; fence line and causeway over the waterway in a cleared
b) new lots are created to allow for part of the site. The ecological linkage along the
suitable building envelopes for future buildings and waterway will be maintained in its current state.
works to be located within existing cleared areas
or areas of low ecological value;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.